My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
13975
>
2300 - Underground Storage Tank Program
>
PR0231622
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:41 AM
Creation date
12/23/2020 9:14:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0231622
PE
2351
FACILITY_ID
FA0000055
FACILITY_NAME
TESORO (SPEEDWAY) #68150
STREET_NUMBER
13975
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
APN
01908014
CURRENT_STATUS
01
SITE_LOCATION
13975 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1*�e ..i <br /> Tesoro/USA#68150 13975 E. Hwy 88 Lockeford, CA 95237 SR0064416 <br /> product, only black iron steel. Resubmit the site plan sheet TK2-1 specifying black iron <br /> steel pipe. <br /> 14. The site plan sheet TK2-3 in#29 of the general notes refers to a tank monitoring system <br /> certified to meet the requirements of a tank integrity test may be substituted for the <br /> Enhanced Leak Detection (ELD) test. A certified tank monitoring system cannot be <br /> substituted for an ELD test. Resubmit the site plan sheet TK2-3 without#29. <br /> 15. The site plan sheets TK3-2 and TK3-3 detail of the fill and turbine sumps does not <br /> demonstrate vapor tightness and the detail of the fill sump lid does not demonstrate a <br /> gasket for water tightness. Resubmit the site plan sheet TK3-2 with updated details <br /> demonstrating vapor tightness for the fill and turbine sumps and a gasket for water <br /> tightness of the fill sump lid. <br /> 16. The site plan sheet TK3-3 specifies#54 galvanized iron pipe for the diesel tank. <br /> Galvanized iron pipe is not allowed for diesel product, only black iron steel. Resubmit the <br /> site plan sheet TK3-3 specifying black iron steel pipe. <br /> 17. The site plan sheets TK4-1 and TK4-2 indicate that an off set dispenser frame is being <br /> used. A portion of the piping in the dispenser is not being contained by the under <br /> dispenser containment (UDC). A conversion frame may be required for the UDC. There <br /> are two that are approved. <br /> 18. The site plan sheets TK3-2 and TK5-1 indicate 87 vacuum lines for the product and the <br /> vapor recovery lines. The site plan sheet TK5-3 indicates 87 vacuum lines for the <br /> product, vapor recovery, and the vent lines. Resubmit the site plan sheets and specify if <br /> the vent and or vapor recovery lines are manifolded. Installation must be consistently <br /> specified on the site plan sheets. <br /> 19. The site plan sheet TK5-3 detail of the vent sump lid does not demonstrate vapor and <br /> water tightness. Resubmit the site plan sheet TK3-2 with updated details demonstrating <br /> vapor tightness for the fill and turbine sumps and a gasket for water tightness of the fill <br /> sump lid. <br /> 20. Tank buoyancy calculations and tank tie down information must be submitted. <br /> 21. Submit the contractor technician's training certification of for Xerxes. <br /> 22. Three copies of each updated site plan sheet must be sent to the EHD. <br /> If you have any further questions, please contact me at (209) 468-3453. <br /> Thank you, <br /> -" N <br /> Aris Cacapit, REHS <br /> Registered Environmental Health Specialist <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.