My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
1728
>
2800 - Aboveground Petroleum Storage Program
>
PR0540694
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 9:40:13 AM
Creation date
1/11/2021 9:25:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0540694
PE
2832
FACILITY_ID
FA0009536
FACILITY_NAME
CONCRETE INC
STREET_NUMBER
1728
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25311027
CURRENT_STATUS
01
SITE_LOCATION
1728 LINNE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 General FacilityInformation <br /> Name of Facility: <br /> IARC TRACY PLANT <br /> Location of Facili <br /> 1728 W. Unne Road <br /> Tracy, CA 95376 <br /> (209) 933-6980— Central Dispatch <br />`I <br /> Section 8, Township 3 South, Range 5 Fast <br /> Latitude N 37'41' 33" <br /> Longitude W 121027'12" <br /> The elevation of the site is approximately of 170 feet above sea level at the fuel AST's location. <br /> The facility occupies a 6 acre parcel of privately-owned land located on the south side of Linne <br /> Road. The site is in a developed industrial setting with adjacent rural fiat terrain. Surrounding <br /> the facility are several parcels hosting industrial, airport, and commercial operations. (Figure 1, <br /> "LOCATION MAP"). <br /> Type of Facility: <br /> The facility serves as a Concrete Ready Mix Batch Plant, Truck Fueling and Parking Facility. <br /> Structures at the facility consist of a two-story controlldispatch office, raw material (sand and <br /> aggregate) bunkers, hoppers and conveyors, batch plant, and storage buildings with a plant hot <br /> water heater and truck parking (Figure 2, SITE PLAN). Oil products are used as fuel. Diesel <br /> products are stored in a 10,000-gallon and a 500-gallon double wall aboveground storage tank <br /> (ASTs) located in the southcentral portion of the facility. The northeast quarter of the site is <br /> paved. The remainder of the site, including the area surrounding the concrete pads on which the <br /> ASTs are mounted is graded natural material. Water supply for the site is supplied by private <br /> well. <br /> Drainage off site is possible to the northeast and is directed to a storm water retention basin <br /> immediately acljac;ent to the parcel. The capacity of the pond is sufficient to hold anticipated <br /> storm water runoff, industrial discharges and spills. <br /> Diesel fuel and othre? petioleurn products are delivered to the facility via tar'rk tacks during <br /> norrnal operating hours. The pUnl: operates on an as treaded basis with operating personnel <br /> borrowed frorn rather company facilities. When operating, typical hours occur between 6.00 a.m. <br /> to 6;00 p..r .. Monday through Friday, and 6:00 a.rrr, to 2:00 p.m., Saturday. personnel include; <br /> a batch plant operator, yard person and trunk drivers. Personnel are always present at the <br /> facility during hours of operation.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.