EROSION CONIROL NOIEZ-_
<br /> L ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED DURING CONSTRUCTION BY THE CONTRACTOR
<br /> PER THE EROSION AND SEDIMENT CONTROL STANDARDS AND SPECIFICATIONS LATEST REVISION,
<br /> 2. CONTRACTOR TC COMPLY WITH CLEARING AND DUST CONTROL NOTES FOUND ON GRADING PLAN,
<br /> 3. INLET FILTERS SHALL BE PLACED AROUND ALL DRAIN INLETS WHICH COULD RECEIVE DRAINAGE IN
<br /> UNPAVED AND PAVED AREAS DURING THE WET SEASON (OCTOBER 1 TO APRIL 15).
<br /> 4. 'STORM DRAIN INLET FILTERS PER STD, PLAN 313 SHALL BE PLACED ON ALL DRAIN INLETS AFTER
<br /> COMPLETION OF PAVING AND SHALL REMAIN IN PLACE ON A YEAR ROUND BASIS. FILTERS SHALL BE
<br /> REMOVED BY THE CONTRACTOR UPON ACCEPTANCE OF DEVELOPMENT IMPROVEMENTS,
<br /> Oil I
<br /> j. `EHE FIRST 18' BEHIND THE SIDEWALK ON LOT FRONT YARDS, THE FIRST 75 BEHIND THE SIDEWALK
<br /> ON STREET SIDE YARDS AND ALL SLOPES STEEPER THAN 10:1 SHALL BE HYDROSEEDED WITH AN
<br /> APPROVED SEED MIXTURE AFTER COMPLETION OF CURB, GUTTER, AND SIDEWALK AND JUST PRIOR -TO
<br /> RAINY SEASON TO ALLOW MAXIMUM GROWTH OF HYDROSEEDED AREA.
<br /> CONCRETE WASHOUT AREA,
<br /> ®COUSE REMOVABLE
<br /> CONTRACTOR J. ',ON'TRACTOR TO REMOVE ANY SEDIMENTATION DEPOSITED ON EXISTING PAVED ROADWAYS PRIOR TO
<br /> FIBER ROLLS WITH WOOD STAKES COLEAVING THE SITE, IF POSSIBLE, AND IN ALL CASES WITHIN 24 HOURS.
<br /> N
<br /> ------- EVERY 4' DURING CONSTRUCTION REFER
<br /> WASHOUT BINS OR ER TO DETAILS. CONTRACTOR
<br /> (SEE DETAIL) TO RELOCATE AS NECESSARY ;ONTRACTOR TO COMPLY WITH ALL NOTES AS FOUND ON GRADING PLAN AND NOTE 6 ABOVE.
<br /> 3, .'ONTRACTOR TO LIMIT ACCESS TO SITE TO ONE MAIN LOCATION AND PROVIDE A 15' WIDE BY 25'
<br /> LONG AGGREGATE ENTRY ADJACENT TO EXISTING PAVED ROADWAY, AGGREGATE IS TO BE 1 MINIMUM
<br /> \ND 6" THICK. CONSTRUCTION SITE ACCESS TO BE INSPECTED WEEKLY AND MAINTAINED WEEKLY.
<br /> 'ONTRACTOR IS RESPONSIBLE FOR MAINTAINING EXISTING PAVED ROADWAY AT THE ENTRY CLEAR OF
<br /> SOILS, CONSTRUCTION MACHINERY AND CONSTRUCTION EQUIPMENT UNLESS APPROVED BY THE CITY
<br /> ........ ....... NSPECTOR.
<br /> AREA RESERVED FOR WASTE BIN i,,STALL 9" DIAMETER STRAW WATTLES ALONG ALL BACK OF WALKS AND BACK OF CURBS.
<br /> AND MATERIAL STORAGE. ALL MATERIALS 'CONTRACTOR TO INSTALL AND MAINTAIN CATCH BASIN FILTER SCREENS (SEE STD. PLAN 313)
<br /> ki ALL CATCH BASIN INLETS SHOWN, FILTER SCREENS SHALL BECOME THE PROPERTY OF THE
<br /> TO BE STORED IN LOCK BOX. ENTIRE )EVELOPER UPON ACCEPTANCE OF THE SUBDIVISION IMPROVEMENTS BY THE CITY OF LODI.
