PERFORMANCE <br /> SPECIFICATION <br /> SECTION I GENERAL CONDITIONS SECTION I GENERAL CONDITIONS - CONTINUED SECTION 11 INSPECTIONS / TESTING <br /> TEST BEFORE PLACING THE SYSTEM IN SERVICE Q <br /> PART 1 GENERAL PART 4 - CONTINUED W <br /> Table below lists current Manufacturer's Installation and Testing Guidelines that may <br /> 1.1 SCOPE: OF WORK: THE WORK INCLUDED IN THE CONTRACT FOR THIS PROJECT CONSISTS OF THE FURNISHING OF ALL 4.11 LIENS: CONTRACTOR SHALL PERMIT NO LIENS OF ANY KIND TO BE FIXED UPON OR AGAINST THE PROPERTY BY ITS <br /> be applied to the fuel system components after assembly but before backfilling. <br /> LABOR, MATERIALS, SERVICES, EQUIPMENT AND APPLIANCES REQUIRED IN CONJUNCTION WITH OR PROPERLY INCIDENTAL SUBCONTRACTORS, LABORERS, MECHANICS OR MATERIAL MEN, AND SHALL INDEMNIFY, PROTECT AND SAVE OWNER <br /> Before the beginning of fuel system installation, fuel contractor is to be responsible <br /> TO THE COMPLETE CONSTRUCTION OF A GASOLINE INSTALLATION FOR 7-ELEVEN, INC. HARMLESS FROM AND AGAINST ALL SUCH CLAIMS AND LIENS. <br /> far reading through the entire Installation Manual and Operating Guidelines as well as <br /> EQUIPMENT RESPONSIBILITY: CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING, RECEIVING, UNLOADING, any applicable supplemental materials. It is the responsibility of the fuel contractor <br /> PART 2 - AGREEMENT HANDLING AND PROVIDING PROTECTED INSIDE STORAGE: FOR ALL OWNER SUPPLIED EQUIPMENT AND MATERIAL. and fuel operator to understand and fallow all requirements contained in the � <br /> 4.12 <br /> CONTRACTOR SHALL INSPECT EQUIPMENT UPON RECEIPT AND IMMEDIATELY REPORT ANY DAMAGE DUE TO SHIPPING TO installation and testing manuals. Work must io performed according Work <br /> standard <br /> 21 CONTRACTOR SHALL NOT START WORK WITHOUT CONTRACT AND APPROVED SEALED PLANS. industry practices applicable to tank installations and operations. Work must also <br /> "' THE OWNER'S REPRESENTATIVE. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO FAILURE TO COMPLY comply will all applicable codes, regulations and standards of appropriate <br /> ATI ON V WITH THESE: REQUIREMENTS. DISPENSERS SHALL BE PROTECTED WITH SHIPPING BOXES UNTIL STORE IS TURNED OVER <br /> PART 3 - INTENT O F D RAllll I N G AND SPECIFIC FOR OPENING. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ADEQUATE AND LOCKED STORAGE OF OWNER'S COMPONENT MANUFACTURER governmental agencies. <br /> MISCELLANEOUS EQUIPMENT, TO INCLUDE GASOLINE CONSOLE, PRIOR TO OPENING OF THE STORE. <br /> INSTALLATION htt�Jjuuww.zclocarr/assets/dacurnents/library/installatiar'"20 [0) <br /> 3.1 THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO PRESCRIBE A COMPLETE:WORK OR IMPROVEMENT