My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
1728
>
2800 - Aboveground Petroleum Storage Program
>
PR0540694
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 9:40:13 AM
Creation date
1/11/2021 9:25:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0540694
PE
2832
FACILITY_ID
FA0009536
FACILITY_NAME
CONCRETE INC
STREET_NUMBER
1728
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25311027
CURRENT_STATUS
01
SITE_LOCATION
1728 LINNE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15.7 Observation of Disposal Facilities for Effluent Discharge <br /> — 40 CFR 112. (c)(9) <br /> Settling basin collects some area surface runoff. If water were to be discharged offsite it would <br /> be inspected for oil or oil sheen prior to discharge. Any discharge would be performed in <br /> accordance with the requirements of t t Storm he General Industrial <br /> Water Permit. <br /> 15.8 Visible Oil Leak Corrections from Tank Seams and Gaskets <br /> — 40 CFR 112.8 (c)(1 ) <br /> Visible oil leaks are reported to management so that they can be fixed immediately. Onsite <br /> maintenance personnel may correct minor piping leaks. Repairs to the structural components of <br /> the tank shell will be performed by a licensed tank repair and service company after <br /> arrangements have been made to pump off the stored liquid to another suitable storage tank. <br /> Measures will be taken to minimize and mitigate the leak, while awaiting repair. The facility <br /> personnel will make arrangements to clean up any spilled oil immediately. <br /> 1&9 Mobileor Portable Oil Storage Containers— 40 CFR 11 <br /> (00 1) <br /> No storage of product in mobile or portable containers is conducted at the IARC TRACY <br /> PLANT. <br /> 16.0 Facility Transfer Operations — 40 CFR 112.8(d) <br />,I <br /> No buried oil product piping exists at this facility. Therefore, this item does not apply. <br /> A fuel dispenser is mounted at the north end of each diesel AST. The piping has a very short <br />'i roan from the tank to the pump. Pipe supports are constructed of steel. Elbow joints provide <br /> adequate thermal expansion and contraction for the short: run of pipe. <br />,j The aboveground valves and piping are currently in satisfactory condition and are examined <br />,j during the monthly inspection. The inspections are documented as provided in Appendix B. <br /> 'Fhe dispenser and ext rior AST tank are protected from vehicularifflp cl' by G(M rely; Nlked <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.