Laserfiche WebLink
1 – Executive Summary <br />Draft Environmental Impact Report February 2021 <br />14800 W. Schulte Road Logistics Center 1-16 <br />Table 1-1. Summary of Environmental Impacts and Mitigation Measures <br />Environmental Topic Impact? Mitigation Measure(s) <br />Level of Significance <br />After Mitigation <br />Water <br />Would the Project have sufficient <br />water supplies available to serve the <br />Project and reasonably foreseeable <br />future development during normal, <br />dry, and multiple dry years? <br /> None required. Less-than-Significant <br />Impact <br />Would the Project substantially <br />decrease groundwater supplies or <br />interfere substantially with <br />groundwater recharge such that the <br />Project may impede sustainable <br />groundwater management of the <br />basin? <br /> None required. Less-than-Significant <br />Impact <br />Would the Project conflict with or <br />obstruct implementation of a water <br />quality control plan or sustainable <br />groundwater management plan? <br /> None required. Less-than-Significant <br />Impact <br />Would the Project have a cumulative <br />effect on hydrology or water quality <br />resources? <br /> None required. Less-than-Significant <br />Impact <br /> <br />