My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082985_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14800
>
2600 - Land Use Program
>
SR0082985_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:04:15 AM
Creation date
12/21/2020 3:02:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0082985
PE
2602
STREET_NUMBER
14800
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20924023
ENTERED_DATE
12/8/2020 12:00:00 AM
SITE_LOCATION
14800 W SCHULTE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 – Executive Summary <br />Draft Environmental Impact Report February 2021 <br />14800 W. Schulte Road Logistics Center 1-4 <br />Table 1-1. Summary of Environmental Impacts and Mitigation Measures <br />Environmental Topic Impact? Mitigation Measure(s) <br />Level of Significance <br />After Mitigation <br />MM-AQ-2: Idling Restriction. The Project shall minimize idling time of <br />all vehicles and equipment to the extent feasible; idling for periods of <br />greater than 5 minutes shall be prohibited. Signage shall be posted <br />at truck parking spots, entrances, and truck bays advising that idling <br />time shall not exceed 5 minutes per idling location. To the extent <br />feasible, the tenant shall restrict idling emission from trucks by using <br />auxiliary power units and electrification. <br />MM-AQ-3: Forklifts and Yard-Trucks. During operation, the Project <br />shall require that all forklifts are powered by electricity or other <br />zero-emission technology; if electric is not available or feasible, <br />propane is acceptable. All yard trucks shall meet Tier 4 Interim <br />standards or better or utilize zero-emission technology (electric, <br />fuel-cell, etc.). <br />Would the Project result in a <br />cumulatively considerable net <br />increase of any criteria pollutant for <br />which the Project region is non- <br />attainment under an applicable <br />federal or state ambient air quality <br />standard? <br />Potentially <br />Significant <br />MM-AQ-1 through MM-AQ-3. Significant and <br />Unavoidable <br />Would the Project expose sensitive <br />receptors to substantial pollutant <br />concentrations? <br />Potentially <br />Significant <br />MM-AQ-3 Less-than-Significant <br />Impact <br />Would the Project result in other <br />emissions (such as those leading to <br />odors) adversely affecting a <br />substantial number of people? <br />Less-than- <br />Significant <br />None required. Less-than-Significant <br />Impact <br />Would the Project have a cumulative <br />effect on air quality resources? <br />Potentially <br />Significant <br />MM-AQ-1 through MM-AQ-3 Significant and <br />Unavoidable <br />Biological Resources <br />Would the Project have a substantial <br />adverse effect, either directly or <br />through habitat modifications, on <br />Potentially <br />Significant <br />MM-BIO-1: Avoid and Minimize Impacts to Burrowing Owl. <br />Measures identified in the Incidental Take Minimization Measures <br />(ITMM) document (SJCOG 2020) shall be implemented to ensure <br />Less-than-Significant <br />Impact
The URL can be used to link to this page
Your browser does not support the video tag.