My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
1728
>
2800 - Aboveground Petroleum Storage Program
>
PR0540694
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2021 8:48:08 AM
Creation date
11/18/2020 10:59:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0540694
PE
2832
FACILITY_ID
FA0009536
FACILITY_NAME
CONCRETE INC
STREET_NUMBER
1728
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25311027
CURRENT_STATUS
01
SITE_LOCATION
1728 LINNE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Log of Plan Review and Amendments -40 CFR 112.5 <br />Non-Technical Amendments <br />• Non-technical amendments are not certified by a Professional Engineer . <br />• Examples of changes include, but are not limited to, phone numbers, name changes, or any non- <br />technical text change(s). <br />Technical Amendments <br />• Technical amendments are certified by a Professional Engineer (§112.5(c)) . <br />• Examples of changes include, but are not limited to, commissioning or decommissioning containers; <br />replacement, reconstruction, or movement of containers; reconstruction, replacements, or installation of <br />piping systems; construction or demolition that might alter secondary containment structures; changes of <br />product or service; or addition/deletion of standard operation or maintenance procedures related to <br />discharge prevention measures. It is the responsibility of the facility to determine, and confirm with the <br />regulatory authority as necessary, what constitutes a technical amendment. The preamble of the rule <br />states that an amendment is required only "when there is a change that materially affects the facility's <br />potential to discharge oil" (67 FR 47091). <br />• An amendment made under this section will be prepared within six (6) months of the change and <br />implemented as soon as possible but not later than six (6) months following preparation of the <br />amendment. <br />• Technical Amendments affecting various pages within the plan can be P.E. certified on those pages, <br />certifying those amendments only, and will be documented on the log form below. <br />Management Review <br />• Management will review this SPCC Plan at least each five (5) years and document the review on the form <br />below (§112.5(b)). <br />Amend Description of Review/Amend Signature Plan Review Affected P .E. Certification <br />Date (Specify) (will/will Amendment II (YIN) <br />j not) [i~, 2./14/20'14 will !nsp by D.K. Barbe: All y <br />J .... ·· ·" <br />I } 'li ,I z "u a i •. , \r1 1 !lrv ivf A) f4 iii(/ /!r/ <br />I p I "'""' "'"·/. <br />=·~• ... · . . ~coc """"""""-""-. . .
The URL can be used to link to this page
Your browser does not support the video tag.