Laserfiche WebLink
1 1 2 $I 3 4 5 sI 6 7 °(8 9 1 10 <br /> DIRECT BURIAL COATING SELECTIONS LEGEND: DETAIL LEGEND: <br /> MAIN UNE COATING FBE(E-35.4) —GT— GAS TRANSMISSION LINE(PROPOSED) —x— FENCE GAS LINE MARKER(OTHER) WATER VALVE ---------= PROPOSED GAS TRANSMISSION LINE <br /> MINOR REPAIRS LIQUID EPDXY(E-35.3) —GT(T)— GAS TRANSMISSION LINE(TO BE TESTED) WALLTYPE _____ <br /> EXISTING GAS TRANSMISSION LINE <br /> TIE-IN WELDS LIQUID EPDXY(E-35.1) _ I'I INSULATION1OINT ® CABLE TV BOX <br /> —GT— GAS TRANSMISSION LINE(EXISTING) WALL <br /> GIRTH WELDS LIQUID EPDXY(E-35.1) �— BARRIER ® PRESSURE CONTROL FITTING 0T TELECOMM BOX <br /> BUTT WELDED FITTINGS LIQUID EPDXY(E-35.1) —GD— GAS DISTRIBUTION LINE(EXISTING) TEMPORARY GAS TRANSMISSION LINE <br /> E VALVE ASSEMBLIES LIQUID EPDXY(E-35.7),WAXTAPE(E-35.7) —GS— GAS SERVICE LINE(EXISTING) TEMPORARY BARRIER(TYPE K) �G GAS BOX TELECOMM VAULT (OWNED BY PG&E) <br /> ® E <br /> SHORT SEGMENTS OF PIPE LIQUID EPDXY(E-35.1) ---GT--- GAS TRANSMISSION LINE(RETIRED) GUARDRAIL GAS HIGH PRESSURE REGULATOR ® STREET LIGHT BOX _____ TEMPORARY GAS TRANSMISSION LINE <br /> AIR-TO-SOIL TRANSITIONS LIQUID EPDXY/PSX 700(E-35.8) _ TOE OF SLOPE (OWNED BY OTHERS) <br /> --GD--- GAS DISTRIBUTION LINE(RETIRED) �M GAS METER © TREE <br /> PRESSURE CONTROL FITTINGS LIgUID EPDXY(E-35.71,WA%TAPE E-35.7) _ -- --- TOP OF SLOPE ____= RETIRED GAS TRANSMISSION LINE <br /> --GS--- GAS SERVICE LINE(RETIRED) <br /> NG TRANSITIONS LIgUID EPDXY(E-35.3) OWNER rEP ® GAS DISTRICT REGULATOR (9) ANODE <br /> EDGE OF PAVEMENT _ - GAS TRANSMISSION LINE <br /> BORED COATING SELECTIONS ........... FOREIGN GAS LINE FC GQ PG&E GAS MANHOLE ❑A DEEPWELLANODE """"""""" (TO BE REMOVED) <br /> MAIN, COATING ARO APPLIED OVER FBE(E-35.4) —1T— JOINT TRENCH r FACE OF CURB COMPUTER AUTOMATED <br /> MINOR REPAIRS LIQUID EPDXIES E-35.2) —ET— ELECTRIC TRANSMISSION LINE r BW ® GAS VAULT CATS TEST STATION ----- CUT LINE(TO BE REMOVED) <br /> TIE-IN WELDS I LIQUID EPDXIES(E-35.2) BACK OF WALK ® GAS VENT CCT AC COUPON TEST STATION <br /> —ED— ELECTRIC DISTRIBUTION LINE EXISTING GAS DISTRIBUTION LINE <br /> NOTES: - - - - UDASHED NPAVED <br /> MARKINGS =____ <br /> l REFERENCE CONSTRUCTION NOTE 9,COATING RE0U10.EMENIS. —ES— ELECTRIC SERVICE LINE GAS VALVE C75 COUPON TEST STATION <br /> —ETOH— ELECTRIC TRANSMISSION OVERHEAD UNPAVED ROAD ----- <br /> RAILROAD <br /> PG&E ELECTRIC MANHOLE ELECTROLYSIS TEST STATION - - - PROPOSED GAS DISTRIBUTION LINE <br /> INTERNAL CORROSION(IC) —EDOH— ELECTRIC DISTRIBUTION OVERHEAD <br /> DESIGN&CONSTRUCTION REVIEW ®—T— TELEPHONE LINE ELECTRIC VAULT ® POLE-MOUNTED RECTIFIER 714IRV4Wq TOP OF GRADE <br /> IC THREAT <br /> YES NO —FO— FIBER OPTIC LINE ACCESS ROAD • UTILITY POLE(ELECTRIC) DOM DCI MITIGATION CABINET GAS VALVE <br /> D (PER TD-4810P-16) N/A N/A —TV— CABLE TV LINE µE"H{-;;� LAYDOWN/STAGING/ UTIUTY POLE(OTHER) POTHOLE p <br /> —SD— STORM DRAIN LINE -��T.p CONSTRUCTION IMPACT AREA ' PIPE END CUT(SIDE) <br /> IC REVIEW COMPLETED By LAN ID DATE O JOINT POLE � CITY/COUNTY