Laserfiche WebLink
BORING LOG NO. SB8 Page 1 of 1 <br /> PROJECT: Mike Sandhu CLIENT: Sandhu Brothers Farms <br /> Tracy, Ca <br /> SITE: 23577 S. Mountain House Parkway <br /> Tracy, CA <br /> (D0 LOCATION See Exhibit A-2 U) w <br /> wz a <br /> J v O <br /> U Latitude:37.4441'Longitude:-121.3224° _ Q w o <br /> IL d W Jd <br /> Lu <br /> a <br /> C7 Q m Q <br /> DEPTH O <br /> SILT WITH SAND[MLI,light brown,80%silt,20%sand <br /> 5 <br /> N <br /> O <br /> M <br /> 'a <br /> c� <br /> 1� 8.0 <br /> a SILT WITH SAND(SW-SMS,light brown,75%silt,25%sand <br /> J ' <br /> LU <br /> J <br /> 0 <br /> 0 1 <br /> c� <br /> u; <br /> U) <br /> 0 . <br /> z <br /> a <br /> z <br /> z <br /> O <br /> 0 <br /> m <br /> z <br /> Z <br /> J <br /> W ' <br /> 0 <br /> Z <br /> .18.0 <br /> WELL GRADED SAND(SW),brown,95%sand,5%gravel <br /> 20.0 <br /> 2 <br /> Boring Terminated at 20 Feet <br /> 0 <br /> W <br /> a <br /> z <br /> T <br /> W <br /> 0 <br /> 2 <br /> 0 <br /> U_ <br /> 0 <br /> W <br /> Stratification lines are appropmate.In-situ,the transition may be gradual. Hammer Type: Automatic <br /> Q <br /> IL <br /> LU <br /> Advancement Method: See Exhibit A-3 for description of field procedures. Notes: <br /> 0 <br /> 6"Hollow Stem Auger <br /> Q See Appendix B for description of laboratory <br /> > procedures and additional data(if any). <br /> F- <br /> z0 <br /> Abandonment Method: See Appendix C for explanation of symbols and <br /> U) Boring backfilled with cement-bentonite grout upon abbreviations. <br /> completion. Elevation estimated by google earth <br /> O <br /> J WATER LEVEL OBSERVATIONS <br /> z Boring Started:12-12-2019 Boring Completed:12-12-2019 <br /> O <br /> Irerracon Drill Rig:D-50 Driller:Robert <br /> m <br /> 902 Industrial Way <br /> ? Lodi,CA Project No.:NA197074 Exhibit: A-8 <br />