Laserfiche WebLink
1 – Executive Summary <br />Draft Environmental Impact Report February 2021 <br />14800 W. Schulte Road Logistics Center 1-4 <br />Table 1-1. Summary of Environmental Impacts and Mitigation Measures <br />Environmental Topic Impact? Mitigation Measure(s) <br />Level of Significance <br />After Mitigation <br />MM-AQ-2: Idling Restriction. The Project shall minimize idling time of <br />all vehicles and equipment to the extent feasible; idling for periods of <br />greater than 5 minutes shall be prohibited. Signage shall be posted <br />at truck parking spots, entrances, and truck bays advising that idling <br />time shall not exceed 5 minutes per idling location. To the extent <br />feasible, the tenant shall restrict idling emission from trucks by using <br />auxiliary power units and electrification. <br />MM-AQ-3: Forklifts and Yard-Trucks. During operation, the Project <br />shall require that all forklifts are powered by electricity or other <br />zero-emission technology; if electric is not available or feasible, <br />propane is acceptable. All yard trucks shall meet Tier 4 Interim <br />standards or better or utilize zero-emission technology (electric, <br />fuel-cell, etc.). <br />Would the Project result in a <br />cumulatively considerable net <br />increase of any criteria pollutant for <br />which the Project region is non- <br />attainment under an applicable <br />federal or state ambient air quality <br />standard? <br />Potentially <br />Significant <br />MM-AQ-1 through MM-AQ-3. Significant and <br />Unavoidable <br />Would the Project expose sensitive <br />receptors to substantial pollutant <br />concentrations? <br />Potentially <br />Significant <br />MM-AQ-3 Less-than-Significant <br />Impact <br />Would the Project result in other <br />emissions (such as those leading to <br />odors) adversely affecting a <br />substantial number of people? <br />Less-than- <br />Significant <br />None required. Less-than-Significant <br />Impact <br />Would the Project have a cumulative <br />effect on air quality resources? <br />Potentially <br />Significant <br />MM-AQ-1 through MM-AQ-3 Significant and <br />Unavoidable <br />Biological Resources <br />Would the Project have a substantial <br />adverse effect, either directly or <br />through habitat modifications, on <br />Potentially <br />Significant <br />MM-BIO-1: Avoid and Minimize Impacts to Burrowing Owl. <br />Measures identified in the Incidental Take Minimization Measures <br />(ITMM) document (SJCOG 2020) shall be implemented to ensure <br />Less-than-Significant <br />Impact