My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON BELLOTA
>
4391
>
2300 - Underground Storage Tank Program
>
PR0528866
>
INSTALL_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2020 12:03:03 PM
Creation date
12/17/2020 10:55:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2008
RECORD_ID
PR0528866
PE
2351
FACILITY_ID
FA0019340
FACILITY_NAME
FARMINGTON CIRCLE K
STREET_NUMBER
4391
Direction
S
STREET_NAME
ESCALON BELLOTA
STREET_TYPE
RD
City
FARMINGTON
Zip
95230
APN
18713006
CURRENT_STATUS
02
SITE_LOCATION
4391 S ESCALON BELLOTA RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7= a7n � F�� & <br /> PASS -THROUGH PIPING <br /> The obvious benefit of this setup drastically reduces the number of tees, elbows, clamshells, glued <br /> joints, crossovers and fittings compared to manifold-type installations. <br /> ALL SMITH FIBERCASTTM PIPE, BRAVO 9000-D-AB SUMPS, FLEX CONNECTORS AND SHEAR VALVES ARE FOR ILLUSTRATION PURPOSES ONLY, <br /> Standard <br /> Test Port to <br /> ! test/ monitor <br /> q, <br /> kF <br /> Secondary <br /> Pipe <br /> Standard: <br /> i Interstice Test <br /> Port for testing <br /> Fluid / air <br /> communication <br /> Primary passes <br /> through fitting for <br /> testing, while not <br /> x _x, permanently installed <br /> C77 1 ! After primary passes <br /> testing, the primary <br /> J is then sealed to the <br /> i t fitting by adhesive <br /> injection <br /> The secondary is then <br /> sealed and tested. <br /> i <br /> I <br /> MANDATORY TOOLS FOR INSTALLATION: Consult Installation Instruction Manual <br /> T-F-33-CLAMP Clamping Tool <br /> T-F-33-SAND Sanding Gun (5/8") T-F-33-SAND-GUN <br /> T-F-33-SAND-KIT Modular Steel disc set for fittings <br /> ger ,Q, / <br /> T-F-33-CLAMP <br /> T-F-33-SAND-KIT <br /> ''>aY.reax <br /> SAFETY FIRST! S.Bravo Systems,Inc.urges you to carefully adhere to the normal safety procedures and precautions recommended by <br /> your company.Please follow the mandates and compliances decreed by local and federal regulations regarding the use of this product. M T M tt 6 R <br /> 323/888-4133PR� <br /> S. BRAVO SYSTEMS, INC 2929 Vail Avenue - Commerce CA 90040 V s ,arra r 1"r7 <br /> Patents Pending Fax 323/888-4123 - E-mail: info@sbravo.com - www.SBravo com FS-S DS-D 11-07C <br />
The URL can be used to link to this page
Your browser does not support the video tag.