My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
INSTALL_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 2:36:18 PM
Creation date
12/7/2020 10:52:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2020
RECORD_ID
PR0231074
PE
2351
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CGRS <br /> SOLUTIONS DELIVERED <br /> iota <br /> ENHANCED LEAK DETECTION <br /> June 20,2019 <br /> Site Location <br /> 7-Eleven#20632 <br /> 4627 Da Vinci Dr. <br /> Stockton,CA 95207 <br /> Subject: Work Plan for IOTA v005®and iotaVisionT.Pre and Final ELD Testing Services <br /> To Whom It May Concern: <br /> CGRS is pleased to present you with this work plan for pre and final enhanced leak detection (ELD)testing services for your <br /> project at the above referenced location. CGRS will utilize the iota VaporTite V005 and iotaVision'" L005 (LG 113) to <br /> perform the final ELD post installation test as required by the State of California. These test methods have been evaluated <br /> by the California State Water Resource Control Board and determined to meet the performance requirements for post <br /> installation ELD testing(see LG 162-3 attached). <br /> O Pre Testing will be performed on the primary containment portion of the fueling system with the IOTA test method <br /> while the tank top and product, vent and vapor piping is exposed, prior to backfilling. Any problems encountered <br /> during the pre-testing will be addressed by the installation contractor and retested by CGRS the testing crew. <br /> O Final ELD testing will be performed on all primary fuel containment system components once the fueling system <br /> has been completed (everything below grade surface) backfilled, concrete poured, and the system is essentially <br /> ready to receive fuel.This will provide the installation contractor, general contractor, design engineer, site owner <br /> and operator with third party certification that the system is"vapor tight"before it ever receives fuel. <br /> O Final testing with iotaVision'" will be performed on all brine filled underground storage tanks and their <br /> compartments thus ensuring that brine is not observed in the primary containment. <br /> CGRS holds a current California Contractors License with a Hazardous Materials endorsement. All final ELD testing will be <br /> performed by a certified IOTA technician holding a current California Tank Tester license. <br /> If you have any questions regarding any aspect of this work plan,please don't hesitate to contact me at 1-800-288-2657. <br /> Sincerely, <br /> Chris Murphy <br /> Director of CA Operations <br /> CGRS, Inc. <br /> 0 0Academy <br /> Fort Collins, 8052 <br />
The URL can be used to link to this page
Your browser does not support the video tag.