<br /> STORAGE AREA TO BE WRAPPED BY MINIMUM 6" BERM. CONTRACTOR TO RIOR TO OCTOBER IST, (OR 'THREAT OF MAJOR RAIN PRIOR TO THAT DATE), CONTRACTOR SHALL.
<br /> RELOCATE AS NECESSARY. PLACE "ROCK BAGS" (12"x18"± AND 15 LBS. OF 1" MAX, ROCK) IN GUTTER PANS AT 200'-
<br /> 00' INTERVALS TO ISOLATE ANY SEDIMENT, SEDIMENT TO BE REMOVED WEEKLY OR SOONER, IF
<br /> LARGE ACCUMULATION OCCURS OR ANOTHER STORM IS PREDICTED).
<br /> JNTRACTOR TO INSPECT SITE AFTER FIRST SIGNIFICANT' RAINFALL AND MAINTAIN "STRAW WATTLES",
<br /> WhERE NECESSARY AND REMOVE ACCUMULATED SILT ALONG BACK OF WALK AT LOCATIONS WHERE
<br /> ,ROSION HAS OCCURRED AND SEDIMENT HAS GATHERED.
<br /> ...... .... .......
<br /> ' IMPLEMENTED MEASURES SHALL BE MAINTAINED WEEKLY (OR SOONER, DEPENDING ON NEED)
<br /> ThROUGHOUT THE RAINY SEASON (OCTOBER 1ST, THRU APRIL 15TH).
<br /> ;'ORM WATER POLLUTION PREVENTION PLAN (SWPPP) TO BE KEPT ON SITE AT ALI- TIME.
<br /> 3E,)T MANAGEMENT PRACTICES (BMP'S) SHOWN HERE ARE MINIMUM REQUIREMENTS FOR SATISFACTION
<br /> OF THE NPDES SWPPP MANAGEMENT PLAN.
<br /> 6, „ONTRACTOR TO GRADE AREA FOR FOR WORKERS VEHICLES. WATER AT LEAST DAILY TO RETARD
<br /> SCALE. 1 30 DUST OR TAKE MORE EXTENSIVE MEASURES AS NECESSARY.
<br /> T. "RASH COLLECTION AREA SHALL BE INSTALL-ED AND FENCED AS NECESSARY TO STORE ALL DEBRIS
<br /> AND SECURE THE DEBRIS FROM BEING MOVED BY WIND.
<br /> 16. SORTABLE RESTROOMS SHALL NOT BE LOCATED CLOSER THAN 50' FROM CATCH BASINS.
<br /> CLEARING AND GRADING NOIES.
<br /> 1. ALL SITE VEGETATION, EXISTING TREES, STUMPS AND ETC, SHALL BE REMOVED INCLUDING ROOTS AND
<br /> 45' X 25' CONSTRUCTION-/ HAULED FROM THE SITE.
<br /> 1ENTRANCE TO PE ?. GRADING OPERATIONS SHALL COMPLY WITH THE RECOMMENDATIONS CONTAINED IN THE SOILS REPORT
<br /> MAINTAINED UNTIL 111A FOR THIS PROJECT BY: XXXXXXXXXXXXXXXXXXXX. AND WITH THE DUST CONTROL
<br /> COMPLETION OF PROJECT REQUIREMENTS GIVEN BELOW, BUILDING PADS SHALL BE COMPACTED TO 90% R.C. MINIMUM.
<br /> 4. 'ONTRACTOR SHALL REMOVE ANY IRRIGATION LINES ENCOUNTERED. LOCATION OF IRRIGATION LINES,
<br /> IF ANY ARE UNKNOWN.
<br /> /Z//A NO WELLS, SEPTIC TANKS OR OTHER UNDERGROUND TANKS ARE KNOWN TO EXIST ON THE SITE.
