EROSION CONIROL NOIEZ-_ <br /> L ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED DURING CONSTRUCTION BY THE CONTRACTOR <br /> PER THE EROSION AND SEDIMENT CONTROL STANDARDS AND SPECIFICATIONS LATEST REVISION, <br /> 2. CONTRACTOR TC COMPLY WITH CLEARING AND DUST CONTROL NOTES FOUND ON GRADING PLAN, <br /> 3. INLET FILTERS SHALL BE PLACED AROUND ALL DRAIN INLETS WHICH COULD RECEIVE DRAINAGE IN <br /> UNPAVED AND PAVED AREAS DURING THE WET SEASON (OCTOBER 1 TO APRIL 15). <br /> 4. 'STORM DRAIN INLET FILTERS PER STD, PLAN 313 SHALL BE PLACED ON ALL DRAIN INLETS AFTER <br /> COMPLETION OF PAVING AND SHALL REMAIN IN PLACE ON A YEAR ROUND BASIS. FILTERS SHALL BE <br /> REMOVED BY THE CONTRACTOR UPON ACCEPTANCE OF DEVELOPMENT IMPROVEMENTS, <br /> Oil I <br /> j. `EHE FIRST 18' BEHIND THE SIDEWALK ON LOT FRONT YARDS, THE FIRST 75 BEHIND THE SIDEWALK <br /> ON STREET SIDE YARDS AND ALL SLOPES STEEPER THAN 10:1 SHALL BE HYDROSEEDED WITH AN <br /> APPROVED SEED MIXTURE AFTER COMPLETION OF CURB, GUTTER, AND SIDEWALK AND JUST PRIOR -TO <br /> RAINY SEASON TO ALLOW MAXIMUM GROWTH OF HYDROSEEDED AREA. <br /> CONCRETE WASHOUT AREA, <br /> ®COUSE REMOVABLE <br /> CONTRACTOR J. ',ON'TRACTOR TO REMOVE ANY SEDIMENTATION DEPOSITED ON EXISTING PAVED ROADWAYS PRIOR TO <br /> FIBER ROLLS WITH WOOD STAKES COLEAVING THE SITE, IF POSSIBLE, AND IN ALL CASES WITHIN 24 HOURS. <br /> N <br /> ------- EVERY 4' DURING CONSTRUCTION REFER <br /> WASHOUT BINS OR ER TO DETAILS. CONTRACTOR <br /> (SEE DETAIL) TO RELOCATE AS NECESSARY ;ONTRACTOR TO COMPLY WITH ALL NOTES AS FOUND ON GRADING PLAN AND NOTE 6 ABOVE. <br /> 3, .'ONTRACTOR TO LIMIT ACCESS TO SITE TO ONE MAIN LOCATION AND PROVIDE A 15' WIDE BY 25' <br /> LONG AGGREGATE ENTRY ADJACENT TO EXISTING PAVED ROADWAY, AGGREGATE IS TO BE 1 MINIMUM <br /> \ND 6" THICK. CONSTRUCTION SITE ACCESS TO BE INSPECTED WEEKLY AND MAINTAINED WEEKLY. <br /> 'ONTRACTOR IS RESPONSIBLE FOR MAINTAINING EXISTING PAVED ROADWAY AT THE ENTRY CLEAR OF <br /> SOILS, CONSTRUCTION MACHINERY AND CONSTRUCTION EQUIPMENT UNLESS APPROVED BY THE CITY <br /> ........ ....... NSPECTOR. <br /> AREA RESERVED FOR WASTE BIN i,,STALL 9" DIAMETER STRAW WATTLES ALONG ALL BACK OF WALKS AND BACK OF CURBS. <br /> AND MATERIAL STORAGE. ALL MATERIALS 'CONTRACTOR TO INSTALL AND MAINTAIN CATCH BASIN FILTER SCREENS (SEE STD. PLAN 313) <br /> ki ALL CATCH BASIN INLETS SHOWN, FILTER SCREENS SHALL BECOME THE PROPERTY OF THE <br /> TO BE STORED IN LOCK BOX. ENTIRE )EVELOPER UPON ACCEPTANCE OF THE SUBDIVISION IMPROVEMENTS BY THE CITY OF LODI. <br /> STORAGE AREA TO BE WRAPPED BY MINIMUM 6" BERM. CONTRACTOR TO RIOR TO OCTOBER IST, (OR 'THREAT OF MAJOR RAIN PRIOR TO THAT DATE), CONTRACTOR SHALL. <br /> RELOCATE AS NECESSARY. PLACE "ROCK BAGS" (12"x18"± AND 15 LBS. OF 1" MAX, ROCK) IN GUTTER PANS AT 200'- <br /> 00' INTERVALS TO ISOLATE ANY SEDIMENT, SEDIMENT TO BE REMOVED WEEKLY OR SOONER, IF <br /> LARGE ACCUMULATION OCCURS OR ANOTHER STORM IS PREDICTED). <br /> JNTRACTOR TO INSPECT SITE AFTER FIRST SIGNIFICANT' RAINFALL AND MAINTAIN "STRAW WATTLES", <br /> WhERE NECESSARY AND REMOVE ACCUMULATED SILT ALONG BACK OF WALK AT LOCATIONS WHERE <br /> ,ROSION HAS OCCURRED AND SEDIMENT HAS GATHERED. <br /> ...... .... ....... <br /> ' IMPLEMENTED MEASURES SHALL BE MAINTAINED WEEKLY (OR SOONER, DEPENDING ON NEED) <br /> ThROUGHOUT THE RAINY SEASON (OCTOBER 1ST, THRU APRIL 15TH). <br /> ;'ORM WATER POLLUTION PREVENTION PLAN (SWPPP) TO BE KEPT ON SITE AT ALI- TIME. <br /> 3E,)T MANAGEMENT PRACTICES (BMP'S) SHOWN HERE ARE MINIMUM REQUIREMENTS FOR SATISFACTION <br /> OF THE NPDES SWPPP MANAGEMENT PLAN. <br /> 6, „ONTRACTOR TO GRADE AREA FOR FOR WORKERS VEHICLES. WATER AT LEAST DAILY TO RETARD <br /> SCALE. 1 30 DUST OR TAKE MORE EXTENSIVE MEASURES AS NECESSARY. <br /> T. "RASH COLLECTION AREA SHALL BE INSTALL-ED AND FENCED AS NECESSARY TO STORE ALL DEBRIS <br /> AND SECURE THE DEBRIS FROM BEING MOVED BY WIND. <br /> 16. SORTABLE RESTROOMS SHALL NOT BE LOCATED CLOSER THAN 50' FROM CATCH BASINS. <br /> CLEARING AND GRADING NOIES. <br /> 1. ALL SITE VEGETATION, EXISTING TREES, STUMPS AND ETC, SHALL BE REMOVED INCLUDING ROOTS AND <br /> 45' X 25' CONSTRUCTION-/ HAULED FROM THE SITE. <br /> 1ENTRANCE TO PE ?. GRADING OPERATIONS SHALL COMPLY WITH THE RECOMMENDATIONS CONTAINED IN THE SOILS REPORT <br /> MAINTAINED UNTIL 111A FOR THIS PROJECT BY: XXXXXXXXXXXXXXXXXXXX. AND WITH THE DUST CONTROL <br /> COMPLETION OF PROJECT REQUIREMENTS GIVEN BELOW, BUILDING PADS SHALL BE COMPACTED TO 90% R.C. MINIMUM. <br /> 4. 