Laserfiche WebLink
Table 2 <br />POTENTIAL SPILL SCENARIOS <br />KRC TRACY PLANT <br />Source <br />Type of Failure <br />Volume <br />Rate <br />Direction of Flow <br />Method of <br />(gallons) <br />al/hr) <br />Containment <br />Above rouind Storage Tanks ; <br />Fueling Area <br />Oil loss due to <br />10,000 <br />500 <br />Fuel would spill within the concrete paved area <br />UL 2085 AST and <br />Containment <br />damage to tank <br />and possibly flow to pond if not adsorbed while <br />paved, drainage to <br />highway diesel <br />traversing the base rock area.. <br />pond. <br />fuel AST <br />Oil loss to tank <br />500 <br />10 <br />Fuel would spill within the concrete paved area <br />UL 2085 AST and <br />leakage <br />and possibly flow to pond if not adsorbed while <br />paved, drainage to <br />traversing the base rock area. <br />pond. <br />Leakage from <br />5 <br /><1 <br />Leakage from fittings would spill to PCC <br />Paved area with <br />aboveground fittings <br />pavement <br />drainage to pond <br />Tank overfill or other <br />1-100 <br />200 <br />Fuel would spill within "Baker Box' enclosure <br />Implement contingency <br />spillage during fuel <br />or the concrete paved area and could flow to <br />plan. <br />delivery <br />pond. <br />Fueling Area <br />Oil loss due to <br />500 <br />500 <br />Fuel would spill within the concrete paved area <br />Containment off <br />damage to tank <br />and possibly flow to pond if not adsorbed while <br />highway diesel <br />traversing the base rock area. <br />fuel AST <br />Oil loss to tank <br />500 <br />10 <br />Fuel would spill within the concrete paved area <br />leakage <br />and possibly flow to pond if not adsorbed while <br />traversing the base rock area. <br />Leakage from <br />5 <br /><1 <br />Leakage from fittings will spill to PCC <br />Paved area with <br />aboveground fittings <br />pavement <br />drainage to pond <br />Tank overfill or other <br />1-100 <br />200 <br />Fuel would spill within the concrete paved area <br />Implement contingency <br />spillage during fuel <br />and possibly flow to pond if not adsorbed while <br />plan. <br />delivery <br />traversing the base rock area. <br />Utility Transformer <br />Enclosure failure <br /><200 <br />4'R -C' ' RAC`;' PLA? <br />