Laserfiche WebLink
San Joaquin County <br /> .� Environmental Health Department DIRECTOR <br /> Donna Heran, RENS <br /> 600 East Main Street <br /> " Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> Robert McClellon, REHS <br /> Jeff Canuesco, REHS,RDI <br /> • c+ .,—� PKasey Foley, REHS <br /> Website: www.sjgov.org/ehd Linda Turkatte, REHS <br /> Phone: (209)468.3420 <br /> 3-16-12 Fax: (209) 464-0138 <br /> Ahmad Ghaderi <br /> A&S Engineering <br /> 28405 Sand Canyon Rd. <br /> Canyon Country, CA 91387 <br /> Re: Tesoro/USA #68150 13975 E. Hwy 88 Lockeford, CA 95237 SR0064416 <br /> The San Joaquin County Environmental Health Department(EHD) has reviewed the permit <br /> application for a new installation of an underground storage tank (UST) system at the above <br /> noted address. In order for this permit application review to continue, a detailed addendum and <br /> revised sheets for plans must be provided for the following deficiencies: <br /> 1 Page 4 section 1 box 4. Provide manufacturers' cut sheets the following equipment: <br /> - Equipment List, item #83 Veeder Root PLLD 848480-001 <br /> 2. Page 4 section 1 Note: Enhanced Leak Detection (ELD) must be performed prior to the <br /> final inspection. A separate permit application is required to be submitted to install <br /> ELD. <br /> 3. The site plan sheet TK1-D lists the Fire Inspector in the first sentence in #7 of the <br /> closure permit section. Remove the word "Fire" The site plan sheet TK1-D has a blank <br /> at the end of the sentence in #5 of the closure permit section. Fill in the blank with the <br /> San Joaquin County Environmental Health Department. The site plan sheet TK2-3 in the <br /> last sentence in #28 of the general notes lists the San Joaquin County Fire Department. <br /> Resubmit the plan sheet TK1-D and TK2-3 Remove the San Joaquin County Fire <br /> Department, and replace it with the San Joaquin County Environmental Health <br /> Department. Resubmit the site plan sheets TK1-D and TK2-3 with corrections. <br /> 4. The site plan sheet TK2-3 in #29 of the general notes refers to a tank monitoring system <br /> certified to meet the requirements of a tank integrity test may be substituted for the <br /> Enhanced Leak Detection (ELD) test. A certified tank monitoring system CANNOT be <br /> substituted for an ELD test. Resubmit the site plan sheet TK2-3 with #29 stating that" ..a <br /> tank integrity test SHALL NOT be substituted for the above test" <br /> 5. The site plan sheets TK3-2 and TK3-3 detail of the fill and turbine sumps does not <br /> demonstrate vapor tightness.The detail of the fill sump lid does not demonstrate a <br /> gasket for water tightness. Resubmit the site plan sheet TK3-2 with updated details <br /> demonstrating vapor tightness for the fill and turbine sumps and a gasket for water <br /> tightness of the fill sump lid. 19D & 19E in Section D of site plan sheets TK3-2 and TK3- <br /> 3 need the following description "vapor and liquid tight" The watertight lid in Section B of <br /> site plan sheets TK3-2 and TK3-3 need the additional description of"and vapor tight lid" <br />