WHICH THE 4.13 FUEL CONTRACTOR SHALL BE RESPONSIBLE FOR FILING OF RECEIVING FORMS AND MISCELLANEOUS CONFIRMATION OF MANUAL manual caperat�ng�°2C�gu del nes°1�20(imc�g)y�2afQr° <br /> Proto 08-•21-17 <br /> CONTRACTOR SHALL PERFORM IN FULL COMPLIANCE WITH THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL EQUIPMENT RECEIVING INFORMATION AS REQUIRED BY LOCAL CONSTRUCTION OFFICE. DOUBLE-WALLED STORAGE XERXES "A ZCL 2txerxss°%20td12020tanks.pdf <br /> PERFORM ALL WORK NECESSARY TO COMPLETE THE WORK IN A SATISFACTORY AND ACCEPTABLE MANNER. TANK COMPANY" <br /> TESTING hoop:,/wuww.zcl.com/assets}dacraents/IibraryJirastallatianl°20 <br /> 3.2 THE CONTRACTOR SHALL, UPON DISCOVERY, REPORT ANY DISCREPANCIES IN THE DRAWINGS AND SPECIFICATIONS TO 4.14 FUEL CONTRACTOR SHALL PROVIDE ALL PIPING, WIRING, MATERIAL AND LABOR AS REQUIRED TO INSTALL OWNER anualf 20ancJZC�o�aeratingl°2t?guide%rtes%20( rt1€ g)dntr°f <br /> SUPPLIED EQUIPMENT. INCLUDE MONEY IN BID PROPOSAL FOR INSTALLATION OF OWNER SUPPLIED EQUIPMENT UNLESS PROCEDURE <br /> 2(3xerxes°Ia20ta n ksdf <br /> THE OWNER'S CONSTRUCTION MANAGER. NOTED OTHERWISE. <br /> AND SPECIFICATIONS ARE INTENDED TO BE COMPLIMENTARY. ANYTHING ENTIONED IN THE hoop://www.nay.com/Segments/Completion_and_production_ � <br /> M <br /> 3.3 THE DRAWINGS INSTALLATION <br /> SPECIFICATIONS AND NOT SHOWN ON THE DRAWINGS, DR SHOWN ON THE DRAWINGS AND NOT MENTIONED IN THE MANUAL SolutionsjFiber_Glass_Systems/Fuel Handling/Red Thread IIA. � <br /> - PROTECTION <br /> SPECIFICATIONS, SHALL BE OF LIKE EFFECT AS IF SHOWN OR MENTIONED IN BOTH. GENERALLY, THE SPECIFICATIONS PART 5 DOUBLE-WALLED PIPING NOV aspx 1`' <br /> DESCRIBE WORK WHICH CANNOT BE READILY IDENTIFIED ON THE DRAWINGS AND INDICATED TYPES, QUALITIES AND OR SHALL BE HELD RESPONSIBLE FOR ANY LOSS OR DAMAGE CAUSED BY HIM OR HIS WORKMEN TO THE TESTING Q z <br /> METHODS OF INSTALLATION OF THE VARIOUS MATERIALS AND EQUIPMENT REQUIRED FOR THE WORK. IT IS NOT INTENDED 5.1 CONTRACT PROCEDURE http://www.nov.cam/docHandler.aspx?paid-12bNZwjC3oL35C LU C7 <br /> ME PROPERTY OR EQUIPMENT OF THE OWNER, OR TO THE WORK OR MATERIALS OF OTHER CONTRACTORS. CONTRACTOR <br /> TO MENTION EVERY ITEM OF WORK IN THE SPECIFICATIONS WHICH CAN BE ADEQUATELY SHOWN ON THE DRAWINGS NOR SHALL MAKE GOOD ANY LOSS, DAMAGE OR INJURY WITHOUT COST TO OWNER FOR SUCH LOSS OR DAMAGE. ti <br /> EMS OF WORK DESCRIBED OR REQUIRED BY THE SPECIFICATIONS EVEN IF THEY ARE INSTALLATION http:/Jwww.gilbarco.eom/gold/gold_pubiic_access.cfm?section F"" C4 LD p <br /> TO SHOW ON THE DRAWINGS ALL IT OT MANUAL id-361 z Z �� rn Q <br /> OF SUCH NATURE THAT THEY COULD HAVE BEEN SHOWN THERI=ON. ALL MATERIALS OR LABOR FOR WORK WHICH IS 5.2 CONTRACTOR SHALL PROVIDE