My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
C E DIXON
>
6755
>
2231-2238 – Tiered Permitting Program
>
PR0543482
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 10:07:39 AM
Creation date
1/7/2021 8:40:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0543482
PE
2232
FACILITY_ID
FA0022432
FACILITY_NAME
HEINZ SEED OPERATIONS
STREET_NUMBER
6755
STREET_NAME
C E DIXON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726030
CURRENT_STATUS
01
SITE_LOCATION
6755 C E DIXON ST
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hazardous Waste Tank =M_-� <br /> System Integrity Report <br /> MMMM M <br /> For <br /> HMT Inspection <br /> The Kraft Heinz Company <br /> Stockton CA February 17,2021 <br /> , Page 6 of 34 <br /> 2.0 SIGNIFICANT FINDINGS <br /> The following is a summary of the significant findings of the inspection. <br /> HISTORY: <br /> This is the first inspection of the Hazardous Waste Tank performed at The Kraft Heinz <br /> Company in the Stockton, CA Seed Operation facility by HMT Inspection. A previous <br /> inspection report by another inspection company is available for this tank / system. The <br /> tank was moved to the site and put into service in 2012 (per client). <br /> TANK AS IDENTIFIED BELOW: <br /> Configuration and nominal capacity for the tank: <br /> Hazardous Waste Tank: 5,800 Gallons <br /> Inspection of the Hazardous Waste Tank and facility revealed no areas of defects or <br /> anomalies that would require immediate corrective action at this time. Reference Section <br /> 3.0 for the identification, diagram, and area layout of the tank, system, and containment <br /> details inspected. <br /> ABOVEGROUND HAZARDOUS WASTE TANK AND FACILITY: <br /> FOUNDATION: The Hazardous Waste Tank rests within a secondary tank in a tertiary <br /> concrete containment area with four (4) structural anchor details that are bolted to the <br /> concrete floor. Steel cables are utilized as hold-downs for the tank. Visual (VT) <br /> inspection found the concrete containment details in acceptable condition at this time. <br /> Four (4) 616-gallon stainless steel open top rinse tanks rest on an elevated concrete <br /> platform on the north side of the concrete containment area. These tanks are bolted to <br /> the foundation beneath. Visual (VT) inspection found these details acceptable. <br /> NDTRPTNE.DOT REV 2 23264941 Hazardous Wast Tank r3(Rev 1).doc 3/16/2021 1:52 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.