Laserfiche WebLink
A� Environmental Health Department <br />COUNTY <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES [ ] NO[] <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br />certificates for each person installing or testing any component that is repaired or replaced. Ensure a copy of <br />the "Site Health and Safety Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a <br />diagram drawn to scale showing location of repairs and/or replacements. If repairing a component, describe <br />how this will be done. (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br />use the UST installation Application pages 4-8 as necessary for a timely plan review): <br />DisDenser replacement- Install Veeder-Root ISD <br />Removing 3 Gilbarco Dispensers <br />Installation of (3) Wayne Ovation dispensers <br />Install (3) Bravo frames <br />Converting existing INCON system <br />Installation of new Veeder-Root <br />Cold start Veeder-Root <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />Attachments: <br />Dispensers - Wavne Ovation <br />Bravo Conversion Frames - CU250 <br />Veeder-Root -TLS-350 monitor system <br />Veeder-Root ISD Flow meters <br />5. Decontamination Procedures: <br />a. Will piping be decontaminated prior to removal? YES [ ] NO [ ] <br />b. Identify contractor performing decontamination: <br />Name Phone (_)_ <br />Address <br />3 of 6 <br />City Zip <br />