My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:17 PM
Creation date
1/13/2021 7:40:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> Z Check this box if tank gauging is used only for inventory control. <br /> lJ Check this box if Na tank gauging equipment is installed. Yes No NA <br /> Do not complete this section if either box is checked. <br /> All wiring has been: 1)visually inspected for kirks, breaks and proper entry and U lj Ll <br /> termination;and 2 tested for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup L J Ll <br /> to ensure that floats move freely, funGtionally tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? Q D 0 <br /> Was accuracy of system's water level readings tested? Ll A Li <br /> Were all probes reinstalled properly? L lj U <br /> Were all items on the equipment manufactures maintenance checklist completed? 2 1 El <br /> Probe ID Probe Model Tanks Monitored Pass Fail <br /> Lj Li <br /> Lj Li <br /> L] Ll <br /> Ll U <br /> Ll Ll <br /> 9. COMMENTS <br /> Describe all answers marked"No"or"Fail'and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.