AND MAINTAIN SUITABLE TEMPORARY SIDEWALKS, FENCES, LIGHTS, SIGNS OR OTHER LEAK DETECTION SENSOR VEEDER RD <br /> SHOWN ON THE DRAWINGS OR IS REASONABLY INFERABLE AS BEING NECESSARY TO PRODUCE A FINISHED JOB SHALL BE TESTING http:J/www.gilbarca.com/gold/gald_public_access.cfm?section ^ � � p ¢ � <br /> PROVIDED BY THE CONTRACTOR WHETHER OR NOT THE WORK IS EXPRESSLY COVERED IN THE SPECIFICATIONS. STRUCTURES AND DEVICES AS REQUIRED BY LAW, DO NOT OBSTRUCT OR INTERFERE WITH TRAFFIC IN PUBLIC STREETS, PROCEDURE id-361 z •-- �U <br /> ALLEYWAYS OR PRIVATE. RIGHT-OF-WAYS. IF WORK IS SUSPENDED, KEEP ALL ROADWAYS AND SIDEWALKS IN PROPER <br /> CONDITION AND PUT AND LEAVE THEM IN PROPER CONDITION AT TERMINATION OF WORK. INSTALLATION http://www.gilbarco.com/goid/gold_public_access.cfm?section u,[ © z Z " U <br /> 3.4 THE CONTRACTOR, SUBCONTRACTORS AND ALL TRADES SHALL EXAMINE THE SITE AND ASCERTAIN EXISTING CONDITIONS MANUAL _id=364 <br /> � � u� Q o � <br /> PRIOR TO THE START OF THEIR PORTIONS OF THE WORK. BEFORE ORDERING MATERIALS OR DOING ANY WORK, THE 5.3 CONTRACTOR SHALL SEND PROPER NOTICES, MAKE NECESSARY ARRANGEMENTS AND PERFORM ALL WORK REQUIRED AUTOMATIC TANK G UAGES VEEDER ROOT } W © ` <br /> CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR THE CORRECTNESS OF ALL MEASUREMENTS AT THE SITE. ANY FOR THE CARE, PROTECTION AND MAINTENANCE OF PUBLIC UTILITIES ON AND AROUND THE BUILDING SITE, ASSUMING ALL TESTING <br /> DIFFERENCES WHICH MAY BE FOUND BETWEEN ACTUAL DIMENSIONS AND DIMENSIONS INDICATED ON THE DRAWINGS OR RESPONSIBILITY AND PAYING ALL COSTS FOR WHICH THE OWNER MAY BE LIABLE. CONTRACTOR HEREBY DECLARES HE -systef stat veeder cam/u is-350uctstors a ic-ta)l(- tarok gauge n U <br /> SUBMITTED TO THE OWNER'S CONSTRUCTION MANAGER FOR CONSIDERATION BEFORE PROCEDURE W � J � O Z_ <br /> SHOP DRAWINGS SHALL BE HAS VERIFIED THE LOCATIONS OF THE EXISTING UNDERGROUND UTILITIES ON SITE PRIOR TO THE START OF WORK. -systems/atg-tis-c€�ns�sresJtls-350x-autc�rr�atic-tanr<-gauge LU W J <br /> ( <br /> PROCEEDING WITH THE ACTUAL DIMENSIONS AND MEASUREMENTS INDICATED ON THE DRAWINGS UNLESS A SUBSTANTIAL JUNCTION WITH THE <br /> ERROR HAS BEEN MADE. IF SUCH AN ERROR SHOULD OCCUR, IT SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S CONTRACTOR HEREBY AGREES TO MAKE ARRANGEMENTS FOR AND TO PAY ALL CHARGES IN CON- INSTALLATION http://www.opwglobal.com/docs/libraries/manuals/retail-fueii W LL <br /> CONSTRUCTION MANAGER AND RESOLVED BEFORE PROCEEDING WITH WORK. RELOCATION'S OF EXISTING UTILITIES AS REQUIRED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL UTILITY MANUAL ng/below-ground/opw-fcs-manuals/71so-testable-(h15524pa)- U�t LL <br /> EASEMENTS, HOOKUP CHARGES, TAP FEES &SYSTEM DEVELOPMENT