Laserfiche WebLink
0 0 <br /> Purposed scope wfwork for waste burial <br /> 1. Grid property in 50foot increments,setting a4foot lath on each grid point <br /> 2. Record elevations ateach grid point onproperty grid map <br /> 3. Excavate to determine top of waste layer/record depth at each point(see attached detail#1) <br /> 4. Explore property for clean fill dirt/determine amount of fill dirt available <br /> G. Determine the amount of fill required at each point/develop cut-fill map(see attached detail# <br /> 2) <br /> 6. Submit survey/cut-fill map to EHD(Robert&Jenni)for review and approval <br /> 7. After approval,create afixed cost ofearth moving and seek financing <br /> 0. Perform each work <br />