MONUMENT <br /> (CORROSION ENGINEER OR DESIGNATE) —55— SEWER LINE EXCAVATION/BELL HOLE ® PIPE END CUT <br /> —W— WATERLINE ® EXISTING ELECTRIC TOWER MONUMENT,SEE DESCRIPTION <br /> CORROSIONE AND <br /> GINEERING ATREVIEWED SURVEY CONTROLPOINT FLOW FLOW ARROW <br /> THIS DESIGN AND INCORPORATED ANY —LINK— UNKNOWN UTILITIES O SAFETY 20NE LIMITS <br /> NECESSARY IC DESIGN AND CONSTRUCTION ■ STORM DRAIN INLET <br /> CONSIDERATIONS.DOCUMENTATION OF N/A N/A C=--=7 CENTERLINE TIE-IN WELD <br /> CASING 4 <br /> THE REVIEW AND ACTIONS TAKEN ARE IN ENVIRONMENTALLY © UTILITY MANHOLE <br /> THE JOB PACKAGE AND INCORPORATED IN ............... PROPERTY BOUNDARY SENSITIVE AREAS 25 MATERIAL OF RECORD ASSET <br /> THIS DESIGN, ———- PG&E EASEMENT ® WATER METER <br /> EDRS ROUTING NUMBER: N/A — — TEMPORARY EASEMENT <br /> 1G BILL OF MATERIALS ASSET <br /> —•r R/W FOREIGN RIGHT-OF-WAV <br /> INSTALLATION TESTED OR INSPECTED AND <br /> NOTED ON DRAWING. ............... CALTRANS RIGHT-0F-WAY <br /> ALL CORROSION LEVELS SATISFACTORY PER <br /> PG&E GAS UTILITY STANDARD TD-41815. <br /> C QUALIFIED EMPLOYEE DATE Acronym Definition Acronym Definition Acronym Definition Acronym Definition Acronym Definition C <br /> CORROSION MECHANIC'S SIGNATURE IS (E) Existing DEG Degree HFW High Frequency Weld PKWY Parkway TEMP Temporary <br /> REQUIRED WHEN A CPA BOUNDARY IS IN Proposed DET Detail HPR High Pressure Regulator PL Plastic TG Top of Grade <br /> WITHIN THE SCOPE OFTHE PROJECT. AB Aggregate Base DFM Distribution Feeder Main HWY Highway PLC Programmable Logic Controllers TT Top Tap <br /> ABN Abandon DI Drainage Inlet 10 Inside Diameter PRUPF Procedure for the Resolution of TSP Transmission System Planning <br /> AC Asphalt Concrete DIA Diameter ILI In-Une Inspection Unknown Pipeline Features TYP Typical <br /> API American Petroleum Institute DIST Distribution INV Invert PSI Pounds per Square Inch UG Underground <br /> APN Assessor's Parcel Number DPV Damage Prevention Volume IRR Irrigation PV Plug Valve USA Underground Service Alert <br /> APPROX Approximate DR Distribution Regulator JN Job Number PVMT Pavement UT Ultra-Sonic Test <br /> AVE Avenue DREG District Regulator JP Joint Pole QTY Quantity V Valve <br /> ARC Abrasion Resistant Coating DSAW Double Submerged Arc-Welded JT Joint Trench R Radius VIF Verify in Field <br /> ASME American Society of Mechanical Engineers DWA Deep Well Anode L Line Number RCP Reinforced Concrete Pipe VOL Volume <br /> ASTM American Society for Testing Materials DWY Driveway LAT Latitude RD Road W Water <br /> BBCL Bell Bell Chill Ring E East LN Lane RDWY Roadway WT Wall Thickness <br /> BC Begin Curve EASE Easement LNG Liquid Natural Gas REG Regulator WV Water Valve <br /> BD Blowdown EC End Curve LOC Location REL Relocate W/ With <br /> BEG Begin EL Elbow LONG Longitude REPL Replace W/O Without <br /> BKF Backfill ELECT Electric LT Left REV Revision WP Work Procedure <br /> BLDG Building ELEV Elevation M Monitor RR Railroad <br /> BLVD Boulevard EM Electronic Marker