FEES OR BONDS AS NECESSARY FOR COMPLETION 1-30-14.pdf?sfvrsn=4 <br /> TION OF SPECIFICATIONS INTO DIVISIONS, SECTIONS AND PARAGRAPHS, AND THE ARRANGEMENT OF THE OF THIS PROJECT. OVERFILL PREVENTION DEVICES OPW = <br /> 3.5 THE ORGANIZATION o <br /> DRAWINGS ARE NOT INTENDED TO CONTROL THCD <br /> E CONTRACTOR IN DIVIDING THE WORK AMONG SUBCONTRACTORS OR IN TESTING ng/be/wv-gr http://www.oPwglobal.com/docs/libraries/manuals/retail-fueli able-(/l552-fueii <br /> 5.4 IF ALL OR PART OF THE WORK IS SUSPENDED FOR ANY REASON, CONTRACTOR SHALL PROPERLY COVER OVER, SECURE 1-30-14.p ground/opw-fcs-manuals/71so-testable-testable - N <br /> THE ESTABLISHING THE EXTENT OF WORK TO BE PERFORMED BY ANY TRADE. AND PROTECT ANY PORTION LIABLE TO SUSTAIN INJURY FROM ANY CAUSE. PROCEDURE <br /> 1-30-14.pdf?sfvrsn=4 <br /> 16 DRAWINGS AND SPECIFICATIONS: DRAWINGS INDICATE GENERAL DESIGN AND ARRANGEMENTS DRAWINGS ARE 5.5 PRODUCT PROTECTION: CONTRACTOR SHALL PROVIDE ADEQUATE AND SECURE PROTECTION OF PRODUCT IN TANKS http://www°i3pwglobal.co /docs/libraries/manuals/retaiI fuell <br /> DIAGRAMMATIC AND ARE NOT SCALED FOR DIMENSIONS. TAKE ALL DIMENSIONS FROM ARCHITECTURAL PLANS AND INSTALLATION n below- round/a w°-fcs-manuair,/1-3100 EDGE Thread-On <br /> EQUIPMENT TO BE FURNISHED. VERIFY DIMENSIONS IN THE FIELD. UPON DELIVERY UNTIL TURNED OVER FOR OPERATION. ALL FILL, VENT AND GAUGING CAPS AND/OR OPENINGS SHALL BE � g p <br /> SECURED AND PADLOCKED TO PREVENT VANDALISM OR THEFT. MANUAL Spill Installatian Inst 202281 2.1.3-13 G,pdf?Status=Masten <br /> SPILL-CONTAINMENT sfvrsn=0 <br /> MANHOLES OPW ` <br /> llttp://www.opwglobal.com/docs/libraries/manuals/retail-fueli <br /> PART 4 - RESPONSIBILITY OF THE CONTRACTOR PART 6 - SUBSTITUTION OF MATERIALS TESTING ng/below-ground/opw-fcs-manuals/Double_Wall_Spill_Contarn <br /> HAS READ ALL SPECIFICATIONS AND EXAMINED THE DRAWINGS AND 6.1 MATERIALS AS SPECIFIED REPRESENT REQUIRED STANDARDS. SUBSTITUTION MAY BE: PROPOSED IN WRITING WITH PROCEDURE er Vac_Test_Installation_Instructions_-_English 202383.pdf?St <br /> 4.1 CONTRACTOR HEREBY DECLARE=S HE atus=Master&sfvrsn=0 <br /> THAT HE UNDERSTANDS ALL CONDITIONS_ ADEQUATE SUPPORTING DATA FURNISHED. USE OF SUBSTITUTE MATERIALS IS DEPENDENT ON RECEIPT OF WRITTEN <br /> APPROVAL FROM OWNER'S APPROVED REPRESENTATIVE. <br /> 4.2 CONTRACTOR HEREBY DECLARES HE HAS VISITED THE SITE AND IS FAMILIAR WITH THE CONDITIONS http://www.opwglobal.com/docs/libraries/manuals/retail-fueii � . �� Mid <br /> SHALL BE MADE SUBSEQUENTLY ON BEHALF C THE INSTALLATION ng/below-ground/opw-fcs-manuals/10_Series Emergency_She <br /> AFFECTING THE WORK. NO ALLOWANCES MANUAL <br /> TRACT, ar Valve Installation Instructions -_English_H11374PA.pdf?St <br /> NEGLIGENCE ON HIS PART. IF IN THE PERFORMANCE OF THE CON <br /> CONTRACTOR FOR ANY ERROR PART 7 - COMPLETION OF CONTRACT <br /> IMPACT VALVES OPW <br /> LATENT CONDITIONS AT THE SITE ARE FOUND TO BE MATERIALLY DIFFERENT FROM THOSE INDICATED atus=Master&sfvrsn=0 <br /> BY THE DRAWINGS AND SPECIFICATIONS, OR UNKNOWN CONDITIONS UNUSUALLY INHERENT IN WORK OF 7.1 THE CONTRACT SHALL BE CONSIDERED FULFILLED, SAVE AS PROVIDED IN ANY MAINTENANCE STIPULATIONS, BOND OR BY http://www.opwglobaI.com/docs/libraries/manuals/retail-fueii <br /> THIS CHARACTER SHOWN AND SPECIFIED, THE ATTENTION OF THE OWNER`S CONSTRUCTION MANAGER LAW, WHEN ALL THE WORK HAS BEEN COMPLETED WITH FINAL INSPECTION AND ACCEPTANCE MADE BY ALL APPLICABLE TESTING ng/below-ground/opw-fcs-manuals/10_Series_Emergency_She p, <br /> SHALL BE CALLED IMMEDIATELY TO SUCH CONDITIONS BEFORE THEY ARE DISTURBED. GOVERNING BUILDING DEPARTMENTS, FIRE MARSHAL'S OR OTHER JURISDICTIONS. _ <br /> PROCEDURE ar Valve Installation Instructions -_English_H11374PA.pdf?St � <br /> htLa <br /> 4.3 CONTRACTOR HEREBY DECLARES THAT HE HAS READ AND IS FAMILIAR WITH THE APPLICABLE SOILS 7.2 NOT USED tp21 09 <br /> Master&sfvrsn=0 <br /> INSTALLATION hop://www.vaporless.com/installation/installpdf install_1d200 _ OC <br /> REPORT. <br /> 7.3 CLEANING: MECHANICAL LINE LEAK VAPORLESS MANUAL O.pdf <br /> 43 <br /> CONTRACTOR SHALL BE RESPONSIBLE FOR STRICTLY ADHERING TO THE RECOMMENDATIONS OF SAID DETECTORS MANUFACTURING TESTING http://www.vaporless,com/installation/installpdf/install_Id200 <br /> 94 <br /> SOILS REPORT FOLLOWING ALL APPLICABLE PROCEDURES NOTED THEREIN. EXISTING WATER TABLE SHALL 7.3.1 ALL WORK SHALL BE CLEAN AND READY FOR USE UPON COMPLETION. REMOVE TEMPORARY TAPES, PROCEDURE 0.pdf <br /> POSSIBLY DETERMINE A DIFFERENT UTILIZATION OF THE TANK STRAPS AND TYPE OF BACK FILL WRAPPING, COATING, PAPER LABELS AND OTHER ITEMS. <br /> INSTALLATION <br /> MATERIAL, SHOULD GROUND WATER OR CONTAMINATION BE DISCOVERED DURING TANK EXCAVATION, <br /> WORK SHALL BE SUSPENDED PENDING REVIEW BY 7-ELEVEN CONSTRUCTION MANAGER. 7.3.2 CLEANING METHODS FOR PROPRIETARY MATERIALS SHALL BE IN STRICT ACCORDANCE WITH ELECTRONIC LINE LEAK MANUAL http://www.veeder.com/gold/downlaad.cfm?dac id=6414 <br /> MANUFACTURER'S INSTRUCTIONS. CLEANING SOLUTIONS, AGENTS, SOLVENTS, WAXES OR OTHER DETECTORS VEEDER ROOT <br /> TESTING <br /> ILI!1 0 <br /> 4.4 CONTRACTOR SHALL REPORT ANY OBJECTION TO MATERIALS, APPLIANCES, OR METHODS OF MATERIALS SHALL BE ONLY AS APPROVED BY THE MANUFACTURER OF THE MATERIAL INSTALLED IN PROCEDURE http://www.veeder.com/goid/download.cfm?doc id=6414 <br /> CONSTRUCTION SHOWN FRANKLIN INSTALLATION hoop:/Jww.fra��kEinf�aeling.carr:/rr�edia/46$560/4072934f31rvr1-OR