Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report orm <br /> 6. TANK SECONDARY CONTAINMENT TEST (ANNULAR) <br /> Test Method Developed by El Manufacturer E Industry Standard E] Professional Engineer <br /> Test Type El Pressure Z Vacuum ❑ Hydrostatic <br /> Test Equipment Used: PEI/ RP1200/ 10Hg for 1 hr <br /> Tank ID 87/91 DSUE85 <br /> Tank Manufacturer Unknown Unknown <br /> T <br /> a <br /> n <br /> k <br /> C <br /> ap <br /> ac <br /> it <br /> y <br /> N/A N/A <br /> Test StarTime 9:45 11:3 <br /> 5 <br /> Initial Reading -10 -10 <br /> Test End Time 10:45 12:3 <br /> 5 <br /> Final Reading -10 -10 <br /> Change <br /> in Reading 0 0 <br /> Pass/Fail Criteria 0 0 0 0 <br /> Tightness Test Results Pass 0 Fail Z Pass 0 Fail ❑ Pass 0 Fail Ej Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST (SEC LINE) <br /> Test Method Developed by El Manufacturer Z Industry Standard E] Professional Engineer <br /> Test Type Z Pressure El Vacuum E] Hydrostatic_ <br /> Test Equipment Used: PEI/ RP1 200/5 psi for 1 HR <br /> Pipe Run ID 87 91 <br /> Pipe Manufacturer Unknown Unknown <br /> Test Start Time 11:10 9:45 <br /> EInitial Reading 5 5 <br /> n itia I Reading <br /> ng <br /> Test End Time 12:10 10:45 <br /> Final Reading 5 5 <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria 0 0 0 0 <br /> Tightness Test Results Z Pass E] Fail E Pass El Fail- El Pass El Fail E] Pass E] Fail <br /> Pi <br /> p <br /> e <br /> R <br /> u <br /> n <br /> I <br /> D <br /> Pipe Manu <br /> f <br /> a <br /> ct <br /> u <br /> rer <br /> Test StarTime <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> — <br /> Pass/Fail Criteria 0 0 — 0 0 <br /> Tightness Test Results 0 Pass E] Fail [I Pass E] Fail E] Pass El Fail El Pass E] Fail <br /> Page 2 of 6 <br />