Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by Manufacturer 0 Industry Standard Professional Engineer <br /> Test Type Pressure Vacuum © Hydrostatic <br /> Test Equipment Used: Caldwell i Tape Measure <br /> Sump/UDC ID Jet Fuel <br /> Sump Manufacturer Total Containment <br /> Sump Depth (inches) 41.5 inches <br /> Sump Bottom to Top of 23 inches <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 0 <br /> Initial Reading 24.5 inches <br /> Test End Time 60 minutes <br /> Final Reading 24.5 inches <br /> Change in Reading 0 <br /> Pass/Fail Criteria Pass <br /> Tightness Test Results F1 Pass ® Fail ® Pass r] Fall ® Pass ® Fail rl Pass ® Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> ass ail Criteria <br /> Tightness Test Results ® Pass M Fail ® Pass ® Fail r.1 Pass © Fail rl Pass r Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />