Laserfiche WebLink
Tylor McMillan's Well Service <br /> 9530 Hageman Rd. STE B#349 Bakersfield CA,93312 <br /> Phone:(916)761-5224 Email:mcmillans521na,gmail.com <br /> Website:www.wellblaster.com <br /> Date: November 13,2020 <br /> BLASTING WORK PLAN <br /> Well: Carbons CA I Well Location:37.695780 Plan date and time: fending <br /> Casing 16-inch ID Steel to 155 feet -121.413017 <br /> 4—Sealing pipe Boosters <br /> GL I Density g/cc 1.55 g/cc <br /> Detonation Velocity 24,000 ft/s 7,315 m/s <br /> Casing Diameter 16 inches <br /> Detonator placed at 20 feet Charge Wt. 0.15 Kg 150 grams <br /> i <br /> i <br /> 50' i Detonation pressure 207 k/bar <br /> i <br /> Total energy ea. 13,997 k/bar <br /> i Pressure at casing 6.53 k/bar 97,692 psi <br /> Detonating Cord <br /> Pressure at 10 feet 0.00 29 psi <br /> ' Start 20 feet <br /> 100 i Intervals Linear Explosive Cord <br /> End 155 feet Density g/ce 1.60 g/cc <br /> Strength 50 grain Detonation Velocity 22,000 ft/s 6,706 m/s <br /> i Total 135 feet Casing Diameter 16 inches <br /> Grains 50 gr/ft 3.24 g/ft <br /> 150' <br /> Booster Placement <br /> Start 20 feet Detonation pressure 180 k/bar <br /> Intervals 10 feet Total energy pef ft. 22 k/bar <br /> End 150 feet Pressure at casing 0.11 k/bar 1,627 psi <br /> Total 14 Boosters *These are estimated pressure for a empty well <br /> ?00' <br /> Site procedure <br /> 1. Check site and measure well depth <br /> 2. Clear work site of all unessential personal <br /> 3. Lower charges and drop pipe into the well <br /> X11. 4. Pump sealing material to top of well <br /> 5. Check and clear blast area(sound blast warning) <br /> 6. Atm explosives <br /> 7. Confirm area clear(final blast warning) <br /> 8. Detonate charge <br /> 9. Check hole and sound all clear <br /> 300' 10. Refill cement to top of well to form a mushroom cap <br /> Total Explosives Name of Blaster Preparing Plan: Tylor McMillan �. <br /> 5.5 lbs. <br /> 350' *Tylor McMillan's Well Service reserves the right to change or modify the charge in <br /> any way necessary to maintain the safety of all personnel onsite and in surrounding <br /> areas. <br /> 400' <br /> 450' <br />