My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
437
>
2300 - Underground Storage Tank Program
>
PR0506406
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2022 10:18:56 AM
Creation date
1/8/2021 2:36:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0506406
PE
2361
FACILITY_ID
FA0002313
FACILITY_NAME
WILSON WAY CHEVRON
STREET_NUMBER
437
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15113052
CURRENT_STATUS
01
SITE_LOCATION
437 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EMICO Model All 00 Overfill <br /> WHEATON RETAIL Prevention Valve OPV <br /> Flapper Valve Primary Float <br /> � a <br /> Step 4: Slowly insert the Model A0081 - Figure 3 : Hook end secured to the Figure 4: Close-up <br /> 1101 test tool from the bottom of the underside of the flapper valve . <br /> lower tube until the hook end secures to <br /> the underside of the flapper valve . <br /> Refer to Figures 3 and 4 for details. <br /> Testing the Primary Float and Flamer Valve: <br /> - Figure 5 : Primary float, down <br /> - <br /> ° _ �_ ward position . <br /> —r <br /> Step 5 : With the flapper valve latched Step 6 : Using a scribe move the pri- <br /> open , and the hook end secured , gently mary float upward to unlatch the flapper <br /> tug on the test tool , the flapper valve valve , and with the hook end secured , <br /> must remain open . gently tug on the test tool , the flapper <br /> valve must close , the test tool will move <br /> about 3" downward . Refer to Figures Figure 6 : Primary float , upward <br /> 5, 6, 7 and 8 for details. position , <br /> L _ <s <br /> . y <br /> - = t : - <br /> Figure 7 : Primary float upward , flapper Figure 8 : Primary float upward , flapper Step 7 : Using the scribe move the prim <br /> valve unlatched and closing . valve unlatched and closed . mary float downward . <br /> IMPORTANT. Perform steps 6 Step 10 : Re-install the fill adapter, cap <br /> through 8 a minimum of three times and spill container lid on the tank fill <br /> to assure the primary float, latch and riser. <br /> flapper valve components of the <br /> Model A1100 OPV are operating prop = <br /> erly. <br /> Step 9 : Lift the Model A1100 OPV with <br /> the collar upward and re-install on the 2300 Industrial Park Dr. • Wilson , NC 27893 <br /> Step 8 : With the hook end secured , tank fill riser. Replace the drop tube <br /> gently allow the flapper valve to move o-rin art number 569461 if damaged 252-243-0150 • 252- ail .co 59 (fax ) <br /> 9 p 9 www. emcoretail .com <br /> upward and spring back into an open or missing . © 2018 Emco Wheaton Retail Corporation <br /> position , tug gently on the test tool , the <br /> flapper valve must relatch and remain 2 08/18, e <br /> 08/18, Rev. A <br />
The URL can be used to link to this page
Your browser does not support the video tag.