My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
13975
>
2300 - Underground Storage Tank Program
>
PR0231622
>
INSTALL_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:41 AM
Creation date
12/23/2020 9:14:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2012
RECORD_ID
PR0231622
PE
2351
FACILITY_ID
FA0000055
FACILITY_NAME
TESORO (SPEEDWAY) #68150
STREET_NUMBER
13975
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
APN
01908014
CURRENT_STATUS
01
SITE_LOCATION
13975 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V � <br /> 2. TO BE SUBMITTED PRIOR TO THE FINAL INSPECTION: <br /> ❑ Complete to scale As-Built Plans <br /> ❑ Complete Monitoring and Response Plan <br /> ❑ UPCF Underground Storage Tanks - Installation Certificate of Compliance (one <br /> form per tank) <br /> ❑ Completed Underground Storage Tank Certification of Financial Responsibility <br /> form along with any required attachments <br /> ❑ Passing Line Leak Detector Test Results <br /> ❑ Passing Line Tightness Test Results (Required if the UST system does not satisfy <br /> the California Code of Regulations 2636(g) for automatic pump shut-off.) <br /> ❑ Passing Enhanced Leak Detection Results <br /> D. INSPECTIONS: <br /> Note: A representative from the San Joaquin County Environmental Health Department <br /> must witness all activities described below. <br /> ❑ Tank holiday test (for fiberglass-coated steel tanks) performed prior to <br /> installation in excavation <br /> ❑ Inspection of tank vacuum gauge (if applicable) prior to placement in excavation <br /> ❑ Tank soap test (for fiberglass tanks) performed prior to installation in excavation <br /> ❑ Verification of tank set and anchorage in excavation <br /> ❑ Primary piping including product piping, vapor recovery and vent line piping <br /> soap and pressure test <br /> ❑ Secondary piping including product piping, vapor recovery and vent line piping <br /> soap and pressure test <br /> ❑ 24-Hour secondary containment lake test on sumps and under-dispenser <br /> containment <br /> ❑ Piping Slope & cathodic protection prior to covering <br /> ❑ Overfill performance test <br /> ❑ Prior to receiving fuel, a complete functional test of tank and piping monitoring <br /> system(s) including overfill prevention <br /> ❑ Final inspection and demonstration of automatic shut down (if applicable). <br /> Revised 8/1/11 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.