Laserfiche WebLink
11 <br />10 September 2008 <br />AGE -NC Project No. 07-1569 <br />Page 4 of 8 <br />hard hat <br />steel -toed boots <br />L` <br />Level D: I half -faced respirator (if necessary) <br />gloves <br />If air purifying respirators are authorized, organic vapor and dust is the appropriate canister for use <br />with the involved substances and concentrations. No down -grading changes of the specified levels <br />of protection shall be made without the approval of the site safety officer and the project team leader. <br />6.0. ON-SITE WORK PLANS <br />Work party(ies) consisting of two persons will perform the following tasks: <br />PROJECT TEAM LEADER <br />NAME TRAINING LEVELF_ TASK <br />Robert Marty 40 hour Hazardous Collect soil and grab groundwater samples; <br />Operations Certified direct borings <br />FIELD CREW <br />NAME <br />TRAINING LEVEL <br />TASK <br />Rebecca (Becca) <br />Natal <br />40 hour Hazardous <br />Operations Certified <br />As directed <br />Richard Marty <br />(Geoprobe operator) <br />40 hour Hazardous <br />Operations Certified <br />Advance borings <br />Keith Lindgren <br />(Geoprobe Operator) <br />40 hour Hazardous <br />Operations Certified <br />Advance borings <br />Matt Buckelew <br />40 hour Hazardous <br />Operations Cerfified <br />Clean equipment / assist Geoprobe operator <br />Jarod Silva <br />40 hour Hazardous <br />Operations Cerfified <br />Clean equipment / assist Geoprobe operator <br />Advanced GeoEnvironmental, Inc. <br />