Laserfiche WebLink
Nov- 19. 2004 3: 17P No-9751 P. 4 <br /> reading of 3%on the north property boundary. The gas concentration of methane <br /> observed from the bar hole punch was written as an area of concernfor section 20919 <br /> of Title 27 California Code of Regulations(27 CCR),Gas Control. The inspection <br /> report documented that a work plan must be provided to this LEA for installation of <br /> gas migration probes within 90 days by November,2003. (Exhibit A) <br /> IV. On August 25 h,2003,lay Kamine of URS spoke with this LEA to inform that URS <br /> will be contracted to conduct any work required by this LEA. This LEA requested to <br /> URS that permanent monitoring wells for gas migration are to be installed on each <br /> property boundary. <br /> V. On September 18`h,2003,this LEA sent a written notice requiring Tandy <br /> Corporation to install four permanent monitoring wells for gas migration at each <br /> property boundary of the site. (Exhibit B) <br /> V1. On November 17`n,2003)this LEA received a permit application faxed from URS <br /> for the construction and installation of monitoring wells for gas migration at the site. t <br /> VII. On November 18a',2003,this LEA received a Work-Plan from URS for the t <br /> installation of monitoring wells for gas migration at the site. <br /> VIII. On December 11`",2003,this LEA received a Draft Addendum to the Work-Plan <br /> from URS for the installation of monitoring wells for gas migration at the site. <br /> 1X. On December I P,2003,this LEA issued a permit to the.Tandy Corporation for the <br /> construction of the four monitoring wells for gas migration at the site. (Exhibit C). <br /> X. On December 15",20033%this LEA received an Addendum to the Work-Plan from <br /> URS for the installation of the monitoring wells for gas migration at the site. <br /> I <br /> XI. On April 2nd,2004,this LEA sent a faxed copy of the permit to Jeff Brooks of URS <br /> for the construction and installation of the monitoring wells for gas migration. <br /> XII. On April 7",2004,this LEA inspected the construction and installation performed <br /> by URS of the four monitoring well for gas migration at the site. <br /> XIII. On April 81h,2004,this LEA advised Jeff Brooks of URS to add appropriate valves i <br /> to the four monitoring wells to perform gas monitoring. <br /> XIV. On April Ie,this LEA observed that the four monitoring wells had new locks and <br /> were properly secured. <br /> XV. On May 6d',2004,this LEA received an email message from Jay Famine of URS ` <br /> stating to Jeff Brooks about the provision of keys for access of the four monitoring I <br /> wells. The message stated that the site owner is willing to provide unlimited access <br /> for the LEA to inspect and conduct gas monitoring at the site,but would like their <br /> Notice and Order 04-01 Page 2 of 7 World Enterprises Site <br /> October 25,2004 <br />