My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2300 - Underground Storage Tank Program
>
PR0231761
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2022 9:07:10 AM
Creation date
1/8/2021 2:29:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231761
PE
2361
FACILITY_ID
FA0002347
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
View images
View plain text
Environmental Health Department <br /> SAN 10 A Q U I N <br /> ----- COU N T Y -- ---- <br /> UNDERGROUND STORAGE TANK FEE WORKSHEET <br /> FACILITY NAME DATE <br /> Ernies General Store 5/25/2021 <br /> FACILITY ADDRESS CITY STATE ZIP CODE <br /> 4407 E . Waterloo Stockton CA 95215 <br /> SERVICE REQUEST (CHOOSE oNEI FEE SUBTOTAL <br /> Repair/Retrofit — Full Permit $456* 456 . 00 <br /> Repair/Retrofit — Minor Plan Check $ 152* <br /> Tank Lining $456* per tank** lined <br /> Temporary Closure $456* <br /> Permanent Tank Closure - Removal $456* per tank** removed <br /> Permanent Tank Closure — Closure in Place $456* per tank** closed in place <br /> Tank Installation $3040* <br /> ANNUAL CUPA OPERATING PERMITS FEE SUBTOTAL <br /> (FOR NEW INSTALLATIONS ONLY - ALL APPLY) <br /> Hazardous Waste Generator <5 tons/yr $249 (if z5 tonslyr, varies) <br /> Hazardous Materials Business Plan ( HMBP) Common $81 or Regular $279 NOT COLLECTED IN ADVANCE <br /> HMBP Chemical Fee $ 17 per chemical NOT COLLECTED IN ADVANCE <br /> Underground Storage Tank - Facility VPH $ 1 , 582 <br /> Underground Storage Tank - Tank $250 per tank** <br /> State Facility Surcharge $49 <br /> State Tank Surcharge 1 $20 per tank** <br /> CERS Processing Fee $ 30 NOT COLLECTED IN ADVANCE <br /> ADDITIONAL FEES FEE SUBTOTAL <br /> ' Failure to Obtain a Permit' Penalty $456 <br /> CERS Consultation $ 152* <br /> New Owner Consultation $ 152 <br /> UNREPORTED TANK FEES SUBTOTAL <br /> (ORIGINAL ANNUAL FEES, LISTED BELOW, WILL BE DOUBLED) <br /> 2015 $550 (facility + 19' tank) + $ 139 per tank** after 1St x2 <br /> 2016 $583 (facility) + $ 139 per tank** x2 <br /> 2017 $641 (facility) + $ 152 per tank** x2 <br /> 2018 VPH $961 or non-VPH $680 (facility) + $228 per tank** x2 <br /> 2019 VPH $961 or non-VPH $680 (facility) + $228 per tank** x2 <br /> TOTAL AMOUNT DUE $ 456 . 00 <br /> * FEES ARE BASED ON THE $152 HOURLY RATE, TIME THAT EXCEEDS FEES PAID WILL BE BILLED TO APPLICANT. <br /> *" EACH COMPARTMENT IN A SPLIT TANK IS COUNTED AS A SEPARATE TANK. <br /> REVISED 8/28/2020 <br /> 1868 E , Hazelton Avenue I Stockton , California 952051 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd . com "' <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).