Laserfiche WebLink
ced <br /> 12 October 2020 A Compony <br /> Geo <br /> Project No. 20-6164 ''~�� <br /> Page 13 of 15 <br /> 250 gpd (existing system) + 200 gpd (proposed system)x 365 days of proposed operation <br /> = 450 x 365 days _ 7.48 gallons per cubic foot = 21,958 cubic feet of wastewater. Does <br /> not account for evapotranspiration likely to occur. <br /> NW = Total nitrogen concentration of wastewater at 45 mg/L-N based on the average <br /> discharge. Accounting for the loss of mg/L-N in the septic tank at 15% = 45-15%= 38.25 <br /> and the loss from the biomat at 10% 38.25 - 10% = 34.425 mg/L-N. <br /> d = Fraction of nitrogen concentration removed from the wastewater due to denitrification <br /> within the soil (40 percent for loamy soils). <br /> R = Estimated Deep percolation / average rainfall recharge rate per year: 3.69 inches. <br /> Nb = Background nitrate-nitrogen concentration of rainfall recharge: 1.0 mg/I. The Nb is <br /> an average value determined for San Joaquin County by the EHD. <br /> EXISTING AND PROPOSED HOME CALCULATIONS: <br /> Nr = I x Nw (1-d)+ R x Nb T (I+R) <br /> Assumptions: <br /> I = 164,250 gallons = 21,958 cubic feet wastewater T [(2.0 acres x 43,560 feet2) _ 12 <br /> inches] = 21,958 . 7,260 = 3.02 inches/year <br /> NW = 34.425 mg/L-N <br /> d = 40 percent denitrification <br /> R = 3.69 inches/year <br /> Nb = 1.0 milligram per liter <br /> Nr = [3.02 inches/year x 34.425 mg/L-N (1-0.40)] + (3.69 inches/year x 1.0 milligram per <br /> liter) _ (3.02 inches/year + 3.69 inches/year) <br /> Nr = 66.07 = 6.71 = 9.85 <br /> Nr = 9.85 ppm nitrogen (NO3_N) <br /> 9.7. IMPACT OF NITROGEN LOADING FROM SITE PROJECT TO <br /> DOWNGRADIENT WATER SOURCES <br /> The recharging of groundwater is the most likely potential feature that could impact future <br /> nitrogen loading. Since the subject property is flat, AGI does not anticipate percolating <br /> effluent will affect any nearby water sources. Based on the volume of wastewater to be <br /> generated and the depth to groundwater (140-150 feet bsg), the potential vertical <br /> migration would not likely degrade the local groundwater. A total of 9.85 ppm of additional <br /> nitrogen is estimated to be added to the site over the long term through wastewater <br /> recharge from the proposed septic system. The nitrogen loading value is below the <br /> desired value of 10 ppm. <br />