My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0081390_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PELTIER
>
7099
>
2600 - Land Use Program
>
SR0081390_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2021 11:25:16 AM
Creation date
12/16/2020 9:41:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0081390
PE
2602
FACILITY_NAME
7099 E PELTIER RD
STREET_NUMBER
7099
Direction
E
STREET_NAME
PELTIER
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
00526061
ENTERED_DATE
11/12/2019 12:00:00 AM
SITE_LOCATION
7099 E PELTIER RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7777is <br /> .ti .• dt° y n. F it N .1 t <br /> �: #' 131 Sao:, Avelim,"Ain A � MCI id-rd;1.11)wjb-i <br /> i *I:i�.;'4_s 4=i!,?,. !c ?.Oit.'1.8fi.1519 ldiliitc L00.?.$5.19x!1 (a:: rn:rr.l;t Ilelassua d�s.i:ulu <br /> f May 14.,2015 <br /> I <br /> Brock Martinson <br /> CTA Architects Engineers <br /> 800 West Main Street#800 <br /> Boise, Idaho 83702 <br /> Re; Bayer Crop$cience Acampo Facility—Leachfield and Seepage Pit Design <br /> Dear Mr.Martinson: <br /> I have reviewed the design capacity of the 3—60-foot leachfield drainage pipes and 3 —36-inch <br /> diameter 25-foot deep seepage pits located at the end of each leachfield pipe.The percolation <br /> rate tested is 4.39 minutes/inch as stated on the Onsite Wastewater Treatment System Permit <br /> Land Use Application#PA-0600237 for this site located at 7087 East Peltier Road in Acampo, <br /> California. <br /> Based on.the San Joaquin County Environmental Health Department standards and standard <br /> engineering design, the new building foundation constructed 5 feet fiom one of the drainage <br /> pipes will not significantly impact the capability of the wastewater treatment system to function <br /> normally. Additionally,there is no apparent damage to the leachfield drainage pipes caused by <br /> the construction of the new building foundation. <br /> If{fy questions have an questions regarding these findings, 1' b or the project in general,please call me at <br /> J b <br /> 530.400.4594 or email me at devensen ct lcellerassociates.com, <br /> Very truly yours, <br /> KELLER ASSOCIATES, INC. <br /> Q�-f ESSI N,tl <br /> Darrel Evensen,P.E. <br /> Project Manager m <br /> c� 5 $ <br /> F OF <br /> 210116.010/2/15-[V <br /> clallslnu k1ahl)Rik. < M(:6(14au lb,:Ik to Ilncki;prings &ot^a1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.