Laserfiche WebLink
GENERAL PLUMBING NOTES ABBREVIATIONS I C2 <br /> C2 <br /> GENERAL: ACM AREA CONSTRUCTION MANAGER <br /> 1 . ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH ALL LOCAL CODES 5. THE GREASE INTERCEPTOR SHALL BE VENTED IN ACCORDANCE WITH THE <br /> AND ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION. LOCAL CODE OR THE MANUFACTURER'S REQUIREMENTS. <br /> 2. ALL PLUMBING WORK SHALL BE PERFORMED BY A LICENSED PLUMBER. 6. ACCESS TO THE GREASE INTERCEPTOR SHALL BE PROVIDED WITH TWO (2) AVB ATMOSPHERIC VACUUM BREAKER <br /> 24-IN. MANHOLES. ALL SURFACE WATER MUST DRAIN AWAY FROM MANHOLES. <br /> 3. ALL DIMENSIONS, CLEARANCES AND TOLERANCES SHALL BE VERIFIED PRIOR <br /> TO INSTALLATION. ALL ROUGH-IN LOCATIONS SHALL BE COORDINATED WITH 7. PIPING INLET AND OUTLET SIDES SHALL BE CLEARLY LABELED ON THE TOP BSI BEVERAGE SYSTEM INSTALLER <br /> THE MANUFACTURER'S SUBMITTAL INFORMATION. OF THE GREASE INTERCEPTOR TO INSURE PROPER INSTALLATION. <br /> 4. ALL DIMENSIONAL INFORMATION IS AS FOLLOWS (UNLESS NOTED OTHERWISE): DOMESTIC SUPPLY SYSTEMS: CO CLEAN-OUT <br /> A. UNDERGROUND PIPE IS TO FOUNDATION 1 . THE INCOMING WATER SERVICE PIPE SHALL BE LOCATED A MINIMUM OF 5 FT. z <br /> 0 <br /> B. OVERHEAD PIPE IS TO FINISHED WALL FROM THE EXITING SANITARY PIPE. WHERE A 5 FT. SEPARATION IS NOT <br /> C. ELEVATIONS ARE TO FINISHED FLOOR POSSIBLE, THE BOTTOM OF THE WATER SERVICE PIPE SHALL BE A MINIMUM DC DOWNSPOUT COVER <br /> OF 12 IN. ABOVE THE TOP OF THE HIGHEST POINT OF THE SANITARY PIPE. w <br /> v <br /> 5. ALL MATERIALS, FIXTURES AND EQUIPMENT USED SHALL BE IN ACCORDANCE <br /> WITH McDONALD'S SPECIFICATIONS. SPECIFICATIONS ARE CONTAINED WITHIN 2. ALL UNDERGROUND SITE PLUMBING SHALL CONFORM TO NSF 61 , SHALL BE DFU DRAINAGE FIXTURE UNIT(S) <br /> THESE DRAWINGS AND THE McDONALD'S PROJECT MANUAL. ANY CONTRACTOR TYPE K COPPER TUBING OR COPPER PIPE, POLYETHYLENE (PE) OR CPVC. <br /> IN NEED OF A COPY OF THE McDONALD'S PROJECT MANUAL SHALL CONTACT IF CPVC IS USED, FOAM INSULATION SHALL BE INSTALLED AT ALL CHANGES <br /> THE McDONALD'S AREA CONSTRUCTION MANAGER. ANY VARIANCE FROM THE OF DIRECTION TO ACCOUNT FOR EXPANSION AND CONTRACTION. EC ELECTRICAL CONTRACTOR <br /> McDONALD'S SPECIFICATIONS SHALL BE REVIEWED AND APPROVED BY THE 3. INCOMING WATER SERVICE PRESSURE SHOULD BE BETWEEN 45 AND 55 PSI <br /> ENGINEER-OF-RECORD. STATIC. WHERE WATER PRESSURE SERVICE EXCEEDS 80 PSI STATIC, AN <br /> APPROVED WATER-PRESSURE REDUCING VALVE WITH STRAINER CONFORMING FAC FIRE ALARM CONTRACTOR <br /> 6. SEE COORDINATION SCHEDULE FOR ADDITIONAL SCOPE OF WORK. TO ASSE 1003 SHALL BE INSTALLED. WHERE INCOMING WATER PRESSURE IS <br /> 7. