Laserfiche WebLink
BORING LOG NO. SB10 Page 1 of 1 <br /> PROJECT: Mike Sandhu CLIENT: Sandhu Brothers Farms <br /> Tracy, Ca <br /> SITE: 23577 S. Mountain House Parkway <br /> Tracy, CA <br /> (D0 LOCATION See Exhibit A-2 U) w <br /> wz 0- <br /> J v O <br /> U Latitude:37.4439°Longitude:-121.3225° _ Q w o <br /> IL d W a 0 d <br /> Lu <br /> C7 Q m Q <br /> DEPTH O <br /> SILTY CLAY WITH SAND(CL-ML),dark brown,40%silt,40%clay, 15%sand,5%gravel <br /> 5 <br /> 0 <br /> N <br /> O <br /> SILT(MU,dark brown,60%silt,35%clay,5%gravel <br /> UJ <br /> UJ <br /> a <br /> J <br /> J <br /> w <br /> 0 10.0 <br /> d Boring Terminated at 10 Feet <br /> c� <br /> u; <br /> U) <br /> 0 <br /> z <br /> a <br /> z <br /> 0 <br /> 0 <br /> m <br /> Q <br /> Z <br /> >J <br /> 0 <br /> Z <br /> 0 <br /> O <br /> J <br /> Q <br /> 0 <br /> Lu <br /> C� <br /> H <br /> O <br /> ELw <br /> Q <br /> Z_ <br /> U' <br /> K <br /> O <br /> 2 <br /> O <br /> K <br /> U_ <br /> D <br /> w <br /> Stratification lines are appropmate.In-situ,the transition may be gradual. Hammer Type: Automatic <br /> Q <br /> IL <br /> LU <br /> Advancement Method: See Exhibit A-3 for description of field procedures. Notes: <br /> 0 <br /> 6"Hollow Stem Auger <br /> Q See Appendix B for description of laboratory <br /> > procedures and additional data(if any). <br /> F- <br /> z0 <br /> Abandonment Method: See Appendix C for explanation of symbols and <br /> Boring backfilled with cement-bentonite grout upon abbreviations. <br /> completion. Elevation estimated by google earth <br /> O <br /> J WATER LEVEL OBSERVATIONS <br /> z Boring Started:12-13-2019 Boring Completed:12-13-2019 <br /> O <br /> Irerracon Drill Rig:D-50 Driller:Robert <br /> m <br /> 902 Industrial Way <br /> ? Lodi,CA Project No.:NA197074 Exhibit: A-10 <br />