'ONTRACTOR SHALL REMOVE ANY IRRIGATION LINES ENCOUNTERED. LOCATION OF IRRIGATION LINES, <br /> IF ANY ARE UNKNOWN. <br /> /Z//A NO WELLS, SEPTIC TANKS OR OTHER UNDERGROUND TANKS ARE KNOWN TO EXIST ON THE SITE. <br /> A <br /> DUST CONMOL NOTES: <br /> 011 DUST CONTROL IS THE CONTRACTORS SOLE RESPONSIBILTlY WHEN WORKING ON-SITE. THE WORK <br /> T <br /> SHOWN ON THIS SHEET SHALL. BE INCLUDED IN THE BID, THE CONTRACTOR SHALL ALSO WATER <br /> IHC SITE AS AN EXTRA, WHEN REQUESTED BY THE CITY OR THE OWNER. <br /> 2. ALL MOTORS SHALL BE KEPT PROPERLY TUNED AND MAINTAINED. <br /> 0 5. EARTH MOVING ACTIVITIES SHALL CEASE IF WIND EXCEEDS 20 MPH AVERAGE OVER ONE HOUR, <br /> 4. ON-SITE VEHICLE SPEEDS SHALL BE LIMITED TO 15 MPH. <br /> 5, ALL OPERATIONS SHALL COMPLY WITH THE REQUIREMENTS OF THE SAN JOAQUIN VALLEY UNIFIED <br /> AIR POLLUTION CONTROL DISTRICT, <br /> 6, ALL AREAS WITH VEHICLE TRAFFIC SHOULD BE WATERED PERIODICALLY FOR STABILIZATION OF DUST <br /> EMMISSIONS, <br /> CONVENIENCE STATION F. STREETS ADJACENT TO THE PROJECT SITE SHOULD BE SWEPT AS NEEDED TO REMOVE SILT WHICH <br /> LOCATION-CONTRACTOR TO-N\, MAY HAVE ACCUMULATED FROM CONSTRUCTION ACTIVITIES, <br /> RELOCATE AS NECESSARY 8, THE AREA DISTURBED BY CLEARING, EARTH MOVING OR EXCAVATION ACTIVITIES SHOULD BE MINIMIZED <br /> AT ALL TIMES. <br /> ALL MATERIAL TRANSPORTED ON OR OFF-SITE SHALL EITHER BE SUFFICIENTLY WATERED OR SECURELY <br /> COVERED TO PRE/ENT EXCESSIVE AMOUNTS OF DUST. <br /> 10. WHEN CONDITIONS ARE DRY, ALL MATERIAL EXCAVATED OR GRADED SHOULD BE SUFFICIENTLY WATERED <br /> IL <br /> TO PREVENT EXCESSIVE AMOUNTS OF DUST, WATERING SHOULD OCCUR AT LEAST TWICE A DAY WITH <br /> COMPLETE COVERAGE, PREFERABLY IN THE LATE MORNING AND AFTER WORK IS COMPLETED FOR THE DAY, <br /> EP C5 <br /> STORM WAIER POLLU77ON PREVEN71ON PLAN 0 w c/lx\ <br /> WITH THE EXCEPTION OF PROPERLY DESILTED WATER FROM SITE DEWATERING, THE C, \ 0 <br /> <, 'o <br /> FOG CONTRACTOR SHALL NOT DISCHARGE ANY MATERIALS AN/OR LIQUIDS TO THE STORM 0 <br /> DRAINAGE SYSTEM. ACTIVITIES OF PARTICULAR CONCERN ARE: <br /> I F� <br /> A. CONT TE TRUCK CLEAN-CUT AREA. CITY <br /> CONTRACTOR SHALL DESIGNATE A CONCRETE <br /> INSPECTOR APPROVED BEST MANAGEMENT PRACTICES SHALL AT ALI- TIMES BE <br /> FULLY IMPLEMENTED AT AND AROUND THE CLEAN-OUT AREA. <br /> FOG A <br /> B. TACK COAT AND PRIME COAT ASPHALTS SHALL BE CAREFULLY SPRAYED AND ANY <br /> EXCESS MATERIAL SPILLED SHALL BE CLEANED UP IMMEDIATELY BY PROPER METHODS, <br /> EP <br /> ------ C. ALL EQUIPMENT REFUELING IN THE PROJECT AREA SHALL BE CAREFULLY DONE TO <br /> STOP SIGN AVOID SPILLAGE. ANY SPILLS SHALL BE CONTAINED AND CLEANED UP IMMEDIATELY c) 0 <br /> pp <br /> (TYP.) IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. ALL