My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082985_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14800
>
2600 - Land Use Program
>
SR0082985_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:04:15 AM
Creation date
12/21/2020 3:02:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0082985
PE
2602
STREET_NUMBER
14800
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20924023
ENTERED_DATE
12/8/2020 12:00:00 AM
SITE_LOCATION
14800 W SCHULTE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 – Introduction <br />Draft Environmental Impact Report February 2021 <br />14800 W. Schulte Road Logistics Center 2-9 <br />Online: <br />https://www.sjgov.org/commdev/cgi-bin/cdyn.exe?grp=planning&htm=default <br />Agencies, organizations, individuals, and all other interested parties not previously contacted, or who did not <br />respond to the NOP, currently have the opportunity to comment on this Draft EIR during the public review period. <br />Written or email comments on this Draft EIR should be addressed to the following: <br />Alisa Goulart, Associate Planner <br />County of San Joaquin Community Development Department <br />1810 East Hazelton Avenue <br />Stockton, California 92505 <br />Phone: 209.468.0222 <br />Email: alisa.goulart@sjgov.org <br />Upon completion of the public review period, written responses to all substantive environmental comments will be <br />prepared and made available prior to a decision on the Project by the Community Development Director during the <br />site approval process, at which the Project, the Final EIR, and the Project’s site design will be considered for <br />approval. The comments received and the responses to those comments will be included as part of the record for <br />consideration for the Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.