Laserfiche WebLink
ti <br /> OPW 7150 Overfill Materials Important <br /> Prevention Valves In order to prevent product <br /> Valve Body: Cast aluminum spillage from the Underground <br /> The CARE-certified OPW 71 SO Storage Tank(UST),properly <br /> Float: Nitrile rubber, closed cell foam maintained delivery equipment <br /> vapor-tight Overfill Prevention Valve and a proper connection at the <br /> is designed to prevent the overfill of Valve:Aluminum tight-fill adaptor are essential. <br /> underground storage tanks by providing Seals:Viton® Delivery personnel should <br /> be managed and trained <br /> a positive shut-off of product delivery. Upper & lower Drop Tube:Aluminum to inspect delivery elbows <br /> The shut-off valve is an integral part of Plastic parts:Acetal ���� and hoses for damaged and <br /> the drop tube used for gravity filling. missing parts.They should <br /> Hardware: Stainless steel always make certain there <br /> The OPW 7150 allows easy installation is a positive connection <br /> (without breaking concrete) and requires Features between the adaptor and <br /> no special manholes. ;F elbow.If delivery equipment <br /> ♦ Simple, Easy and Quick is not properly maintained, <br /> The 0 P 71 SO is a vapor-tight two- Installation—no excavation or or the elbow is not securely <br /> stage shut-off valve.When the liquid s ecial manholes re ulred. coupled the adaptor,a <br /> P q serious spill may result when <br /> level rises to about 95% of tank ♦ Economical—costs a fraction the OPW 71 SO closes,causing <br /> capacity,the valve mechanism is a hazard and environmental <br /> released, closing automatically with of expensive,complicated and contamination. <br /> the flow.This reduces the flow rate to difficult-to-install valves. , <br /> approximately 5 gpm through a bypass ♦ Furnished Complete—supplied NOTE:The OPW 71 SO is <br /> valve.The operator may then stop the with new upper and lower drop tubes, designed for use on tight-fill <br /> p Y p gravity drop applications only. <br /> filling process and disconnect and drain mounting hardware and thorough Do not use for pressure <br /> the delivery hose.As long as the liquid instructions for quick job site time. fill applications. <br /> exceeds the 95% level, the valve will ♦ Completely Automatic Operation <br /> close automatically each time delivery —no prechecks to perform, no resets ♦ Retrofits Directly—for both new <br /> is attempted. and no overrides to be broken and existing tanks with 4" fill risers. <br /> If the delivery is not stopped and the or abused. ♦ Quick Drain Feature— <br /> liquid rises to about 98% of tank ♦ No Pressurization of the Tank— automatically drains hose when head <br /> capacity,the bypass valve closes operates directly from liquid level. pressure is relieved. <br /> completely. No additional liquid can flow ♦ Will Accept a Dipstick ♦ Best Flow Rate in The Industry* <br /> into the tank until the level drops below <br /> a reset point. for Gauging *OPW Test Lab results <br /> NOTE:The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity. Please contact the Compared to Overfill Warning Systems: <br /> Authority Having Jurisdiction (AHJ) and ♦ Completely Automatic faster fill times and reducing <br /> review local, state,and national codes to Operation—does not rely on the spill risk. <br /> determine the regulatory requirements alertness ors speed of response of the <br /> governing shut-off capacity in your p p 4- Speeds Delivery Operations <br /> region, as well o take into account delivery attendant for certainty of —product flows unimpeded into <br /> other considerations such as extreme overfill prevention. the tank until the hose "kick" that <br /> tank tilt. In all cases,the upper tube 4- Keeps the Top of UST "Dry," accompanies the valve shut-off <br /> must protrude into the tank at least per EPA Requirements— provides a clear signal that the <br /> 6 112" to ensure that the valve can shut eliminating possible leaks at loose liquid has reached the shut-off level. <br /> off flow into the tank completely before bung fittings and the need for ♦ Simple and Inexpensive <br /> the top of the tank is wetted as per double containment on vent lines. Installation—in both two-point <br /> EPA requirements. ♦ Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow—allowing additional excavation, manholes or <br /> 71 SO Instruction Sheet Order vent piping are required. <br /> Number: H15524PA <br /> Look for this label for <br /> Listings andO Wlilnl' authentic OPW EVR <br /> 0- UlrApproved products. <br /> ir <br /> Certifications Beou cesBoard j ovw. OPW 7150 is EVR Approved for E85 <br /> 1nu n PWS <br />