FUELING VEHICLES SHALL cl� 0,- <br /> LEGENO 4� <br /> BE EQUIPPED WTH SPILL CLEANUP MATERIALS AND EQUIPMENT. <br /> STATE HIGWWAY 4 D. CONTRACTOR SHALL CONTROL AND PROPERLY DISPOSE OF ALL LIQUIDS DURING <br /> SAWCUTTING ACTIVITIES. <br /> EX. WALL tN(,�r_ <br /> GENERAL <br /> MAINTENANCE HOLE ----------- <br /> 1. A CONSTRUCTION ENTRANCE SHALL BE INS"ALLED PRIOR TO COMMENCEMENT OF GRADING, LOCATION DILLON & MURPHY <br /> DRWY DRIVEWAY OF THE ENTRANCE MAY BE ADJUSTED BY THE CONTRACTOR TO FACILITATE GRADING OPERATIONS, ALL <br /> CATCH BASIN CONSTRUCTION TRAFFIC ENTERING THE PAVED AREA MUST CROSS THE CONSTRUCTION ENTRANCE, CONSUL77NG CIVIL ENGINEERS <br /> P. .E. PUBLIC UTILITY EASEMENT <br /> � i 2. CHANGES TO THIS EROSION CONTROL, PLAN TO MEET FIELD CONDITIONS SHALL BE MADE ONLY WITH ENGINEERING PLANNING - SURVEYING <br /> ,�/w RIGHT-OF-WAY APPROVAL OF, OR AT THE DIRECTION OF THE CITY ENGINEER. DURING THE RAINY SEASON, PUBLIC 847 N. CLUFF AVENUE, SUITE AZ LODI, CALIFORNIA 95240 (209) 334-6613 <br /> I" <br /> SS SANITARY SEWER ROADWAYS SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS, THE SITE SHALL BE MAINTAINED <br /> "D SO THAT A MINIMUM OF SEDIMENT LADEN RUNOFF ENTERS THE STORM DRAINAGE SYSTEM AND <br /> vV S STORM DRAIN <br /> WATER PUBLIC ROADWAY, THIS PLAN COVERS ONLY THE FIRST WINTER FOLLOWING GRADING. PLANS SHALL BE SANGUINETTI INVESTMENTS <br /> 1�l P POWER POLE RESUBMITTED FOR APPROVAL PRIOR TO SEPTEMBER 1ST OF EACH SUBSEQUENT YEAR UNTIL 'THE <br /> PROPOSED IMPROVEMENTS ARE COMPLETED. CIRCLE K FARMINGTON, CA <br /> ................ ...... <br /> .5. CONTROL MEASURES SHALL BE INSPECTED AND REPAIRED AT THE END OF' EACH WORKING DAY AND, <br /> IN ADDITION, AFTER EACH STORM. _--- EROSION CONTROL PLAN <br /> ------- SEPTEMBER, 2008 <br /> YOU DISAN JOAQUIN COUNTY, CA <br /> BEFORE G ............. <br /> CALL USA UNDERGROUND SERVICE ALER7 REV. NO. DESCRIPTION DATE SCALE; AS NOTED BENCH MARK: EL: ........... SHEET <br /> 48 HOURS PRIOR TO CONSTRUCTION, CALL .......... <br /> TOLL FREE 1-800--227-2600 DRAWN BY: SM DESCRIPTION: C5 <br /> KEEP ALL VEHICLES, EQUIPMENT, TOOLS AND OF 7 SHEETS <br /> PEOPLE 10 FEET FROM POWER LINES, IF YOUDESIGNED BY: <br /> MUST WORK WITHIN 10 FEET OF POWER LINES <br /> PLEASE CALL CITY OF LODI ELECTRICAL UTILITY CHECKED BY: JM JOB NO. <br /> DEPARTMENT. <br /> AS BUILT BY: <br /> CONTIPOt, PLAV,'w(, Oct 27, 2008 <br />