Laserfiche WebLink
(d) Permanent Address. The property owner shall obtain an approved permanent address <br /> for an ADU and JADU. <br /> (e) Availability of Water and Sewer Service. Prior to issuance of a building permit for an <br /> ADU, the property owner must provide information that adequate water and wastewater <br /> disposal service is available, either from a service provider or from a well and on-site <br /> septic system, to the Director. The County has identified certain areas, shown in Figure 9- <br /> 832.2 (e) where there are capacity constraints in the local sewer collection system. In <br /> these areas, a determination of adequate water and sewer collection for the proposed <br /> ADU by the Department of Public Works is required. An ADU to be served by an on- <br /> site well system is subject to the provisions of Section 9-1120 and Chapter 9-115, and an <br /> ADU to be served by private on-site wastewater disposal system is subject to the <br /> provisions of Section 9-1105.2 and Chapter 9-1110. <br />