Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Tank ID 1 Diesel <br /> Tank Manufacturer Owens Corn <br /> Tank Capacity 20,000 <br /> Test Start Time Wet Annular <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail_j ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ® Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauge <br /> Pipe Run ID 1 Diesel 1A Diesel 2A Diesel 3A Diesel <br /> Pipe Manufacturer Smith Smith Smith Smith <br /> Test Start Time 10:35 8:00 8:25 8:30 <br /> Initial Reading 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time 11:35 9:00 9:25 9:30 <br /> Final Reading 5 PSI 5 PSI 5 PSI 5 PSI <br /> Change in Reading 0 0 0 0 <br /> PasslFail Criteria 0 Drop 0 Drop 0 Drop 0 Drop <br /> Tightness Test Results ® Pass ❑ Fal ® Pass ❑ Fail M Pass ❑ Fail ® Pass ❑ Fail <br /> Pipe Run ID 4A Diesel 5A Diesel <br /> Pipe Manufacturer Smth Smith <br /> Test Start Time 8.40 9:10 <br /> Initial Reading 5 PSI 5 PSI <br /> Test End Time 9:40 10:10 <br /> Final Reading 5 PSI 5 PSI <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria 0 Drop 0 Drop <br /> Tightness Test Results ® Pass ❑ Fail I ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />