Laserfiche WebLink
PERSONNEL PROTECTION PLAN-FORM 9 (REVISED 02/1998) <br /> Engineering Controls <br /> Describe Engineering Controls used as part of Personnel Protection Plan: <br /> Task(s) <br /> 1-2 Level D PPE <br /> Administrative Controls <br /> Describe Administrative Controls used as part of Personnel Protection Plan: <br /> Task(s) <br /> 1-2 An initial health and safety tailgate meeting will be held at the site before work commences each day.Work <br /> will be completed in accordance with this HASP under the supervision/guidance of the SHSC. <br /> Personal Protective Equipment <br /> Action Levels for Changing Levels of Protection. Refer to HASP Form 13,Site Air Monitoring Program—Action Levels. <br /> Define Action Levels for up or down grade for each task: <br /> Task(s) <br /> 1-2 Level D. If visible dust does not dissipate—stop work and engineering controls will be instituted to minimize the <br /> hazard. <br /> DESCRIPTION OF LEVELS OF PROTECTION <br /> Level D Level D Modified <br /> Task(s): 1-2 Task(s): All <br /> ®Head Hard Hat <br /> (If overhead F] Head <br /> hazards are <br /> present) <br /> ®Eye and Face Safety glasses ❑ Eye and Face <br /> ®Hearing Ear Plugs ❑ Hearing <br /> ❑ Arms and Legs Only ❑ Arms and Legs Only <br /> ® Appropriate Work Clothing Long Pants ❑ Whole Body <br /> ® Hand-Gloves Nitrile ❑ Apron <br /> ® Foot-Safety Boots Steel Toe ❑ Hand-Gloves <br /> ❑ Fall Protection ❑ Gloves <br /> ❑ Flotation ❑ Foot-Safety Boots <br /> ❑ Other ❑ Over Boots <br /> 12 of 23 <br />