Laserfiche WebLink
BORING LOG NO. SB4 Page 2 of 2 <br /> PROJECT: Mike Sandhu CLIENT: Sandhu Brothers Farms <br /> Tracy, Ca <br /> SITE: 23577 S. Mountain House Parkway <br /> Tracy, CA <br /> (Do LOCATION See Exhibit A-2 U) w <br /> wz 0- <br /> J v O <br /> U Latitude:37.4441'Longitude:-121.3221° _ Q w o <br /> IL <br /> d W J d <br /> w <br /> a <br /> C7Q m Q <br /> DEPTH O <br /> SILTY SAND(SM),brown,50%sand,40%silt,5%gravel(continued) <br /> 26.0 <br /> SANDY SILT(MLS,tan,60%silt,30%sand, 10%clay <br /> . <br /> '30.0 3 <br /> Boring Terminated at 30 Feet <br /> N <br /> O <br /> M <br /> 'a <br /> 0 <br /> W <br /> LU <br /> J <br /> LU <br /> 0 <br /> O <br /> d <br /> Lu <br /> U) <br /> O <br /> x <br /> z <br /> a <br /> z <br /> 0 <br /> 0 <br /> m <br /> Q <br /> Z <br /> >J <br /> O <br /> Z <br /> 0 <br /> O <br /> J <br /> Q <br /> O <br /> Lu <br /> C� <br /> H <br /> O <br /> ELW <br /> Q <br /> Z_ <br /> U' <br /> K <br /> O <br /> 2 <br /> O <br /> K <br /> LL <br /> D <br /> LU <br /> Stratification lines are appropmate.In-situ,the transition may be gradual. Hammer Type: Automatic <br /> Q <br /> IL <br /> LU <br /> Advancement Method: See Exhibit A-3 for description of field procedures. Notes: <br /> 0 <br /> 6"Hollow Stem Auger <br /> Q See Appendix B for description of laboratory <br /> > procedures and additional data(if any). <br /> F- <br /> z0 <br /> Abandonment Method: See Appendix C for explanation of symbols and <br /> U) Boring backfilled with cement-bentonite grout upon abbreviations. <br /> completion. Elevation estimated by google earth <br /> O <br /> J WATER LEVEL OBSERVATIONS <br /> z Boring Started:11-26-2019 Boring Completed:11-26-2019 <br /> m <br /> Irerracon Drill Rig:D-50 Driller:Robert <br /> 902 Industrial Way <br /> ? Lodi,CA Project No.:NA197074 Exhibit: A4 <br />