Laserfiche WebLink
Page I of I <br /> Benjamin Escofto [EH] <br /> From: Christine Zador[christinezador@yahoo.com] <br /> Sent: Monday, November 26, 2012 9:57 AM <br /> To: Benjamin Escotto [EH] <br /> Subject: South Mid Property Ponding proposal for S.J. Rifle& Pistol Range <br /> Attachments: South mid property Ponding DiaA.jpg; South mid property Ponding DiaB.jpg; South mid property <br /> Ponding DiaC.jpg <br /> I will be describing our plan of action in this email and adding attached sketches to visually aid <br /> in understanding our planned process. <br /> Site plan: <br /> Take existing berm directly south of Pistol Range running east to west AND the existing berm <br /> south of pistol range running north to south(diagram A) and screen it for debris. All debris will <br /> go into trash bins. We will then proceed to push that dirt into the area of issue. <br /> We would be continuing the existing grade from above the parking lot(diagram 13) eliminating <br /> any possibilities of standing water. In doing so we will be able to reconstruct the emergency road <br /> leading into the back of the property. <br /> Where water runs off between property lines (diagram C) we will add a culvert pipe and concrete <br /> landing.No digging will be done during this process. The concrete landing will disperse and <br /> slow the water reducing any possibilities of erosion. <br /> We are hoping to receive more dirt from the county to aid in any additional need of dirt to finish <br /> the process. <br /> Thank you for coming out to discuss these matters with us. I will wait to here from you if you <br /> need any additional information, or for the approval to move forward. <br /> Christine Zador <br /> 209-204-4294 <br /> 11/26/2012 <br />