My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013872
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
4010
>
2600 - Land Use Program
>
PA-1900284
>
SU0013872
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2021 8:42:05 AM
Creation date
1/8/2021 11:43:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013872
PE
2631
FACILITY_NAME
PA-1900284
STREET_NUMBER
4010
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215-
APN
14333029
ENTERED_DATE
1/7/2021 12:00:00 AM
SITE_LOCATION
4010 E FREMONT ST
RECEIVED_DATE
1/7/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PA-1900284 – Informational Letters 19 <br />Pacific Gas and <br />Electric Company <br />11. Cathodic P rotection : PG&E pipelines are protected from corrosion wi th an "Impressed <br />Current" cath odic protection system. Any proposed facilities, such as metal conduit, p ipes, <br />service lines, ground rods, anodes, wires, etc. that might affect the pipe line cathodic protection <br />system must be reviewed and approved by PG&E Corrosion Engineering. <br />12. Pipeline Ma rker S igns: PG&E needs to mainta in pipeline marker signs for gas <br />tran smission pipel ines in order to ensure public aware ness of the presence of the pipeli nes. <br />Wrth prior mrtten approval from PG&E Pi peline Services, an existing PG&E pipeline marker sign <br />that is in direct conflict with proposed developments may be temporarily relocated to <br />accommodate construction v,ork. The pipeline marker must be move d back once construction is <br />complete . <br />13. PG&E is also the provider of distri bution facilrties throughout many of the areas within <br />the state of Calfornia. Therefore, any plans that impact PG&E's fa ci lities must be reviewed and <br />approved by PG&E to ensure that no impact occurs which may endanger the safe operation of <br />its facilities . <br />PG&E Gas and Electric Facilities Page 1
The URL can be used to link to this page
Your browser does not support the video tag.