My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082985_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14800
>
2600 - Land Use Program
>
SR0082985_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:04:15 AM
Creation date
12/21/2020 3:02:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0082985
PE
2602
STREET_NUMBER
14800
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20924023
ENTERED_DATE
12/8/2020 12:00:00 AM
SITE_LOCATION
14800 W SCHULTE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 – Executive Summary <br />Draft Environmental Impact Report February 2021 <br />14800 W. Schulte Road Logistics Center 1-2 <br />1.4 Project Objectives <br />The primary objectives sought by the Project are as follows: <br />• Objective 1: Develop a jobs-producing and tax-generating land use near transportation corridors within San <br />Joaquin County that provides diverse economic opportunities for those residing and wishing to invest within <br />southern San Joaquin County. <br />• Objective 2: Concentrate non-residential uses near existing roadways, highways, and freeways in an effort <br />to isolate and reduce any potential environmental impacts related to truck traffic congestion, air emissions, <br />and industrial noise to the greatest extent feasible. <br />• Objective 3: Develop a fiscally sound and employment generating land use that maximizes utilization of an <br />underutilized, previously developed industrially zoned parcel. <br />• Objective 4: Fulfill the existing and growing demand for logistics and warehouse uses in the region. <br />• Objective 5: Construct high-quality industrial development in an appropriate location, consistent with <br />existing surrounding industrial land uses in the vicinity. <br />1.5 Summary of Environmental Impacts and <br />Mitigation Measures <br />Table 1-1, Summary of Environmental Impacts and Mitigation Measures, provides an overview of the impact <br />analysis and a summary of environmental impacts (before and after mitigation) resulting from implementation of <br />the Project, pursuant to CEQA Guidelines Section 15123(b)(1). For a more detailed discussion of Project impacts, <br />please see the sections within Chapter 4, Environmental Analysis, of this EIR. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.