My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1994-2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HEWITT
>
828
>
4400 - Solid Waste Program
>
PR0504222
>
CORRESPONDENCE_1994-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 2:00:05 PM
Creation date
12/29/2020 10:38:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1994-2019
RECORD_ID
PR0504222
PE
4430
FACILITY_ID
FA0006128
FACILITY_NAME
PETERS COUNTY DUMP
STREET_NUMBER
828
Direction
S
STREET_NAME
HEWITT
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
18702006
CURRENT_STATUS
01
SITE_LOCATION
828 S HEWITT RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page I of I <br /> Benjamin Escofto [EH] <br /> From: Christine Zador[christinezador@yahoo.com] <br /> Sent: Monday, November 26, 2012 9:57 AM <br /> To: Benjamin Escotto [EH] <br /> Subject: South Mid Property Ponding proposal for S.J. Rifle& Pistol Range <br /> Attachments: South mid property Ponding DiaA.jpg; South mid property Ponding DiaB.jpg; South mid property <br /> Ponding DiaC.jpg <br /> I will be describing our plan of action in this email and adding attached sketches to visually aid <br /> in understanding our planned process. <br /> Site plan: <br /> Take existing berm directly south of Pistol Range running east to west AND the existing berm <br /> south of pistol range running north to south(diagram A) and screen it for debris. All debris will <br /> go into trash bins. We will then proceed to push that dirt into the area of issue. <br /> We would be continuing the existing grade from above the parking lot(diagram 13) eliminating <br /> any possibilities of standing water. In doing so we will be able to reconstruct the emergency road <br /> leading into the back of the property. <br /> Where water runs off between property lines (diagram C) we will add a culvert pipe and concrete <br /> landing.No digging will be done during this process. The concrete landing will disperse and <br /> slow the water reducing any possibilities of erosion. <br /> We are hoping to receive more dirt from the county to aid in any additional need of dirt to finish <br /> the process. <br /> Thank you for coming out to discuss these matters with us. I will wait to here from you if you <br /> need any additional information, or for the approval to move forward. <br /> Christine Zador <br /> 209-204-4294 <br /> 11/26/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.