My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON BELLOTA
>
4391
>
2300 - Underground Storage Tank Program
>
PR0528866
>
INSTALL_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2020 12:03:03 PM
Creation date
12/17/2020 10:55:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2008
RECORD_ID
PR0528866
PE
2351
FACILITY_ID
FA0019340
FACILITY_NAME
FARMINGTON CIRCLE K
STREET_NUMBER
4391
Direction
S
STREET_NAME
ESCALON BELLOTA
STREET_TYPE
RD
City
FARMINGTON
Zip
95230
APN
18713006
CURRENT_STATUS
02
SITE_LOCATION
4391 S ESCALON BELLOTA RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17= a 7 7, 5 Z a <br /> PASS -THROUGH PIPING <br /> The obvious benefit of this setup drastically reduces the number of tees, elbows, clamshells, glued <br /> joints, crossovers and fittings compared to manifold-type installations. <br /> ALL SMITH FIBERCASTTM PIPE, BRAVO 9000-D-AB SUMPS, FLEX CONNECTORS AND SHEAR VALVES ARE FOR ILLUSTRATION PURPOSES ONLY. <br /> Z, _ Standard: <br /> Test Port to <br /> test/ monitor <br /> Secondary <br /> y'% f Pipe <br /> �L 3 fi4 c <br /> Standard: <br /> - <br /> __ Interstice Test <br /> Port for testing <br /> d , <br /> x, <br /> Fluid / air <br /> r_.., <br /> communication <br /> Primary passes <br /> through fitting for <br /> testing, while not <br /> permanently installed <br /> / r i After primary passes <br /> testing, the primary <br /> is then sealed to the <br /> fitting by <br /> b adhesive <br /> i <br /> c <br /> .�. ince •o <br /> The secondary is then <br /> sealed and tested. <br /> MANDATORY TOOLS FOR INSTALLATION: Consult Installat.,on in trui,; for ai <br /> T-F-33-CLAMP Clamping Tool <br /> T-F-33-SAND Sanding Gun (5/8") T-F-33-SAND-GUN <br /> T-F-33-SAND-KIT Modular Steel disc set for fittings <br /> y vu`IN 4 <br /> s a <br /> /�\s, tea= E <br /> I <br /> *-, 3 <br /> T-F-33-CLAMP ' <br /> T-F-33-SAND-KIT <br /> SAFETY FIRST! S.Bravo Systems,Inc.urges you to carefully adhere to the normal safety procedures and precautions recommended by <br /> your company.Please follow the mandates and compliances decreed by local and federal regulations regarding the use of this product. M l; M t R <br /> PELE <br /> 323/888-4133 <br /> r'ryW/.fb/.e <br /> BRAVOS. BRAVO SYSTEMS, INC 2929 Vail Avenue Commerce CA 90040 �iuuIR IPWIW�1\4t <br /> Patents Pending Fax 323/888-4123 - E-mail: info@sbravo.com - www,SBravo.com FS-S-DS-D 11-07C <br />
The URL can be used to link to this page
Your browser does not support the video tag.