<br /> A
<br /> DUST CONMOL NOTES:
<br /> 011 DUST CONTROL IS THE CONTRACTORS SOLE RESPONSIBILTlY WHEN WORKING ON-SITE. THE WORK
<br /> T
<br /> SHOWN ON THIS SHEET SHALL. BE INCLUDED IN THE BID, THE CONTRACTOR SHALL ALSO WATER
<br /> IHC SITE AS AN EXTRA, WHEN REQUESTED BY THE CITY OR THE OWNER.
<br /> 2. ALL MOTORS SHALL BE KEPT PROPERLY TUNED AND MAINTAINED.
<br /> 0 5. EARTH MOVING ACTIVITIES SHALL CEASE IF WIND EXCEEDS 20 MPH AVERAGE OVER ONE HOUR,
<br /> 4. ON-SITE VEHICLE SPEEDS SHALL BE LIMITED TO 15 MPH.
<br /> 5, ALL OPERATIONS SHALL COMPLY WITH THE REQUIREMENTS OF THE SAN JOAQUIN VALLEY UNIFIED
<br /> AIR POLLUTION CONTROL DISTRICT,
<br /> 6, ALL AREAS WITH VEHICLE TRAFFIC SHOULD BE WATERED PERIODICALLY FOR STABILIZATION OF DUST
<br /> EMMISSIONS,
<br /> CONVENIENCE STATION F. STREETS ADJACENT TO THE PROJECT SITE SHOULD BE SWEPT AS NEEDED TO REMOVE SILT WHICH
<br /> LOCATION-CONTRACTOR TO-N\, MAY HAVE ACCUMULATED FROM CONSTRUCTION ACTIVITIES,
<br /> RELOCATE AS NECESSARY 8, THE AREA DISTURBED BY CLEARING, EARTH MOVING OR EXCAVATION ACTIVITIES SHOULD BE MINIMIZED
<br /> AT ALL TIMES.
<br /> ALL MATERIAL TRANSPORTED ON OR OFF-SITE SHALL EITHER BE SUFFICIENTLY WATERED OR SECURELY
<br /> COVERED TO PRE/ENT EXCESSIVE AMOUNTS OF DUST.
<br /> 10. WHEN CONDITIONS ARE DRY, ALL MATERIAL EXCAVATED OR GRADED SHOULD BE SUFFICIENTLY WATERED
<br /> IL
<br /> TO PREVENT EXCESSIVE AMOUNTS OF DUST, WATERING SHOULD OCCUR AT LEAST TWICE A DAY WITH
<br /> COMPLETE COVERAGE, PREFERABLY IN THE LATE MORNING AND AFTER WORK IS COMPLETED FOR THE DAY,
<br /> EP C5
<br /> STORM WAIER POLLU77ON PREVEN71ON PLAN 0 w c/lx\
<br /> WITH THE EXCEPTION OF PROPERLY DESILTED WATER FROM SITE DEWATERING, THE C, \ 0
<br /> <, 'o
<br /> FOG CONTRACTOR SHALL NOT DISCHARGE ANY MATERIALS AN/OR LIQUIDS TO THE STORM 0
<br /> DRAINAGE SYSTEM. ACTIVITIES OF PARTICULAR CONCERN ARE:
<br /> I F�
<br /> A. CONT TE TRUCK CLEAN-CUT AREA. CITY
<br /> CONTRACTOR SHALL DESIGNATE A CONCRETE
<br /> INSPECTOR APPROVED BEST MANAGEMENT PRACTICES SHALL AT ALI- TIMES BE
<br /> FULLY IMPLEMENTED AT AND AROUND THE CLEAN-OUT AREA.
<br /> FOG A
<br /> B. TACK COAT AND PRIME COAT ASPHALTS SHALL BE CAREFULLY SPRAYED AND ANY
<br /> EXCESS MATERIAL SPILLED SHALL BE CLEANED UP IMMEDIATELY BY PROPER METHODS,
<br /> EP
<br /> ------ C. ALL EQUIPMENT REFUELING IN THE PROJECT AREA SHALL BE CAREFULLY DONE TO
<br /> STOP SIGN AVOID SPILLAGE. ANY SPILLS SHALL BE CONTAINED AND CLEANED UP IMMEDIATELY c) 0
<br /> pp
<br /> (TYP.) IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. ALL FUELING VEHICLES SHALL cl� 0,-
<br /> LEGENO 4�
<br /> BE EQUIPPED WTH SPILL CLEANUP MATERIALS AND EQUIPMENT.