SPECIFIED TO THE OWNER'S CONSTRUCTION MANAGER AND OBTAIN A THE WORK. 0 O <br /> DECISION BEFORE PROCEEDING. "� T <br /> FLEXIBLE CONNECTORS FUELING MANUAL flex-connector-i€ stall.pdf °ry � <br /> 7.3.3 CLEANUP: CONTRACTOR SHALL CLEAN UP ALL DEBRIS CAUSED BY THE WORK OF THIS SECTION, '` <br /> 4.5 PROPOSALS: CONTRACTOR SHALL SUBMIT BID ONLY ON 7-ELEVEN'S FORM THAT WILL BE PROVIDED BY KEEPING THE PREMISES NEAT AT ALL TIMES. O <br /> 7-ELEVEN'S LOCAL CONSTRUCTION MANAGER "COST OF CONSTRUCTION" PROPOSALS SUBMITTED ON ANY a <br /> OTHER FORM <br /> SHALL BE REJECTED AND RETURNED, PROPOSALS NOT COMPLETELY AND PROPERLY FILLEDof f, .U_ <br /> - <br /> OUT SHALL BE REJECTED. PROPOSALS SHALL INCLUDE MONEYS FOR REMOVAL OF ALL EXISTING PART S - CODES PART 1 GENERAL <br /> IMPROVEMENTS AS REQUIRED FOR GASOLINE INSTALLATION. 1.1 SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, SERVICES AND EQUIPMENT AS REQUIRED TO PROVIDE 0 ❑ i` U <br /> 8.1 THE FOLLOWING CODES ARE MADE A PART OF THIS SPECIFICATION. SAID CODES SHALL DICTATE MINIMAL ACCEPTABLE <br /> 4.6 PERMITS: CONTRACTOR SHALL, AS DIRECTED BY 7-ELEVEN, PAY FOR ALL APPLICABLE PERMITS AND AND FEES. COPIES OF STANDARDS. CODE SHALL BE ADHERED TO UNLESS LOCAL GOVERNING AUTHORITIES DICTATE HIGHER OR MORE INSPECTION SERVICES OF THE FUELING INSTALLATION. c> W c) U <br /> Ca d © U <br /> PERMITS AND CERTIFICATES SHALL BE FORWARDED TO LOCAL 7-ELEVEN CONSTRUCTION MANAGERS OFFICE OR SITE STRINGENT REQUIREMENTS WHICH SHALL TAKE PRECEDENCE: <br /> MANAGER PRIOR TO COMMENCEMENT OF WORK. FINAL CERTIFICATION OF ACCEPTANCE BY GOVERNING AUTHORITIES /� C� 00 Z <br /> SHALL ALSO BE ON FILE WITH LOCAL CONSTRUCTION OFFICE OR SITE MANAGER PRIOR TO THE PROCESSING OF FINAL PART "" I N S P E CT I O N V 008.1.1 NFPA 30 FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE <br /> N Q � m <br /> PAYMENT REQUEST. k <br /> 8.1.2 PEI MANUAL"RECOMMENDED PRACTICES FOR INSTALLATION OF UNDERGROUND LIQUID STORAGE 2.1 INSPECTOR: 7-ELEVEN, INC. LOCAL CONSTRUCTION DEPARTMENT AND/OR APPOINTED REPRESENTATIVE SHOULD BE <br /> ADHERE TO ALL REQUIREMENTS OF OWNER'S INSPECTION NOTIFIED TO OBSERVE TIGHTNESS TESTING OF PRODUCT PIPING, STAGE I & STAGE II PIPING PRIOR TO BACKFILL m <br /> 4.7 INSPECTIONS: CONTRACTOR SHALL BE REQUIRED TO <br /> PROGRAM. CONTRACTOR SHALL COMPLY WITH REQUIREMENTS FOR NOTIFICATION, SITE PREPARATION REQUIREMENTS, SYSTEMS. #RP-100-96 (OR LATEST EDITION) U <br /> COMPLIANCE ON-SITE PRESENCE DURING INSPECTION AND CORRECTION OF ANY DEFECTS OR RELATED PROBLEMS AS OSHA AND LOCAL MUNICIPALITIES 2.2 NOTIFICATION: CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING 7-ELEVEN'S CONSTRUCTION DEPARTMENT 48 -0 U 4 B <br /> DIRECTED BY INSPECTING REPRESENTATIVE