Laserfiche WebLink
COMMUNITY DEVELOPMENT DEPARTMENT <br />SITE APPROVAL RR"MFOj <br />• <br />FILE NUMBER:42000 <br />Name: Meza Trucking Nan -ie: Paul Bickford <br />Mailing Address: PO Box 980 IMailing Address: PO Box 771 <br />Lockeford Ca 95237 Lockeford Ca 95237 <br />r� <br />Phone: 209-329-1412 Phone: 209-224-7040 <br />1 Email: Jmezatrucking3@gmail.corn Email pbickford@bickfordconstruction.com <br />P'rtaiect Cieseriptifle <br />f 42tacfi arakt trorial gtr eta as mc'essary) <br />Retail landscaping services of materials for cutdoor projects. Saies to public. 8,000 sqft metal building for parking of 2-4 trucks used for hauling materials sold <br />and space for a future office in the building cf approx 1200sgft. business would sten In phase 1 in a 8 x 16 temporary office trailer for sales, Phase 2 would <br />include 1200sgft office in the metal building. azerior will include an above Ground diesel fuel storage tank, Material storage area out doors for landscape materials such <br />as Sands, soils and aggregates. The materials of tha sorcen wall mate, is; around bulk storage will be determined during design and in accordance with county requirements. <br />The Trucks will be parked indoors and the trailers left outdoors. They a; a semi trucks with dump beds and trailers. They will be used for hauling of material purchased <br />from the site or bringing in material that they have purchased for sale at the site. This company is rust retail sales of the materials to the public or businesses and no installation <br />Trucks wil! be parked inside the building at night <br />The project will be built in 2 phases. Phase 1 will include all site work shown on plan and the metal building shell to include lighting, power, water, and other <br />items required during design and building permit application process. and power only to operate as a garage for trucks), phase 1 should take about 6-8 months <br />Phase 2, This Phase ivouH include the construction of the office space within the metal building and removal of the temporary office <br />trailer. this Phase 2 shouid take 6-8 months and would be corrlp!eted at sometime over the next 5 year period under a separate building permit. <br />4 <br />Will the project inciude more than one (1) phase? (maximum of 2 phases) Yes M No ❑ <br />Length of'time (maximum of 5 years,'R: 5 years <br />Note: For questions regarding phasing, contact the Planning 'Division at 209-468-3121 <br />Page I of 6 <br />Updated 0612712020 <br />