My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0081390_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PELTIER
>
7099
>
2600 - Land Use Program
>
SR0081390_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2021 11:25:16 AM
Creation date
12/16/2020 9:41:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0081390
PE
2602
FACILITY_NAME
7099 E PELTIER RD
STREET_NUMBER
7099
Direction
E
STREET_NAME
PELTIER
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
00526061
ENTERED_DATE
11/12/2019 12:00:00 AM
SITE_LOCATION
7099 E PELTIER RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
131 Svc'5 Ave iu,SLAn it Meridia;i.11J 8464? <br /> 203.286.1992 phone • 200.288.1999 fax r:rn:.htiirtd.^su is l,e:.i:um <br /> May 14.,2015 <br /> C <br /> Brock Martinson <br /> CTA Architects Engineers <br /> 800 West Main Street#800 <br /> Boise,Idaho 83702 <br /> I <br /> Re: Bayer Cropkience Acarnpo f=acility-- Leachtield and Seepage Pit Design <br /> Dear Mr.Martinson: <br /> I have reviewed the design capacity of the 3—60-foot leach-field drainage pipes and 3—36-inch <br /> diameter 25-foot deep seepage pits located at the end of each leachfie'ld pipe.The percolation <br /> rate tested is 4.39 minutes/inch as stated on the Onsite Wastewater Treatment System Permit <br /> Land Use Application#SPA-0600237 for this site located at 7087 East Peltier Road in Acampo, <br /> California. <br /> Based on.the San Joaquin County Environmental Health Department standards and standard <br /> engineering design,the new building foundation constructed 5 feet fiom one of the drainage <br /> pipes will not significantly impact the capability of the wastewater treatment system to function <br /> normally. Additionally,there is no Apparent damage to the leachfield drainage pipes caused by <br /> the construction of the new building foundation. <br /> s <br /> If you have an questions regarding <br /> these findings, the project in general lease call me at <br /> Y Yti g a g :or PJ �p <br /> 530.400.4594 or email me at devensen@kellerassociates.com. <br /> I <br /> i' <br /> Very truly yours, <br /> KELLER ASSOCIATES, INC. <br /> of ESSI <br /> Darrel Evensen,P.E. <br /> Project Manager y -z- <br /> 5 5 <br /> �ClV! <br /> i FGA <br /> 2L011G-010/2/15-I87 <br /> '' Gail:shl) IdahOrall:: Mt:ridiml Poe<dt:Uo 1114S11611tis ill'.503 . :•':'•y.`fi; ';. <br />
The URL can be used to link to this page
Your browser does not support the video tag.