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH ITS LISTING BELOW 45 PSI STATIC, A PRESSURE BOOSTER SYSTEM SHALL BE INSTALLED. <br /> ECO FLOOR CLEAN-OUT <br /> AND/OR THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 4. IF THE RESTAURANT HAS A COMBINED WATER AND FIRE SPRINKLER SERVICE, <br /> 8. WHERE POOR SOIL CONDITIONS EXIST OR WHERE SUBSTANTIAL SETTLEMENT THE INCOMING WATER SERVICE SHALL BE SIZED BASED ON THE EIRE <br /> OF EITHER THE PIPING, THE BUILDING OR ADJACENT WALKS, PLANTERS, ETC., SPRINKLER CONTRACTOR'S HYDRAULIC CALCULATIONS. FD FLOOR DRAIN <br /> w <br /> MAY OCCUR, THE CONTRACTOR SHALL PROVIDE ADEQUATE UNDERSLAB <br /> STAINLESS STEEL PIPE HANGERS OR APPROVED OTHER SUPPORT. 5. PROVIDE A MINIMUM Y2" ANNULAR CLEARANCE AROUND ALL PIPE SLAB o <br /> PENETRATIONS. FPC FIRE PROTECTION CONTRACTOR <br /> 9. ALL PIPE SLEEVES SHALL BE PROPERLY SEALED AND INSULATED TO PREVENT <br /> HEAT LOSS AND SEEPAGE. 6. A REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER (RPZ) SHALL BE w <br /> INSTALLED AT THE INCOMING SERVICE WHERE REQUIRED BY CODE. FS FLOOR SINK <br /> 10. ALL PIPE INSULATION SHALL BE PROTECTED FROM DAMAGE FROM PIPE <br /> HANGERS. PROTECTION SHALL BE LIGHT GAUGE GALVANIZED STEEL OR 7. AN EXPANSION TANK SHALL BE INSTALLED ON THE COLD WATER LINE INLET <br /> EQUAL. TO THE WATER HEATER. SEE EXPANSION TANK SCHEDULE. GC GENERAL CONTRACTOR QRDFESS <br /> /p <br /> 11 . ALL PENETRATIONS OF FIRE-RATED WALLS SHALL BE FIRESTOPPED WITH AN <br /> 8. ALL WATER SUPPLY PIPE WITHIN 5 FT. OF THE BUILDING AND INSIDE THE <br /> APPROVED AND LISTED FIRESTOPPING SYSTEM. BUILDING SHALL COMPLY WITH NSF 61 AND SHALL BE TYPE L COPPER GI GREASE INTERCEPTOR 3431 <br /> TUBING, COPPER PIPE OR CPVC PIPE. <br /> SANITARY AND VENT SYSTEMS: <br /> 1 . THE BUILDING SANITARY PIPE SHALL BE LOCATED A MINIMUM OF 5 FT. FROM 9. CPVC PIPE SHALL BE FLOWGUARD GOLD OR FLOWGUARD BENDABLE AS GPF GALLONS PER FLUSH � HAWC �t <br /> THE INCOMING WATER SERVICE. WHERE A 5 FT. SEPARATION IS NOT MANUFACTURED BY LUBRIZOL. rFOFCAL`fotL�' tiA <br /> POSSIBLE, THE BOTTOM OF THE WATER SERVICE PIPE SHALL BE A MINIMUM <br /> OF 12 IN. ABOVE THE TOP OF THE HIGHEST POINT OF THE SANITARY PIPE. 10. CPVC PIPE SHALL BE CONNECTED WITH FLOWGUARD GOLD YELLOW LOW-VOC Oak' <br /> SOLVENT CEMENT AS MANUFACTURED BY IPS WELD-ON OR OATEY. GPM GALLONS PER MINUTE <br /> 2. ALL SANITARY AND VENT PIPE SHALL BE PVC TYPE DWV, ABS OR CAST-IRON d v <br /> WHERE REQUIRED BY CODE. 1 1 . ALL CPVC PIPE SHALL BE INSULATED TO PREVENT EXPOSURE TO GREASE. �, N <br /> GW GREASE WASTEQ <br /> 3. ALL HORIZONTAL SANITARY PIPE SHALL BE INSTALLED WITH A MINIMUM PITCH 12. ALL SUSPENDED PIPE SHALL BE SUPPORTED AS FOLLOWS: � , i <br /> AS FOLLOWS: MATERIAL MAX. HORIZ. SPACING MAX. VERT. SPACING Immom 0 <br /> PIPE SIZE MIN. SLOPE COPPER PIPE 12 FT. 10 FT. HS HAND SINK cc <br /> 2Y2" OR LESS Y4" PER FT. COPPER TUBING <1Y4" 6 FT. 10 FT. VALVE SCHEDULE <br /> 3" TO 6" Y8" PER FT. COPPER TUBING >1Y2" 10 FT. 10 FT. I.P.S. IRON PIPE SIZE (ALSO NPS) y <br /> 8" OR LARGER %6" PER FT. CPVC <1 " 3 FT. 10 FT. <br /> CPVC ->l)/4" 4 FT. 10 FT. TEMP. <br /> 4. CLEANOUTS SHALL BE INSTALLED IN ALL HORIZONTAL DRAINAGE PIPE AND MANUFACTURER MODEL SETTING LISTING SERVES KEI KITCHEN EQUIPMENT INSTALLER W <br /> SHALL BE LOCATED NOT MORE THAN 100 FT. APART. 13. A REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER (RPZ) SHALL BE WATTS LFMMV 104°F ASSE 1017 1069 1070 LAVS & HAND SINKS MIXING r <br /> INSTALLED AT THE INLET TO THE WATER FILTRATION SYSTEM. ALL PIPING m <br /> 5. CLEANOUTS SHALL BE INSTALLED AT ALL CHANGES OF DIRECTION GREATER DOWNSTREAM OF THE RPZ SHALL BE COPPER OR CROSS-LINKED <br /> KFS KITCHEN EQUIPMENT SUPPLIER a a <br /> THAN 45 DEGREES. WHERE MORE THAN ONE CHANGE OF DIRECTION OCCURS POLYETHYLENE (PEX). Q Cl " o <br /> EL t2 E A SINGLE PIPE RUN, ONLY ONE (1 ) CLEANOUT SHALL BE REQUIRED FOR COORDINATION SCHEDULE0 � PU <br /> EVERY 40 FEET OF DEVELOPED LENGTH. 14. ALL DEVICES, APPLIANCES, AND APPARATUS INTENDED TO SERVE SOME � � ��&� <br /> SPECIAL FUNCTION SHALL BE PROVIDED WITH PROTECTION AGAINST BACKFLOW LAV LAVATORY <br /> 6. CLEANOUTS SHALL BE INSTALLED ON PIPES PRIOR TO ANY SLAB AND CONTAMINATION OF THE WATER SUPPLY SYSTEM. ALL BACKFLOW FINAL NOTES: o T)PENETRATION. PREVENTION DEVICES SHALL BE ASSE LISTED AND APPROVED FOR THE DEVIL- 1 . THIS SCHEDULE IS INTENDED AS A GUIDE FOR THE WORK TO BE o <br /> OR APPLIANCE THEY SERVE. GENERAL REQUIREMENTS FURNISH INSTALL CONNECTION NOTES PERFORMED. ALL WORK SHALL BE COORDINATED BETWEEN THE MC MECHANICAL CONTRACTOR o o �p 0 o o "- <br /> 7. WHERE PIPING IS LOCATED WITHIN WALL CAVITIES, ACCESS TO THE CLEANOUTS ° L ° <br /> SHALL BE PROVIDED. 15. ALL WATER SUPPLY LINES SHALL BE PROVIDED WITH A QUARTER-TURN MECHANICAL PERMIT MC 1 -3 McDONALD'S AREA CONSTRUCTION MANAGER AND ALL GC AND o Q E 0 6 <br /> HOT WORK (WELDING) PERMIT (IF APPLICABLE) KES 1 -3 0/0 SUBCONTRACTORS. v J ° ` ° 0 0 <br /> SHUT-OFF VALVE BEFORE FINAL CONNECTION TO EQUIPMENT. MHT MALE HOSE THREADS a J o a . o CD- <br /> 8. <br /> 8. CLEANOUTS ON 6IN. AND SMALLER PIPES SHALL BE PROVIDED WITH A PLUMBING PERMIT PC 1 -3 ° ° ° ° <br /> CLEARANCE OF NOT LESS THAN 18 IN. CLEANOUTS ON 8-IN. AND LARGER 16. QUARTER-TURN SHUT-OFF VALVES SHALL BE INSTALLED UPSTREAM OF ANY ELECTRICAL PERMIT EC 1 -3 2. ONE (1) COPY OF THE DECOR PACKAGE DRAWINGS SHALL BE o 0 6 Q, N. Q� <br /> PIPE SHALL BE PROVIDED WITH A CLEARANCE OF NOT LESS THAN 36 IN. INLINE BACKFLOW PREVENTION DEVICE. SUPPLIED TO THE GENERAL CONTRACTOR AND EACH OF THE o p ,N <br /> FIRE SPRINKLER PERMIT (IF APPLICABLE) FPC 1 -3 SUBCONTRACTORS. IT SHALL BE THE RESPONSIBILITY OF THE MS MOP SINK - ° a) C T T <br /> FIRE ALARM PERMIT (IF APPLICABLE) FAC 1 -3 GENERAL CONTRACTOR AND THE SUBCONTRACTORS TO INSURE L 'o- <br /> 9. ALL VALVES AND BACKFLOW PREVENTION DEVICES SHALL BE INSTALLED WITH <br /> 9. ALL SUSPENDED SANITARY AND VENT PIPE SHALL BE SUPPORTED AS THAT THEY HAVE RECEIVED THE DECOR PACKAGE DRAWINGS. o o o a ° Q <br /> FOLLOWS: FITTINGS THAT FACILITATE REMOVAL N CASE OF FAILURE. CONTRACTOR COORDINATION REQUIREMENTS NPS NATIONAL PIPE THREAD STANDARD v = ° 3 a <br /> U p C -p <br /> MAX. HORIZ. MAX. VERT. PLUMBING SYSTEMS 3. FOR ANY WORK NOT CLARIFIED IN THIS SCHEDULE OR IN THE .0 o ° <br /> MATERIAL SPACING SPACING 18. ALL OVERHEAD WATER LINES SHALL BE INSULATED WITH 1 " THICK EXTERNAL WATER HEATERS PC PC PC 1 -4 NOTES AND SPECIFICATIONS, PLEASE CONSULT THE McDONALD'S V� <br /> JACKETED INSULATION AND A MINIMUM INSTALLED R-VALUE OF 3.7. a o -2� o <br /> ABS 4 FT. 10 FT. HOT AND COLD WATER PIPE PC PC PC 1 -4 AREA CONSTRUCTION MANAGER FOR SCOPE OF WORK. NPT NATIONAL PIPE THREAD TAPERED ° c ° o_ ° <br /> PVC (TYPE DWV) 4 FT. 10 FT. 19. PRIOR TO BUILDING TURNOVER, THE DOMESTIC WATER SUPPLY SYSTEM SHALL VENTS AND INTAKES PC PC PC 1 -4 o p ° <br /> CAST-IRON (<10 FT. PIPE SECTIONS) 5 FT. 15 T. BE PURGED OF DELETERIOUS MATERIAL AND DISINFECTED. DISINFECTION THERMOSTATIC MIXING VALVE PC PC PC 1 -4 4. SEE PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. o o a Q) <br /> SHALL BE DONE IN ACCORDANCE WITH THE LOCAL HEALTH CODE, PLUMBING POWER AND CONTROL WIRING EC EC EC 1 5 0/0 OWNER/OPERATOR ° Q (D -0 T <br /> CAST-IRON (10 FT. PIPE SECTIONS) 10 FT. 15 FT. 5. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. � < o N '' (-,2 <br /> CODE OR IN ACCORDANCE WITH AWWA C651 OR AWWA C652. ° t ° <br /> 10. ALL PLUMBING FIXTURES SHALL BE VENTED AND THE MAXIMUM DISTANCE ° ° ° <br /> FROM THE FIXTURE TRAP TO THE VENT SHALL BE AS FOLLOWS: 1 OH OVERHEAD 0 p o 0 Q , <br /> TRAP SIZE SLOPE DISTANCE PLUMBING FIXTURE SCHEDULE v ° � ° 0 <br /> 1Y4" %4" PER FT. 2' 6" ° _E o go <br /> TAG DESCRIPTION MANUFACTURER MODEL WATER USE ACCESSORIES/COMMENTS P PUMP <br /> 1/2„ Y4" PER FT. 3'-6" 0 ` ° °'�� � 6 <br /> TOTO TEL101 -D1 0E#C 1 .0 GPM FAUCET OPERATION: SENSOR o ° 3 0 o <br /> 0.17 GAL 10 <br /> F-1 FAUCET FOR LAV-1 ( GAL/ <br /> 10/4 PER FT. 5'-0" o >' °--t-'-° V)C <br /> 3" Y8" PER FT. 6'-0" o c.L ° <br /> 4" & LARGER %g" PER FT. 1 0' 0" SEC CYCLE) PC PLUMBING CONTRACTOR w .F o ° <br /> 0 <br /> FCO 6x6 FLOOR CLEAN OUT ZURN Z1400-SZ SEE DRAWINGS FOR PIPE SIZES ~ a�� � ' �' <br /> 11 . ALL PLUMBING VENTS THROUGH THE ROOF SHALL TERMINATE A MINIMUM OF JAY R. SMITH 4040 SEE NOTE 8 <br /> 18 INCHES ABOVE THE ROOF AND SHALL BE LOCATED A MINIMUM OF 8 FT. RC REFRIGERATION CONTRACTOR w00 <br /> FROM ANY PARAPET WALL. WHERE A VENT TERMINATES WITHIN 8 FT. OFA FD-2 6x6 FLOOR DRAIN ZURN 2415-SZ PIPE SIZE: 3" FUNNEL: NONE Q � m LL o <br /> JAY R. SMITH 2005 STRAINER SIZE: 6" NICKEL BRONZE SEE NOTE 8 w <br /> 0 <br /> PARAPET WALL, THE VENT SHALL TERMINATE A MINIMUM OF 6 INCHES ABOVE m w �_ n o �O <br /> THE PARAPET. FAUCET: F-1 SEE NOTE 10 RPZ � w w N a <br /> KOHLER K-2882-0 REDUCED PRESSURE PRINCIPLE z N <br /> BACKFLOW PREVENTER Q N w w <br /> MILEGEND LAV-1 LAVATORY TRUEBRO LAVGUARD2 MODEL #102-E-Z SEE DETAIL 2 ON P1 .6 0 - Q w Q _4o <br /> 12. ALL PLUMBING VENTS SHALL TERMINATE A MINIMUM OF 1 0 FT. HORIZONTALLY __DCORIAN COUNTER BY G.C. m o <br /> FROM ANY OUTDOOR AIR INTAKE. WHERE A PLUMBING VENT IS LOCATED TOTO CT705ELN#01 FLUSH VALVE: TOTO TET1 LA32#CP FLUSH VALVE OPERATION: SENSOR SS SANITARY SEWER <br /> WITHIN 10 FT. OF AN INTAKE, THE VENT SHALL TERMINATE A MINIMUM OF 2 WC-2 ADA WATER CLOSET ZURN Z5665 1 .28 GPF ZURN ZTR6200EV-LL SEAT: BEMIS MODEL 2155CT d <br /> FT. ABOVE THE INTAKE. COLD WATER PIPING <br /> 1 " I.P.S., 1Y2" TOP SPUD <br /> # FLUSH VALVE: TOTO TEU1 UA12#CP FLUSH VALVE OPERATION: SENSOR ST STORM SEWER <br /> 13. ALL SIDE WALL VENT TERMINATIONS SHALL BE PROTECTED TO PREVENT BIRDS TOTO UT445U 01 � <br /> OR RODENTS FROM ENTERING OR BLOCKING THE VENT OPENING. - - - - - - - TEMPERED WATER PIPING (1 10°F) UR-1 ADA WALL-HUNG URINAL ZURN Z5755 0.125 GPF ZURN ZTR6203-ULF-LL SEE NOTE 2 Q <br /> 3/4" I.P.S., 1 " TOP SPUD SVB ANTI-SIPHON, SPILL RESISTANT <br /> 14. ALL FLOOR DRAINS THAT DO NOT SERVE EQUIPMENT SHALL BE PROTECTED VACUUM BREAKER <br /> AGAINST DRYING OUT EITHER THROUGH THE INSTALLATION OF A TRAP PRIMER, TOTO CT705EN#01 FLUSH VALVE: TOTO TET1 LA32#CP FLUSH VALVE OPERATION: SENSOR <br /> HOT WATER PIPING (140°F) Z5655 1 .28 GPF ZURN ZTR6200EV-LL SEAT: BEMIS MODEL 2155CT WC-1 WATER CLOSET ZURN <br /> DEEP SEAL TRAP OR PROSET TRAP GUARD. _ <br /> 1 " I.P.S., 0/2" TOP SPUD TAB TEST AND BALANACE CONTRACTOR <br /> 15. ALL APPLIANCES SHALL DRAIN TO AN APPROVED SANITARY WASTE RECEPTOR UNDERGROUND WASTE PIPING w <br /> (FLOOR SINK OR FLOOR DRAIN WITH FUNNEL). INDIRECT DRAINAGE FROM AN <br /> ~ <br /> APPLIANCE SHALL MAINTAIN AN AIR GAP BETWEEN THE PIPE OUTLET AND THE NOTES: UG UNDERGROUND z Q o <br /> TOP OF THE RECEPTOR. THE MINIMUM DISTANCE BETWEEN THE PIPE OUTLET1 . SEE McDONALD'S PROJECT MANUAL FOR ADDITIONAL MANUFACTURERS TO ORDER PLUMBING FIXTURES, U 0 <br /> _ _ _ _ _ _ _ <br /> VENT PIPING z <br /> AND THE TOP OF THE RECEPTOR SHALL BE TWICE THE DIAMETER OF THE 2. PLUMBING CONTRACTOR SHALL COORDINATE WITH G.C. TO PROVIDE BLOCKING FOR PROPER URINAL SUPPORT CONTACT HD SUPPLY: Z w <br /> m <br /> APPLIANCE DRAIN PIPE. 3. PLUMBING CONTRACTOR SHALL COORDINATE WITH G.C. TO PROVIDE INTERIOR BLOCKING ON W/W BUILDING FOR WALL CLAMP PHONE: (866) 310-3576 UR URINAL � _D Q <br /> 4. YARD HYDRANT IS FOR TRASH CORRAL - SEE SITE PLAN FOR LOCATION E-MAIL: MCDCOORD@HDSUPPLY.COM Q <br /> GREASE INTERCEPTORS: EXISTING UNDERGROUND WASTE PIPING � <br /> 5. PLUMBING CONTRACTOR SHALL ROUTE /s , DRAIN PIPE FROM HOSE BIBB TO NEAREST FLOOR DRAIN OR FLOOR SINK o w 01 <br /> 1 . SEE SITE PLAN FOR THE SIZE AND LOCATION OF THE GREASE INTERCEPTOR. 6. PLUMBING CONTRACTOR SHALL COORDINATE WITH G.C. TO PROVIDE BLOCKING FOR PROPER SINK SUPPORT V VENT m � a <br /> 7. SEE KITCHEN DRAWINGS FOR ADDITIONAL INFORMATION - PLUMBING CONTRACTOR SHALL COORDINATE INSTALLATION WITH K.E.S. z � L <br /> 2. THE GREASE INTERCEPTOR SHALL BE INSTALLED IN A LOCATION THAT IS THERMOSTATIC MIXING VALVE 8. PLUMBING CONTRACTOR SHALL SPECIFY CONNECTION MATERIAL/TYPE WHEN ORDERING O 0 - o c <br /> v ZLd <br /> ACCESSIBLE FOR PUMPING. 9. PLUMBING CONTRACTOR SHALL SPECIFY BURY DEPTH WHEN ORDERING WC WATER CLOSET Lz g u <br /> Ld <br /> 10. PLUMBING CONTRACTOR SHALL PROVIDE GRID DRAIN, P-TRAP AND VALVE STOPS FOR ALL SINKS & LAVS o0 w <br /> 3. THE GREASE INTERCEPTOR SHALL BE CONSTRUCTED OF FIBERGLASS OR ® CLEAN-OUT (FLOOR OR YARD) Cn o 0 <br /> PRECAST CONCRETE. GREASE INTERCEPTOR CONSTRUCTION SHALL CONFORM w c) 0 x <br /> TO ALL LOCAL CODES. WCO WALL CLEAN-OUT ON W w o <br /> J <br /> cn <br /> 4. PRECAST CONCRETE INTERCEPTORS SHALL BE CAPABLE OF 3,000 PSI ® FLOOR DRAIN <br /> COMPRESSIVE STRENGTH AT 28 DAYS, SHALL BE REINFORCED WITH BAR OR WSFU WATER SUPPLY FIXTURE UNIT(S) o <br /> WIRE MESH AND SHALL BE COATED WITH A MINIMUM OF TWO (2) LAYERS OF z <br /> FLOOR SINK P 49 0 <br /> NOVOLAC EPDXY ON THE INTERIOR. NOVOLAC EPDXY SHALL BE w <br /> SHERWIN-WILLIAMS NOVA-PLATE UHS (OR EQUAL). YC YARD CLEAN-OUT N <br /> GENERAL NOTES <br />