<br /> STATE HIGWWAY 4 D. CONTRACTOR SHALL CONTROL AND PROPERLY DISPOSE OF ALL LIQUIDS DURING
<br /> SAWCUTTING ACTIVITIES.
<br /> EX. WALL tN(,�r_
<br /> GENERAL
<br /> MAINTENANCE HOLE -----------
<br /> 1. A CONSTRUCTION ENTRANCE SHALL BE INS"ALLED PRIOR TO COMMENCEMENT OF GRADING, LOCATION DILLON & MURPHY
<br /> DRWY DRIVEWAY OF THE ENTRANCE MAY BE ADJUSTED BY THE CONTRACTOR TO FACILITATE GRADING OPERATIONS, ALL
<br /> CATCH BASIN CONSTRUCTION TRAFFIC ENTERING THE PAVED AREA MUST CROSS THE CONSTRUCTION ENTRANCE, CONSUL77NG CIVIL ENGINEERS
<br /> P. .E. PUBLIC UTILITY EASEMENT
<br /> � i 2. CHANGES TO THIS EROSION CONTROL, PLAN TO MEET FIELD CONDITIONS SHALL BE MADE ONLY WITH ENGINEERING PLANNING - SURVEYING
<br /> ,�/w RIGHT-OF-WAY APPROVAL OF, OR AT THE DIRECTION OF THE CITY ENGINEER. DURING THE RAINY SEASON, PUBLIC 847 N. CLUFF AVENUE, SUITE AZ LODI, CALIFORNIA 95240 (209) 334-6613
<br /> I"
<br /> SS SANITARY SEWER ROADWAYS SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS, THE SITE SHALL BE MAINTAINED
<br /> "D SO THAT A MINIMUM OF SEDIMENT LADEN RUNOFF ENTERS THE STORM DRAINAGE SYSTEM AND
<br /> vV S STORM DRAIN
<br /> WATER PUBLIC ROADWAY, THIS PLAN COVERS ONLY THE FIRST WINTER FOLLOWING GRADING. PLANS SHALL BE SANGUINETTI INVESTMENTS
<br /> 1�l P POWER POLE RESUBMITTED FOR APPROVAL PRIOR TO SEPTEMBER 1ST OF EACH SUBSEQUENT YEAR UNTIL 'THE
<br /> PROPOSED IMPROVEMENTS ARE COMPLETED. CIRCLE K FARMINGTON, CA
<br /> ................ ......
<br /> .5. CONTROL MEASURES SHALL BE INSPECTED AND REPAIRED AT THE END OF' EACH WORKING DAY AND,
<br /> IN ADDITION, AFTER EACH STORM. _--- EROSION CONTROL PLAN
<br /> ------- SEPTEMBER, 2008
<br /> YOU DISAN JOAQUIN COUNTY, CA
<br /> BEFORE G .............
<br /> CALL USA UNDERGROUND SERVICE ALER7 REV. NO. DESCRIPTION DATE SCALE; AS NOTED BENCH MARK: EL: ........... SHEET
<br /> 48 HOURS PRIOR TO CONSTRUCTION, CALL ..........
<br /> TOLL FREE 1-800--227-2600 DRAWN BY: SM DESCRIPTION: C5
<br /> KEEP ALL VEHICLES, EQUIPMENT, TOOLS AND OF 7 SHEETS
<br /> PEOPLE 10 FEET FROM POWER LINES, IF YOUDESIGNED BY:
<br /> MUST WORK WITHIN 10 FEET OF POWER LINES
<br /> PLEASE CALL CITY OF LODI ELECTRICAL UTILITY CHECKED BY: JM JOB NO.
<br /> DEPARTMENT.
<br /> AS BUILT BY:
<br /> CONTIPOt, PLAV,'w(, Oct 27, 2008