k. SIGNS: Sign details shall be consistent with Chapter 9-171 O of the Development Title and be included on the Site Plan. All portions of any sign shall be set back a minimum of 5 feet from any future right-of-way line, including any corner cut-off (snipe). (Development Title Section 9-1710.2[g]) I. BUILDING CODE REQUIREMENTS: The following California Building Code (CBC) and San Joaquin County Ordinance requirements will be applicable to the proposed project. The following conditions shall be addressed prior to submittal of a building permit application to the Building Inspection Division: 1. A building permit for each separate structure or building is required. Submit plans, Specifications and supporting calculations, prepared by a Registered Design Professional (architect or engineer) for each structure or building, showing compliance with The 2019 California Building, Existing Building, Mechanical, Plumbing, Electrical, Energy and Fire Codes as may be applicable. Plans for the different buildings or structures may be combined into a single set of construction documents. 2. A grading permit will be required for this project. Submit plans and grading calculations, including a statement of the estimated quantities of excavation and fill, prepared by a Registered Design Professional. The grading plan shall show the existing grade and finished grade in contour intervals of sufficient clarity to indicate the nature and extent of the work and show in detail that it complies with the requirements of the code. The plans shall show the existing grade on adjoining properties in sufficient detail to identify how grade changes will conform to the requirements of the code. 3. The required plans must be complete at the time of submittal for a building permit. Plans must address building design and construction, fire and life safety requirements, accessibility and show compliance with the current California codes and San Joaquin County ordinances. A complete set of plans must include fire sprinkler plans, truss design submittals, metal building shop drawings, structural plans and calculations, plumbing, electrical and mechanical drawings and energy report. 4. A soils report is required pursuant to CBC§ 1803 for foundations and CBC appendix§ J104 for grading. All recommendations of the Soils Report shall be incorporated into the construction drawings. 5. For each proposed new building, provide the following information on the plans: A. Description of proposed use B. Existing and proposed occupancy Groups C. Type of construction D. Sprinklers (Yes or No E. Number of stories F. Building height G. Allowable floor area H. Proposed floor area I. Occupant load based on the CBC J. Occupant load based on the CPC Modifications to existing buildings are required to include upgrades related to disability access PA-2000216 -Conditions of Approval 3