Laserfiche WebLink
Monitoring System Certification <br /> LIST Monitoring Site Plan <br /> Site Address: TOKAYSHELL 420 KETTLEMAN LANE LODI CA 55240 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . , . . . . . . . <br /> KEY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ❑fE . . . . . 87. <br /> A=ANNULAR <br /> Y-1+APOR , . . . . . . 6. . . 6 . . . . . . . <br /> P=PROBE . . . . . . . . . . . . . . . <br /> T=TURBINE 5. .7. Y <br /> T <br /> x=SENSOR \ <br /> o—OVERFILL SENSOR <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 2. . .4. . . . . . . . . . <br /> . . . . . . . . . O O <br /> . . . . . . . . . . . . . . . . 1. . . . . . . . . .3 . . . . . . . . . . , . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> x <br /> x <br /> P <br /> . . . . . . . . . . . . . . . . . . . . . . . . . T <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . \ <br /> 19 9. . <br /> X <br /> . . . . . . . . . . . . . . . . 0 0 <br /> . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100. . , . .97. . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . .WASTE OIL. . .VENTS <br /> . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . <br /> . p CAS . <br /> . . . . . . . . . . . . . . A7'C <br /> [late map was drawn: <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan waS prepared. <br /> Monitoring System Certification Page 4 of 2/21/07 <br />