My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2512
>
2300 - Underground Storage Tank Program
>
PR0232418
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2022 10:39:23 AM
Creation date
1/11/2021 1:05:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0232418
PE
2361
FACILITY_ID
FA0004064
FACILITY_NAME
WATERLOO LIQUOR
STREET_NUMBER
2512
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14128102
CURRENT_STATUS
01
SITE_LOCATION
2512 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elite IV Contractors <br /> Date: 1/12/2021 <br /> SR 0082719 <br /> Waterloo Liquor 2512 E Waterloo Rd Stockton CA 95205 <br /> Request Inspection(2) for 1/14/2021, Thursday @ 10:00 am <br /> Scope of Work: Replace 87 spill container& 87 drop tube and shut off valve flapper on <br /> the underground storage tank. <br /> Inspection: <br /> b) Spill bucket test. Verify minimum 5-gallon capacity and pass a one-hour <br /> hydrostatic test(or equivalent). Proper drainage must also be verified. <br /> c) Overfill prevention verification. Measurement of drop tubes to verify 95%tank <br /> volume shut off. Verification of flapper functionality. Ensure that all pertinent <br /> tank charts and calculations are available for review at the time of inspection. <br /> d) Verification that ball float(s), if installed, do not interfere with the installed <br /> flapper valve. <br /> e) Since concrete will be broken near the 87 tank, a secondary containment test must <br /> be performed on the 87 tank once concrete is poured in accordance with the <br /> manufacturer's guidelines. <br /> Thank You, <br /> Deborah Jones <br /> dispatch(d),eliteiv.com <br /> (209)461-6337 <br /> Phn: 209.461.6337 Fax: 209.461.6342 1 2535 Wigwam Dr. Stockton, CA 95205 <br /> Email: dispatch@eliteiv.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.