My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 4:41:16 PM
Creation date
1/11/2021 10:05:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Tank ID 1 Diesel <br /> Tank Manufacturer Owens Corn <br /> Tank Capacity 20,000 <br /> Test Start Time Wet Annular <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail_j ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ® Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauge <br /> Pipe Run ID 1 Diesel 1A Diesel 2A Diesel 3A Diesel <br /> Pipe Manufacturer Smith Smith Smith Smith <br /> Test Start Time 10:35 8:00 8:25 8:30 <br /> Initial Reading 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time 11:35 9:00 9:25 9:30 <br /> Final Reading 5 PSI 5 PSI 5 PSI 5 PSI <br /> Change in Reading 0 0 0 0 <br /> PasslFail Criteria 0 Drop 0 Drop 0 Drop 0 Drop <br /> Tightness Test Results ® Pass ❑ Fal ® Pass ❑ Fail M Pass ❑ Fail ® Pass ❑ Fail <br /> Pipe Run ID 4A Diesel 5A Diesel <br /> Pipe Manufacturer Smth Smith <br /> Test Start Time 8.40 9:10 <br /> Initial Reading 5 PSI 5 PSI <br /> Test End Time 9:40 10:10 <br /> Final Reading 5 PSI 5 PSI <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria 0 Drop 0 Drop <br /> Tightness Test Results ® Pass ❑ Fail I ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.