My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
2125
>
1600 - Food Program
>
PR0539838
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2021 9:34:05 AM
Creation date
12/9/2020 9:19:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0539838
PE
1624
FACILITY_ID
FA0022791
FACILITY_NAME
THAI ME UP
STREET_NUMBER
2125
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2125 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sn K J 0 n Q I I I N Environmental Health Department <br /> —00U NNITY— <br /> The EHD must be kept informed of the construction progress. A final inspection must be <br /> performed, operating permit fees paid, and approval to operate granted prior to opening for <br /> business. All equipment must be installed and thorough cleaning completed prior to the final <br /> inspection. Inspections must be scheduled at least 48 hours in advance. Charges for <br /> additional inspections, re-inspections and/or consultations may be assessed at the EHD <br /> hourly rate of$152 per hour. <br /> Any item(s) inadvertently overlooked in the plan check process, which is not in compliance <br /> with applicable State laws, and/or city or county ordinance codes, shall be constructed or <br /> reconstructed upon request of the EHD. Inferior workmanship, equipment, or materials will not <br /> be accepted for the construction or operation of a food facility. Any variance from the <br /> requirements outlined in this letter will require written approval from the EHD. Approval of the <br /> submitted plans shall become null and void if the work authorized is not commenced within <br /> 180 days from the date of approval, or the work authorized by such plans is abandoned. In <br /> order to renew action on an expired plan approval, the applicant shall submit fees equal to <br /> that of a new plan review. A copy of the approved plans shall be available on site at the time <br /> of final inspection. <br /> If you have any questions, please contact Maribel Flohrschutz, Senior Registered <br /> Environmental Health Specialist, at (209) 953-7817 or 468-3420. <br /> Sincerely, <br /> �l .� <br /> Jeff Carruesco, REHS, RDI <br /> Program Coordinator <br /> JC <br /> 2 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.