Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Pian <br /> Site Address : ._10842 S HARLAN RD . FRENCH CAMP CA 95231 <br /> . . . . . . .Vent 0 . . . . . . <br /> Line ;�a <br /> Product Piping . L . <br /> Electronic Line <br /> . 1 . .. . .,1_ 1--T . . .,._.1 : . : 61' . . . . . _ ._ am " _i i . Leak petectpr , <br /> 0000 . u � <br /> 1004 . 60 . . I <br /> 4 0 <br /> .1 a 0 <br /> `I 4 . ,-I I . : : : : • � ; : : : : —'� . <br /> door <br /> Turbine , . <br /> . . . Containment m <br /> M. <br /> �-- . . . . sump . g <br /> o. <br /> -Dispenser Pans . .'0° . . <br /> •Spill •Bucket. . fD. . . . <br /> � . <br /> . . a . . . , <br /> 1 , <br /> 01 Water ; Q <br /> o ' <br /> 6 Separator m <br /> Z • : <br /> s. .. •� . <br /> GJ Llquid O 3:0 <br /> . . . . . Level . . . a. <br /> Probe. . <br /> Monitoring • . 0 • ' ' ' ' • • 6 • .Annular Space Monitor, <br /> Syiteim 'Control . V) . <br /> . lel Control <br /> S Harlan Rd -r �} Room <br /> � 4444 : : �� <br /> : . . . . . . . . <br /> Date map was drawn: <br /> Instructions <br /> If you already have a diagram that shows all required information , you may include it, rather than this page, with your <br /> Monitoring System Certification . On your site plan, show the general layout of tanks and piping. Clearly identify <br /> locations of the following equipment, if installed : monitoring system control panels ; sensors monitoring tank annular <br /> spaces , sumps , dispenser pans , spill containers , or other secondary containment areas ; mechanical or electronic line leak <br /> detectors ; and in-tank liquid level probes ( if used for leak detection). In the space provided, note the date this Site Plan <br /> was prepared . <br /> Page of 05/00 <br /> i <br />