Laserfiche WebLink
SAN joinum COMMUNETY, DEVELOPMENTS O)EPARTMENT <br /> C! !- SITE APPROVAL <br /> FILE N1lJ1MSEM7 If 41 n f► ,. <br /> PERFORMANCE STANDARDS <br /> (Attach additional sheets as necessary) <br /> See Chapter 9.1025 of the De=Loarnent Title for Performance Standard Regulations <br /> Air Quality <br /> Describe air pollutants that may result from the project including during construction: <br /> The project will produce minor amounts of dust during the grading of the lot and the digging of the footings,water <br /> will be used to mitigate any dust problems. <br /> F� <br /> Noise <br /> Describe on-site sources of noise or vibration that may result from the proposedproject: <br /> During construction there will be some noise during the day light hours only. No excess noise is anticipated from <br /> the construction of from the operation of the business after opening. <br /> Describe any machinery, equipment, or transportation noise that may result from the proposed project: <br /> The project will require the use of the following heavy equipment: motor grader,steel wheel compactor,backhoe,dump trucks and paving <br /> equipment. <br /> Light and Glare <br /> Describe any on-site sources of light and/or glare that may result from the proposed project: <br /> i <br /> The outside lighting will be installed in such a way as to keep the light focused on the property.The lights will be down/type lighting and <br /> will not cause any light problems with neighbors. bb <br /> E <br /> Odor <br /> Describe any on-site source of odor that may result from the proposed project: <br /> During construction, there may be some odor from the equipment exhaust but this will be minor. The operation of the Shell Station <br /> and Fast Food should not cause any order problems. <br /> Page 5 of 6 <br />