My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON BELLOTA
>
4391
>
2300 - Underground Storage Tank Program
>
PR0528866
>
INSTALL_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2020 12:03:03 PM
Creation date
12/17/2020 10:55:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2008
RECORD_ID
PR0528866
PE
2351
FACILITY_ID
FA0019340
FACILITY_NAME
FARMINGTON CIRCLE K
STREET_NUMBER
4391
Direction
S
STREET_NAME
ESCALON BELLOTA
STREET_TYPE
RD
City
FARMINGTON
Zip
95230
APN
18713006
CURRENT_STATUS
02
SITE_LOCATION
4391 S ESCALON BELLOTA RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE MITIGATION <br /> a. In the event contamination is observed, confirmed or suspected as a result of a <br /> leaking UST system, it is the responsibility of the owner or operator to submit <br /> a work plan to EHD Site Mitigation Unit prior to initiating any assessment or <br /> remediation activities. <br /> b. To minimize delays, a Corrective Action Plan may be submitted concurrent <br /> with tank closure or installation plans. Address one copy of the Corrective <br /> Action Plan to the Site Mitigation Unit for review For further assistance <br /> contact the Site Mitigation Unit at(209) 468-3450. <br /> B. PLAN REVIEW AND OPERATING PERMIT FEES <br /> 1 New facility plan review fee of$840.00 (8 hour minimum per facility), $550.00 <br /> facility fee (includes one tank), $125.00 per tank after the first tank, plus $15.00 <br /> state surcharge fee per tank is due at time of plan submittal plus $24.00 per site <br /> state surcharge. <br /> 2. New installation of an additional tank at an existing facility is $840.00 plan <br /> review fee (8 hour minimum per facility) plus $125.00 per new tank after first <br /> tank, and $15.00 per new tank state surcharge fee. <br /> 3 It should be noted that a $840.00 plan review check fee required for each <br /> submittal allows for up to eight (8) hours of staff review and/or inspection time. <br /> Additional time spent on plan review, meetings, inspections, phone or office <br /> consultations will be billed to the applicant at a rate of$105.00 per hour. <br /> 4- The maximum review time for UST installation plans is 40 working days. A <br /> preliminary review will be conducted by the EHD within 20 working days of <br /> submittal date to identify any gross plan deficiencies. <br /> 5. If gross deficiencies are identified, the plans will be returned with a checklist <br /> identifying plan deficiencies. <br /> 6. To expedite the review of installation plans, time and a half per hour overtime <br /> fee may be submitted to have review completed within 10 working days of <br /> submittal date if staff is available to perform the review. <br /> Revised 07/31/08 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.