MAOP Maximum Allowable Operating Pressure RT Right <br /> BM Bench Mark EMS Engineering Material Specification MAX Maximum RTE Route <br /> B BMP Best Management Practice ENGR Engineer MH Manhole R/W Right of Way B <br /> BOM Bill of Materials EP Edge of Pavement MIN Minimum S South <br /> BR Bridge EQ Equation MISC Miscellaneous SAWN Submerged Arc-Welded Helical <br /> BTU British Thermal Units ERW Electric Resistance Welded MLV Main Line Valve SAWL Submerged Arc-Welded Longitudinal <br /> BV Ball Valve ESA Environmentally Sensitive Area MOI Method of Installation SCADA Supervisory Control and Data Acquisition <br /> BW Back of Walk ETS Electrolysis Test Station MON Monument 50 Storm Drain <br /> CATS Computer Automated Test Station ETW Edge of Traveled Way MOP Maximum Operating Pressure SG Subgrade <br /> CCV Corrosion Control Volume F Filter MP Mile Point SHT Sheet <br /> CI Cast Iron F&C Frame and Cover MSP Maximum Stopping Pressure SMLS Seamless <br /> CL Centerline FEE Fusion Bonded Epoxy MTR Meter SMYS Specified Minimum Yield Strength a o <br /> CMP Corrugated Metal Pipe FC Face of Curb MW Working Monitor SPEC Specification <br /> CNG Compressed Natural Gas FDP Future Design Pressure MWP Maximum Working Pressure SS Sanitary Sewer <br /> CO County FG FinishedGrade NNorth SSAW Single Submerged Arc-Welded GAS TRANSMISSION <br /> CONIC Concrete FH Fire Hydrant NDE Non-Destructive Examination ST Street ESTIMATING&DESIGN <br /> COND Conduit FIG Figure NOP Normal Operating Pressure STA Station <br /> CP Cathodic Protection Fl Flow Line NPC Non-Protected/Native Coupon STD Standard <br /> CPT Catch Point FUG Flange NTS Not to Scale STL Steel <br /> CROP Conditional Reduction of Pressure FWY Freeway OD Outside Pipe Diameter STPR Strength Test Pressure Report <br /> CTS CouponTest Station GS Natural Gas Service OG Original Ground T Tied(Connected to System) <br /> CU Copper EMS Gas Standards and Specifications OH Overhead TOE Temporary Construction Easement � <br /> CULV Culvert GV Gate Valve P Pipeline TCP Traffic Control Plan g <br /> D Depth GW Natural Gas Well P/L Property Line TD Technical Document A f$, <br /> A DE Dead End H Horizontal PC Point of Curvature TOW T.D.Williamson <br /> DCUST Distribution Customer HDD Horizontal Directional Drill PCF Pressure Control Fitting TEL Telephone <br /> WARNING: PIPELINE-LEGEND&STAMPS NUOEMATL SHEET7 <br /> T IS INFORMCUMENTATI TNS LLL 300'DEEP MP0.18 <br /> CONFIDENTIAL,PROPRIETARY C-1547 <br /> PROPERTY <br /> INSTALL 300'DEEP WELL ANODE Iosm <br /> PROPERTY OF PACIFIC GAS AND 4 0 STOCKTON,SAN JOAQUIN COUNTY <br /> NTEN ECOMPANYMLD IS <br /> INTENDED FOR CIFICG Y BY SHEETHO 3 of T SHEEts <br /> ELECTRIC CDPACIEICGASAND Ke•■■harthel•W. 0 62410 ISSUED mRCONS1RUCr10N JJ030N0 MGV MM GAS TRANSMISE E ELECTRIC <br /> ELECTRIC AGENTS EMPLOYEES • • °rsCUPtIOn PACIFIC GAS AND ELECTRIC COMPANY <br /> AND ITS AGENTS. CeII BBIDTB YOB BIq. Rry 74030790 0 <br /> ®PG&E co. REVISIONS SAN FRANCISCO,CALIFORNIA <br /> 1 2 3 4 5 �I 6 7 a18 9 10 ° "a <br />