Laserfiche WebLink
<br />PA-1900284 – Informational Letters 10 <br />3 1SJCOG. Inc. <br />S J CO G,Inc. <br />Snn Jooq11i11 Co,m!J l\111/ti Speciu Habitat Co11sml(ltio11 & Open Spare P/011 <br />555 Eost Weber Avenue . S tockton, CA 95202 • (209) 235-0600 . FAX (209) 235-0438 <br />SJMSCP HOLD <br />TO: Local Jurisdictioff Commurntv Develooment Deoartment Planning Department. Build ing <br />Department Engineering Depa rtment Survey Department Transportation Depa rtment <br />Other: <br />FROM: Laurel Boyd, SJCOG, Inc. <br />DO NOT AUTHORIZE SITE DISTURBANCE <br />DO NOT ISSUE A BUILDING PERMIT <br />DO NOT ISSUE FOR THIS PROJECT ------ <br />The landowner/developer for this srte has requested coverage pursuant to the San Joaquin County Multi- <br />Species Habitat Conservation and Open Space Plan (SJMSCP). In accordance with that agreement, the <br />Applicant has agreed to: <br />I) SJMSCP Incidental Take Min imization Measures and mitigation requirement: <br />1. Incidental Take Minimization Measures (ITMMs) will be issued to the project and nmst be signed by the <br />project applicant prior to any growld disturbance but no later than six (6) month. from receipt of the ITMMs. <br />If ITMMs are not signed w1tlun six 1110nlhs. the applicant must reappl y for SJMSCP Coverage. Upon receipt <br />of signed ITMMs from project applicant, SJCOG, Inc staff Yt.111 sign the !TM Ms . This is the effective date <br />of the !TM.Ms. <br />2. Under no circwnstance shall ground disturbance occur without compliance and satisfaction of the !TM Ms. <br />3. Upon issuance of fuJly executed !TM Ms and pnor lo any ground disturbance, the project ap plicant nuist· <br />a Post a bond for p1yrnent o f the applicable SJMSCP fee covering the entirety oflhe project acreage <br />being covered (the bond should be val id fo r no longer than a 6 month penod); or <br />Pay 1.he appropriate SJMSCP fee for the entirety of the JXOject acreage being covered; or <br />c Dedicate land in-lieu of fees, either as conservati on easements or fee title; or <br />d Purchase approved mitigation bank credits. <br />4. Within 6 months from the effective date of the ITMMs or issuance of a building permit, whichever occurs <br />first, the project applicant must: <br />a. Pay d1e appropriate SJMSCP for the entuety of the project acreage being covered; or <br />b. Dedicate land in-lieu of fees, either as conscrvotion easement<; or foe title; or <br />c Purchase approved mitigation bank credits. <br />Failure to satisfy the obligations of the mitigation fee shall subject die bond to be call ed. <br />Project Tille: PA-1900284 (SA) <br />Landowner/Applicant: Muhammad Bi lal <br />Assessor Parcel #s: 143-330-29 <br />T ~ R~ Section(s): __ <br />Local Jurisdic tion Contact: Teddie Hernandez <br />The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br />Incidental Take Minimization Measures are properly implemented and monitored and that <br />appropriate fees are paid in compliance with the SJMSCP.