CONTRACTOR SHALL PROVIDE NO LESS THAN 48 HOURS NOTICE PRIOR TO 8.1.3 HOURS PRIOR TO REQUESTED INSPECTION <br /> -° cI) U <br /> INSPECTION. <br /> GUARANTEE E 2.3 SPILLAGE: SHOULD SPILLAGE OF PRODUCT OCCUR AT ANY PHASE OF INSTALLATION OR TESTING, LOCAL 7- ca <br /> 2 2 4 8 E 7 -- <br /> 4.8 COORDINATION: FUEL CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING ALL PHASES OF THE GASOLINE PART JTY 1 G `� ° `� <br /> CONSTRUCTION DEPARTMENT AND ENVIRONMENTAL DEPARTMENT ARE TO BE NOTIFIED IMMEDIATELY, ESTIMATED LOSS o a M m � ° `o E <br /> INSTALLATION WITH THE GENERAL CONTRACTOR IN CHARGE OF THE BUILDING OR MAJOR PORTION OF THE PROJECT. THE OF PRODUCT AS WELL AS ACTION TO BE TAKEN BY CONTRACTOR TO SAFEGUARD THE EVENT FROM FURTHER MISHAP AND � ° 5 $ a U <br /> BUILDING GENERAL CONTRACTOR AND THE FUEL CONTRACTOR SHALL JOINTLY DEVELOP A MUTUALLY AGREEABLE 9.1 EXCEPT WHERE SPECIAL GUARANTEES ARE REQUIRED IN EXCESS OF ONE (1)YEAR, THE CONTRACTOR AGREES TO REPAIR TO PROTECT THE GENERAL PUBLIC IS TO BE NOTED AND RECORDED. N 0- c > �_ °' W <br /> o 2 <br /> TIMETABLE FOR BUILDING AND GASOLINE AND RE-CERTIFY OR REPLACE THE DEFECTIVE COMPONENT OR ANY DEFECT IN MATERIAL OR WORKMANSHIP (BEYOND �' ° ° � °' 2 <br /> .� <br /> SCHEDULE AND TIMETABLE: FOR COMPLETION ON THE GASOLINE INSTALLATION. °5 `� EJ <br /> ORDINARY WEAR AND TEAR TO THE SATISFACTION OF THE OWNER'S CONSTRUCTION MANAGER FOR A PERIOD OF ONE (1) 2.4 REPRESENTATIVE OF CONTRACTOR AND FUEL CONTRACTOR SHALL BE AVAILABLE ON SITE DURING TESTING PROGRAMS. 0_� 3 x u ) o. 3 b <br /> SHALL COINCIDE AND COMPLIMENT EACH OTHER SO THAT ONE DOES NOT DELAY THE OTHER. ) <br /> YEAR AFTER DATE OF ACCEPTANCE, WHETHER IN HIS WORK OR IN THAT OF SUBCONTRACTOR'S,WITHOUT COST TO THE FAILURE TO COMPLY WITH THIS REQUIREMENT WILL RESULT IN ANY CORRECTIONS AND/OR REPAIRS REQUIRED BEING `0-o'-,00-02 ro Mr <br /> .3 U c <br /> SHOULD FUEL CONTRACTOR FAIL TO MEET DEADLINES AS ESTABLISHED BY THE SCHEDULE AND/OR HOLD UP THE OWNER. PERFORMED BY OWNER AS REQUIRED, COST OF SAID REPAIRS AND/OR CONNECTIONS SHALL BE DEDUCTED FROM C ° :¢ o a 0� o 0 o M <br /> COMPLETION OF THE OVERALL BUILDING PROJECT, 7-ELEVEN, INC. RESERVES THE RIGHT TO RECTIFY THE SITUATION CONTRACT AMOUNT AS REQUIRED TO SATISFY THE SITUATION. �'C7 a� w `� °'� cn <br /> `� <br /> E;_; 9.2 ALL PAVING WILL HAVE A TWO YEAR WARRANTY. E 2 ",L) ° ° ° � T ° S ° <br /> �O Q V a)� Aa) N ° N N <br /> ACCORDINGLY. 2.5 PROHIBITED WORK: CONTRACTOR SHALL SCHEDULE WORK SUCH THAT NO HEAVY EQUIPMENT IS OPERATING ON SITE a Uy °°.,(D a M X ° as M c `° <br /> z DURING INSPECTION PROGRAMS. NO WELDING OR OPEN FLAMES SHALL BE ALLOWED ON SITE AT ANY TIME DURING TEST ° `�E �'U j- �._U) <br /> 4.9 CONTRACTOR SHALL PROVIDE OWNER WRITTEN CERTIFICATION AS TO THE FOLLOWING: <br /> a PROCEDURES. <br /> 4.9.1 CERTIFICATION FROM LOCAL/STATE GOVERNING AUTHORITIES AS APPLICABLE FOR CONTRACTOR PART1 O - AS BUILT PLAN AND DOCUMENTATION <br /> 2.6 <br /> CERTIFICATION/LICENSING FOR INSTALLATION OF GASOLINE STORAGE TANK SYSTEM. INSTALLATION REPORTS: SHOULD 7-ELEVEN DR THEIR APPOINTED REPRESENTATIVES BE UNABLE TO BE PRESENT AT SITE <br /> 10.1 UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE"AS-BUILT SITE PLAN"VERIFYING FINAL LOCATION OF P F <br /> FOR PURPOSES OF FILING ANY INSPECTION REPORTS, CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE INSPECTION <br /> 4.9.2 CERTIFICATION FROM EQUIPMENT MANUFACTURES AND SUPPLIERS {TANKS, PRODUCT LINES, IMPROVEMENTS INCLUDING, BUT NOT LIMITED T0, PIPING, PLUMBING AND ELECTRICAL. AND FILING OF REPORT WITH LOCAL 7-ELEVEN, INC. CONSTRUCTION OFFICE. WRITTEN REPORT SHALL INCLUDEfnrn <br /> ATG'S, ETC.)AS TO ATTENDING AND ACHIEVING CERTIFICATION FROM APPROPRIATE COMPANY FOR PHOTOGRAPHIC DOCUMENTATION OF ALL PROCEDURES. a 19 <br /> INSTALLATION OF EQUIPMENT. 10.2 CONTRACTOR SHALL KEEP PHOTOGRAPHIC JOURNAL OF ALL PHASES OF THE COMPLETE INSTALLATION. PHOTOGRAPHS <br /> ARE TO BE PROPERLY DATED, IDENTIFIED AND FORWARDED TO LOCAL 7-ELEVEN, INC. CONSTRUCTION OFFICE,WITH FINAL 2.7 TEST FAILURE: SHOULD SYSTEM FAIL ANY PORTION OF TEST PROGRAM, CONTRACTOR SHALL IMMEDIATELY INSTIGATE # <br /> a. Sj ��NAN��P� �r <br /> `I 4.9.3 CERTIFICATION ON APPROPRIATE FORMAT AS TO INSTALLATION OF COMPLETE SYSTEM BEING PROCEDURES AS REQUIRED TO BRING SYSTEM INTO COMPLIANCE SHOULD FAILURE OF TEST DUE TO FACILITY WORK <br /> 'r ¢�' <br /> INVOICE PACKAGE. <br /> J <br /> PERFORMED IN COMPLIANCE WITH ALL LOCAL, STATE AND FEDERAL LAWS AND REGULATIONS. REQUIRE EXPENDITURE OF ADDITIONAL MONIES FOR RESCHEDULING ANDIDR RETESTING OF SYSTEM, CONTRACTOR .,c- CAt j <br /> SHALL BE HELD RESPONSIBLE FOR COMPENSATION ACCORDINGLY. <br /> 4.9.4 CERTIFICATION THAT ALL EQUIPMENT EITHER SUPPLIED BY OWNER OR CONTRACTOR HAS BEEN <br /> INSTALL/=D AS PER MANUFACTURER'S SPECIFICATIONS BY PERSONNEL TRAINED AND QUALIFIED 2.8 CLEANUP: IN THE ITVENT PRODUCT SPILLAGE SHOULD OCCUR DURING CONSTRUCTION OR DURING WARRANTY PERIOD <br /> FOR THAT SPECIFIC ITEM. DUE TO WORK PERFORMED BY CONTRACTOR, CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP AS MAY BE REQUIRED. <br /> SHEET: <br /> 2.9 TEST REPORT. UPON COMPLETION OF TESTING PROGRAMS, REPRESENTATIVE OF TESTING/ INSPECTION COMPANY SHALL <br /> G13 - 0 <br /> BE RESPONSIBLE FOR FILING COPIES OF TANK AND PIPING TEST/INSPECTION REPORTS WITH LOCAL 7-ELEVEN, INC. <br /> CONSTRUCTION OFFICE OR THE OWNER'S ASSIGNED SITE MANAGER WITH COPY TO JOB SITE. <br /> z <br /> FUELING - USA <br />